Optimizing the sizes of wind and photovoltaic plants complementarily operating with cascade hydropower stations: Balancing risk and benefit

2022 ◽  
Vol 306 ◽  
pp. 117968
Author(s):  
Xin Wen ◽  
Yuanliang Sun ◽  
Qiaofeng Tan ◽  
Zhengyang Tang ◽  
Zhenni Wang ◽  
...  
IEEE Access ◽  
2020 ◽  
Vol 8 ◽  
pp. 226754-226772
Author(s):  
Trong-The Nguyen ◽  
Hong-Jiang Wang ◽  
Thi-Kien Dao ◽  
Jeng-Shyang Pan ◽  
Jian-Hua Liu ◽  
...  

2020 ◽  
Vol 12 (5) ◽  
pp. 053501
Author(s):  
Yanmei Zhu ◽  
Shijun Chen ◽  
Guangwen Ma ◽  
Weibin Huang ◽  
Xiaoyan Han ◽  
...  

2018 ◽  
Vol 246 ◽  
pp. 02036 ◽  
Author(s):  
Ying Yang ◽  
Weibin Huang ◽  
Guangwen Ma ◽  
Shijun Chen ◽  
Gang Liu ◽  
...  

Under the background of the electricity market reform, if the multi-owner cascade hydropower stations bid separately, the overall competitive advantages of river basin cannot be exerted, and the overall benefits cannot achieve the maximization. Based on the operation characteristics of cascade hydropower stations and the rule of competitive bidding, this paper established a bi-level optimal model for bidding game in day-ahead market, and used the Nash equilibrium principle of the game theory and genetic algorithm to solve this model, the optimal bidding strategies of the multi-owner cascade hydropower stations have been solved under the circumstances of bidding by oneself and alliance. The results from the calculating examples showed that the unified price declaration of the multi-owner cascade hydropower stations in day-ahead market can improve the overall and individual generation efficiency, and proved the effectiveness and feasibility of the combined bidding strategy in power market.


2018 ◽  
Vol 246 ◽  
pp. 01107
Author(s):  
Wei Luo ◽  
Qingxiang Zhong ◽  
Faying Gu

The paper conducts an in-depth study on the real-time dispatching involved in joint operation among giant cascade hydropower stations with high-intensity peak-load and frequency regulation demand, and proposes anintelligent load control technology for cascade hydropower stations in the coordination mode of station and power grid. Aiming to water level safety control of runoff power stations and rapid response to load regulation requirements of the power grid, taking 10 types of constraints such as output, water volume and flow rate into consideration, a model cluster is established through the layered control principle to realize real-time intelligent load allocation and economic operation among Pubugou, Shenxigou and Zhentouba stations. Dadu River has become the first large-scale river basin in China to realize “one-key dispatch” of multiple stations, and has achieved good demonstration effect.


Sign in / Sign up

Export Citation Format

Share Document