scholarly journals Opportunities for Systematically Valuing Ecosystem Service Benefits Produced by Federal Conservation Programs

2020 ◽  
Vol 49 (1) ◽  
pp. 178-191
Author(s):  
Thomas P. Holmes

Federal agencies invest taxpayer dollars every year in conservation programs that are focused on improving a suite of ecosystem services produced on private lands. A better understanding of the public benefits generated by federal conservation programs could help improve governmental efficiency and economic welfare by providing science-based evidence for use in policy decision-making regarding targeting of federal conservation investments. Of specific concern here are conservation investments made by the U.S. Department of Agriculture (USDA). While previous research has shown that efficiency gains are possible using cost-benefit analysis for targeting conservation investments, agency-wide implementation of this approach by policy makers has been constrained by the limited availability of location-specific information regarding conservation benefits. Cost-effective opportunities for integrating location-specific ecosystem service valuation research with USDA conservation decision-making include: (1) institutionalizing funding of comparable studies suitable for benefit transfer, (2) utilizing non-traditional data sources for research complementing benefit transfer, and (3) creating a state-of-the-art program for developing and communicating research in ecosystem service valuation exemplifying the highest standards of scientific conduct.

2008 ◽  
Vol 5 (5) ◽  
pp. 2817-2857
Author(s):  
E. S. Chung ◽  
K. S. Lee

Abstract. This study presents a new methodology not only to evaluate willingness to pays (WTPs) for the improvement of hydrological vulnerability using a choice experiment (CE) method but also to do a cost-benefit analysis (CBA) of some feasible alternatives combing the derived WTPs with an alternative evaluation index (AEI). The hydrological vulnerability consists of potential streamflow depletion (PSD), and potential water quality deterioration (PWQD) and can be quantified using a multi-criteria decision making technique and pressure-state-response (PSR) framework. PSD and PWQD not only provide survey respondents with sufficient site-specific information to avoid scope sensitivity in a choice experiment but also support the standard of dividing the study watershed into six sub-regions for site-fitted management. Therefore CE was applied to six regions one after the other, in order to determine WTPs for improvements on hydrological vulnerability considering the characteristics which are vulnerability, location, and preferences with regard to management objectives. The AEI was developed to prioritize the feasible alternatives using a continuous water quantity/quality simulation model as well as multi-criteria decision making techniques. All criteria for alternative performance were selected based on a driver-pressures-state-impact-response (DPSIR) framework, and their weights were estimated using an Analytic Hierarchy Process (AHP). In addition, the AEI that reflects on residents' preference with regard to management objectives was proposed in order to incite the stakeholder to participate in the decision making process. Finally, the economic values of each alternative are estimated by a newly developed method which combines the WTPs for improvements on hydrologic vulnerability with the AEI. This social-economic-engineering combined framework can provide the decision makers with more specific information as well as decrease the uncertainty of the CBA.


2020 ◽  
Vol 12 (15) ◽  
pp. 6156
Author(s):  
Nataša Šuman ◽  
Mojca Marinič ◽  
Milan Kuhta

Sustainable development is a priority for the future of our society. Sustainable development is of particular importance to the Architecture, Engineering, and Construction (AEC) industry, both for new buildings and for the renovation of existing buildings. Great potential for sustainable development lies in the renovation of existing office buildings. This paper introduces a new framework for identifying the best set of renovation strategies for existing office buildings. The framework applies selected green building rating system criteria and cost-effective sustainable renovation solutions based on cost-benefit analysis (CBA), and thus provides a novelty in decision-making support for the sustainable renovation of office buildings at an early-stage. The framework covers all necessary steps and activities including data collection, determination of the required level of renovation, selection of the green building rating system, identification of impact categories and criteria, and final evaluation and decision-making using CBA. The framework can be used in conjunction with different systems and according to different regional characteristics. The applicability of the addressing procedure is shown through a case study of a comprehensive renovation of an office building in the city of Maribor.


2004 ◽  
Vol 11 (5) ◽  
pp. 307-312 ◽  
Author(s):  
Gerard Fuster ◽  
Marta Schuhmacher ◽  
José L. Domingo

2009 ◽  
Vol 11 (02) ◽  
pp. 245-265 ◽  
Author(s):  
P. RAM BABU ◽  
NALLATHIGA RAMAKRISHNA

Cost-Benefit Analysis (CBA) has been serving as an important tool for decision making with regard to the development projects involving large investments. The Social Cost-Benefit Analysis (SCBA) is an extension of the CBA to certain social impacts, which hitherto were not measured. As the impacts of development projects on ecology and environment assumed importance, measuring the corresponding costs and benefits also began to assume significance. With the advancement in economic valuation techniques over time, measurement could be done and the framework of SCBA has been extended to incorporate the same. Moreover, unlike the CBAs, which do not account for the distributional aspects, the SCBA can potentially account for these. This paper presents a case study of extending the SCBA framework to include social and environmental impacts of a large water resource development project in India. It emphasises the distribution of project benefits and costs over stakeholders, spatial locations and time horizons so as to demonstrate the utility of extended SCBA in project decision making. It is observed that both the numeraire measure i.e. cost-benefit ratio, as well as the distributional analysis present a favourable case for the project.


Author(s):  
Sandy A. Lamp ◽  
Kathleen M. Hargiss ◽  
Caroline Howard

This article is derived from a qualitative multicase study with two settings that explored the way decisions are made in two IT organizations regarding process improvement initiatives by using face-to-face semi-structured interviews with 20 IT process owners and managers. The two participating organizations are a healthcare insurance company and a manufacturer of electronic interconnects. The study sought to uncover (a) how IT process improvements are prioritized and how approvals are attained, (b) how senior leadership is involved in decision making, (c) how security and risk are considered, (d) if and how formal process improvement methodologies are used, (e) if and how estimated and actual cost benefit analysis are conducted associated with decisions, and (f) how alignment with organizational goals is attained. The topic of IT governance was narrowed to explore the perspective of IT process owners and process managers, and their approaches and methodologies used with IT process improvement initiatives. The study found that pre-decision stages take place in IT investment decision making, and that process owners and process managers, participants other than senior leadership, and executive level decision makers are involved in these pre-decision stages and may be involved in the final decision stages.


2009 ◽  
Vol 15 (1) ◽  
pp. 39-57 ◽  
Author(s):  
CARLOS A. ULIBARRI ◽  
VICTOR C. ULIBARRI

ABSTRACTThis paper applies a household production framework (Becker, 1971) to infer the economic value of a cultural heritage site, namely, the Petroglyph National Monument, situated in Albuquerque, New Mexico, USA. The empirical analysis uses benefit-transfer techniques from three source studies: those of Bergstrom and Cordell (1991) and Boxall et al. (2003), which concern willingness-to-pay to hike and view rock art sites; and those of Rolfe and Windle (2003, 2006), which concern willingness-to-pay by Aboriginal and general populations to preserve a cultural heritage site containing rock art. The benefit-transfer analysis estimates recreational values between 3.75 million and 7 million dollars per year (depending on perceptions of the cultural attribute quality) and a nonuse value of approximately 12.5 million dollars per year. By comparison the annualized costs of developing/operating the study site are 8.5 million dollars per year. Thus a partial cost-benefit analysis suggests the study site yields net economic benefits upwards of 7.8 million dollars per year.


Sign in / Sign up

Export Citation Format

Share Document