Risk assessment for dangerous sections of the levees: A case study in Guangdong Province, China

2020 ◽  
Vol 185 ◽  
pp. 105061
Author(s):  
Xinchi Chen ◽  
Dong Huang ◽  
Xiaohong Chen ◽  
Weihang Lian ◽  
Lizhong Gu ◽  
...  
2020 ◽  
Vol 12 (10) ◽  
pp. 4212
Author(s):  
Zhicheng Gao ◽  
Rongjin Wan ◽  
Qian Ye ◽  
Weiguo Fan ◽  
Shihui Guo ◽  
...  

Typhoons and cyclones are the most impacting and destructive natural disasters in the world. To address the shortcomings of a previous typhoon disaster risk assessment (for example, human factors were involved in determining weights by importance, and this affected the experimental results), an emergy method, which converts energy flows of different properties into the same solar energy basis for a convenient comparison, was used to assess the risk of regional typhoon disasters. Typhoon disaster-related data from 2017 were used to develop an index system including resilience, potential strength, and sensitivity which was in turn applied to assess typhoon disaster risks in Zhuhai City, Guangdong Province, China. The results showed that the spatial distribution of the typhoon disaster risks in Zhuhai significantly differed, with the highest risk in Xiangzhou district, the second highest risk in Doumen district, and the lowest risk in Jinwan district. In addition, improving the level of regional resilience can effectively reduce risks from typhoon disasters. The application of the emergy method in a typhoon disaster risk assessment may provide some theoretical support for national and regional governmental strategies for disaster prevention and reduction.


2018 ◽  
Author(s):  
Michael H. Azarian

Abstract As counterfeiting techniques and processes grow in sophistication, the methods needed to detect these parts must keep pace. This has the unfortunate effect of raising the costs associated with managing this risk. In order to ensure that the resources devoted to counterfeit detection are commensurate with the potential effects and likelihood of counterfeit part usage in a particular application, a risk based methodology has been adopted for testing of electrical, electronic, and electromechanical (EEE) parts by the SAE AS6171 set of standards. This paper provides an overview of the risk assessment methodology employed within AS6171 to determine the testing that should be utilized to manage the risk associated with the use of a part. A scenario is constructed as a case study to illustrate how multiple solutions exist to address the risk for a particular situation, and the choice of any specific test plan can be made on the basis of practical considerations, such as cost, time, or the availability of particular test equipment.


2000 ◽  
Vol 14 (5) ◽  
pp. 1264-1270 ◽  
Author(s):  
Elisabeth Slooten ◽  
David Fletcher ◽  
Barbara L. Taylor
Keyword(s):  

2020 ◽  
Vol 34 (5) ◽  
pp. 627-640 ◽  
Author(s):  
Shi Xianwu ◽  
Qiu Jufei ◽  
Chen Bingrui ◽  
Zhang Xiaojie ◽  
Guo Haoshuang ◽  
...  

IEEE Access ◽  
2021 ◽  
pp. 1-1
Author(s):  
Amir Farmahini Farahani ◽  
Kaveh Khalili-Damghani ◽  
Hosein Didehkhani ◽  
Amir Homayoun Sarfaraz ◽  
Mehdi Hajirezaie

Sign in / Sign up

Export Citation Format

Share Document