scholarly journals Two Stage Optimization Models of the NCSRPE of Programs from the Perspective of Work

2021 ◽  
Vol 251 ◽  
pp. 01013
Author(s):  
Daisong Hu ◽  
Jingchun Feng ◽  
Wenjing Zhao ◽  
Yuwei Zhai ◽  
Song Xue

Non-commercial resources provided by employers (NCRPE) are the imperative factor affecting the progress of engineering projects. However, the NCRPE with limited supply ability is rarely considered in the schedule optimization models in previous studies from the perspective of work. This paper analyzes the characteristics of the non-commercial single resource provided by employers (NCSRPE), the optimization principle, characteristics, and tasks. With the initial network, this paper researches the optimization model of the NCSRPE to minimize the supply capacity of the NCSRPE before the implementation and to reduce the actual demand of the NCSRPE to a level slightly below the supply capacity of the production system. NCSRPE optimization and re-optimization models are built based on this, and the Hybrid Particle Swarm Algorithm (HPSA) is used to solve the problem. The results show that the two models can effectively solve the optimization problem of program planning and adjustment under multiple independent stakeholders. Finally, resource balance before the implementation and the re-optimization of resource cutting during the implementation are carried out for artificial aggregate in Program X of the South-to-North Water Diversion Project (SNWDP) based on the HPSA. A reasonable and practical program planning and adjustment within different stakeholders can be obtained.

Author(s):  
Yangwen Jia ◽  
Hong Gan ◽  
Jinjun You ◽  
Xueping Li ◽  
Cunwen Niu ◽  
...  

2013 ◽  
Vol 12 (11) ◽  
pp. 2239-2247 ◽  
Author(s):  
Guomin Li ◽  
Haizhen Xu ◽  
Ming Li ◽  
Shouquan Zhang ◽  
Yanhui Dong ◽  
...  

2012 ◽  
Vol 256-259 ◽  
pp. 2523-2527
Author(s):  
Qian Wei Wang ◽  
Rui Rui Sun ◽  
Wei Ping Guo

With regards to the characteristics of inter-basin water transfer projects, a 3d visual simulation (Three-Dimensional Visual Simulation, 3DVS) method for inter-basin water transfer project was proposed. A virtual reproduction of the entire project and its topography is achieved. The supplement of the three-dimensional topographic data was completed by Civil 3D combinedwith Google Earth. In this paper, the 3D digital model of inter-basin water transfer project is established using 3ds Max. Based on the established digital model, the simulation of channel water were realized .The Yuzhou section of South-to-North Water Transfer Project is taken as a case study. 3D visual simulation provides an effective way for the construction management and decision-making for inter-basin water diversion project.


Sign in / Sign up

Export Citation Format

Share Document