scholarly journals Economic Feasibility Study of a Small-scale Biogas Plant Using a Two-stage Process and a Fixed Bio-film Reactor for a Cost-efficient Production

2016 ◽  
Vol 95 ◽  
pp. 385-392 ◽  
Author(s):  
Roberto Renda ◽  
Emanuele Gigli ◽  
Andrea Cappelli ◽  
Silvano Simoni ◽  
Elisa Guerriero ◽  
...  
Author(s):  
Murugan Paradesi Chockalingam ◽  
Navaneethakrishnan Palanisamy ◽  
Saji Raveendran Padmavathy ◽  
Edwin Mohan ◽  
Beno Wincy Winsly ◽  
...  

Processes ◽  
2016 ◽  
Vol 4 (4) ◽  
pp. 54 ◽  
Author(s):  
Aikaterini Anastasopoulou ◽  
Sughosh Butala ◽  
Bhaskar Patil ◽  
John Suberu ◽  
Martin Fregene ◽  
...  

Clean Energy ◽  
2022 ◽  
Vol 6 (1) ◽  
pp. 891-904
Author(s):  
Sina Semeskandeh ◽  
Mehrdad Hojjat ◽  
Mohamad Hosseini Abardeh

Abstract Inverters play a significant role in the configuration of grid-connected photovoltaic (PV) systems. The perturb-and-observe (P&O) algorithm is a common method to derive the maximum power from grid-connected inverters; however, the possibility of losing maximum power due to sudden changes in radiation is a significant drawback of this control strategy. To overcome this barrier, the two-stage multi-string inverter using the ZETA DC–DC converter and a novel P&O algorithm has been proposed to increase the efficiency of these systems. The proposed inverter has been simulated in MATLAB/SIMULINK software. To investigate the performance of the proposed inverter, technical, environmental and economic feasibility studies have been performed for the construction of a 5-kW PV power plant in a northern city of Iran (Sari) using the RETScreen software developed by Natural Resources Canada. On the other hand, most feasibility studies for power-plant construction are based on the concept of inverter peak efficiency, which leads to non-optimal system design due to the short operation duration of the inverter at this value. However, the weighted European efficiency has been used in the feasibility study for more accurate computations. Moreover, the performance of the proposed inverter is compared to that of a two-stage multi-string inverter using a conventional P&O algorithm and the single-stage (central) inverter. The simulation results indicated that the proposed inverter injects 7.6 MW of power into the grid per year. Moreover, it prevents the emission of 88 tons of CO2 (over 20 years), which is equivalent to saving 1883.5 litres of gasoline per year.


2021 ◽  
Vol 14 (1) ◽  
Author(s):  
Kengo Sasaki ◽  
Daisuke Sasaki ◽  
Yota Tsuge ◽  
Masahiko Morita ◽  
Akihiko Kondo

Abstract Background It is desirable to improve the anaerobic digestion processes of recalcitrant materials, such as cellulose. Enhancement of methane (CH4) production from organic molecules was previously accomplished through coupling a bioelectrochemical system (BES); however, scaling-up BES-based production is difficult. Here, we developed a two-stage process consisting of a BES using low-cost and low-reactive carbon sheets as the cathode and anode, and a fixed film reactor (FFR) containing conductive material, i.e., carbon fiber textiles (CFTs) (:BES → FFR). By controlling the cathodic current at 2.7 μA/cm2 without abiotic H2 production, the three-electrode BES system was operated to mimic a microbial electrolysis cell. Results The thermophilic BES (inlet pH: 6.1) and FFR (inlet pH: 7.5) were operated using hydraulic retention times (HRTs) of 2.5 and 4.2 days, respectively, corresponding to a cellulose load of 3555.6 mg-carbon (C)/(L day). The BES → FFR process achieved a higher CH4 yield (37.5%) with 52.8 vol% CH4 in the product gas compared to the non-bioelectrochemical system (NBES) → FFR process, which showed a CH4 yield of 22.1% with 46.8 vol% CH4. The CH4 production rate (67.5 mM/day) obtained with the BER → FFR process was much higher than that obtained using electrochemical methanogenesis (0.27 mM/day). Application of the electrochemical system or CFTs improved the yields of CH4 with the NBES → FFR or BES → non-fixed film reactor process, respectively. Meta 16S rRNA sequencing revealed that putative cellulolytic bacteria (identified as Clostridium species) were present in the BES and NBES, and followed (BES→ and NBES→) FFR. Notably, H2-consuming methanogens, Methanobacterium sp. and Methanosarcina sp., showed increased relative abundances in the suspended fraction and attached fraction of (BES→) FFR, respectively, compared to that of (NBES→) FFR, although these methanogens were observed at trace levels in the BES and NBES. Conclusions These results indicate that bioelectrochemical preprocessing at a low current effectively induces interspecies H2 transfer in the FFR with conductive material. Sufficient electrochemical preprocessing was observed using a relatively short HRT. This type of two-stage process, BES → FFR, is useful for stabilization and improvement of the biogas (CH4) production from cellulosic material, and our results imply that the two-stage system developed here may be useful with other recalcitrant materials.


2020 ◽  
Vol 12 (12) ◽  
pp. 4-9
Author(s):  
Pavel A. BUTYRIN ◽  

The historical context in which the State Plan for Electrification of Russia (GOELRO) was developed, establishment of the GOELRO Commission, the GOELRO Plan content, the specific features of its implementation, and the role of the plan in the soviet period of Russia’s history are considered. Attention is paid to the electrification plants of other countries and territories of all inhabited continents, and to the participation of states in the electrification of countries and regions with small-scale and agricultural production in the 1920 s. The specific features pertinent to the electrification of the Russian Socialist Federative Soviet Republic are pointed out, namely, low starting conditions (in 1923, the energy consumption per capita in Russia was 100 times lower than that in Norway), its being state-owned in nature and revolutionary in its purpose: to get done with the main upheavals in the country and to shift the national economy for fore efficient production. The role of V.I. Lenin and G.M. Krzhizhanovsky, who were the initiators of the electrification of Russia, is analyzed in detail. A conclusion is drawn about the need to study both the GOELRO Plan itself and the specific features and circumstances of its implementation within the framework of training modern specialists in electrical engineering.


2015 ◽  
Vol 14 (4) ◽  
pp. 745-749
Author(s):  
Daisuke Tashima ◽  
Yoki Asano ◽  
Shigeki Tomomatsu ◽  
Yasuhiro Sugimoto

Sign in / Sign up

Export Citation Format

Share Document