A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization
2018 ◽
Vol 188
◽
pp. 575-588
◽
2018 ◽
Vol 100
(5-8)
◽
pp. 1419-1432
◽
2018 ◽
Vol 32
(34n36)
◽
pp. 1840112
◽
2020 ◽
2017 ◽
Vol 53
(5)
◽
pp. 12
◽
An improved bacterial foraging optimization for multi-objective flexible job-shop scheduling problem
2018 ◽
Vol 51
(4-6)
◽
pp. 323-332
◽