An improved method for long-term stability evaluation of strip mining and pillar design
2018 ◽
Vol 107
◽
pp. 25-30
◽
Keyword(s):
Keyword(s):
2017 ◽
Vol 38
(6)
◽
Keyword(s):
2012 ◽
Vol 30
◽
pp. 145-154
◽
Keyword(s):
2018 ◽
Vol 2018.24
(0)
◽
pp. OS1011
2018 ◽
Vol 39
(3)
◽
pp. 305-312
◽
2015 ◽
Vol 2015.20
(0)
◽
pp. 95-98
2015 ◽
Vol 3
(10)
◽
pp. 2043-2055
◽
Keyword(s):
2015 ◽
Vol 11
(4)
◽
pp. 391-399
◽