Design, construction and monitoring of an underwater retaining wall close to an existing immersed tunnel

2022 ◽  
Vol 120 ◽  
pp. 104311
Author(s):  
C. Bauduin ◽  
A.A. Kirstein
2012 ◽  
Vol 204-208 ◽  
pp. 1449-1453
Author(s):  
Gang Wei ◽  
Hui Jie Qiu ◽  
Xin Jiang Wei

The long-term uneven settlement may cause the pipe structure cracking, leakage or even serious damage during the operation of the immersed tunnel. Settlement control measures of immersed tunnel were generalized from design-construction-operation three stages as the time order, and the control measures in the construction stage was particular emphasized. The treatment methods of the base layer were reclassified into compact the base, replace the base and pile base three types and relative project cases were enumerated. Contrary to the shortage of present stage, control measures and suggestion that fit soft base were raised after compare.


Author(s):  
Petar Halachev ◽  
Victoria Radeva ◽  
Albena Nikiforova ◽  
Miglena Veneva

This report is dedicated to the role of the web site as an important tool for presenting business on the Internet. Classification of site types has been made in terms of their application in the business and the types of structures in their construction. The Models of the Life Cycle for designing business websites are analyzed and are outlined their strengths and weaknesses. The stages in the design, construction, commissioning, and maintenance of a business website are distinguished and the activities and requirements of each stage are specified.


PCI Journal ◽  
1997 ◽  
Vol 42 (4) ◽  
pp. 30-40
Author(s):  
Roderic A. Ellman ◽  
Simon Harton ◽  
Harold E. Wescott

PCI Journal ◽  
2000 ◽  
Vol 45 (2) ◽  
pp. 28-39 ◽  
Author(s):  
Arnfinn Rusten ◽  
Janice Zahn
Keyword(s):  

PCI Journal ◽  
1994 ◽  
Vol 39 (3) ◽  
pp. 12-25 ◽  
Author(s):  
Lisa Matthews ◽  
Herman C. Himes ◽  
John L. Cronin

Sign in / Sign up

Export Citation Format

Share Document