Manufactured Housing Production Process and Layout Design

Author(s):  
N. Mehrotra ◽  
M. Syal ◽  
M. Hastak
2005 ◽  
Vol 11 (1) ◽  
pp. 25-34 ◽  
Author(s):  
N. Mehrotra ◽  
M. Syal ◽  
M. Hastak

Author(s):  
Dr. Kannan, Et. al.

With rise in complexity of materials and lack of necessary skills among the mass population, it is necessary to find a system that can help the employees to identify the materials without the help of additional labour, training and manuals. Hence, a system has been created to identify the material and give similar materials when the model is provided with just an image of the material in question. This being an unlinked database helps in maintaining privacy of the company. Convolutional neural networks are used for object detection and then captioning is done by Recurrent neural network which also compares the generated caption with the provided database and return the best match. LSTM and NLP aid the process of caption generation and search. The dataset used is MSCOCO 2014. The evaluation metrics is BLEU which returned a score of 70.3%. The whole idea is easy to combine with concepts like KANBAN and facilitate the layout design of the company to a great flexibility. By reducing the time spent on training and sorting the efficiency of the firm is increased. The system created for identifying the material can be interlinked with centralised inventory management system to help track the material in the production process. The layout of the store was not optimised which resulted in delay in the production process. This can be rectified using a software like ARENA to design the store layout. With a system in place for material deduction the steps followed in stores can be reduced.


2004 ◽  
Vol 130 (5) ◽  
pp. 708-718 ◽  
Author(s):  
O. Senghore ◽  
M. Hastak ◽  
T. S. Abdelhamid ◽  
A. AbuHammad ◽  
M. G. Syal

2021 ◽  
Vol 1 (2) ◽  
Author(s):  
Ata Barbara ◽  
Atikha Sidhi Cahyana

XYZ is a company engaged in the field of transformers which produces several types of transformers. Transformer production process is made to order a production process that has a fluctuating pattern. Companies also often cannot estimate the number of transformers that will be produced to meet consumer demand. The purpose of this study is to improve plant layout with an efficient layout. One method used in this study is the Activity Relationship Chart and From To Chart methods. Activity Relationship Chart and From To Chart are methods that can help solve problems which are then explained in more detail through several stages of completion to the optimal point. This research is expected to produce a more efficient layout using the Activity Relationship Chart and From To Chart  method.


2011 ◽  
Vol 15 (3) ◽  
pp. 312-328 ◽  
Author(s):  
Nilufer Tas ◽  
Nilay Cosgun

In recent years, one of the biggest investments and projects that developed in Turkey is in permanent housing. The emergency case experienced after the 17 August 1999 Marmara Earthquake featured the permanent housing need; thus, within the meaning of Disaster Law, a large number of housings were to be built in designated residential areas in various provinces. Once a building has been designed, impediments that arise either cannot be fixed any longer or require an extra cost to be fixed. In order to create a high quality built environment, production process of constructions as a long lasting effect becomes important. This study examines how the production process of the permanent housings to be built in Turkey after 1999 Marmara Earthquake was managed considering the current legal framework. In this context, the aim is to state how permanent housings are produced and determination of the points seen as problems by the builders (contractors) and occupants through this process. The main concern is to determine the outcomes that could act as answer to problems that might arise in permanent housing production after a probable earthquake. The obtained information is thought to act as reference in the practices of meeting permanent housing need that will arise after disasters. Santrauka Nuolatinis būstas – tai viena sričių, į kurią Turkijoje pastaraisiais metais investuojama daugiausia, o projektai stambiausi. Po 1999 m. rugpjūčio 17 d. Marmuro regione įvykusiožemės drebėjimo susidariusi kritinė situacija buvo susijusi su nuolatinio būsto poreikiu. Tad tam skirtose įvairių provincijų gyvenamosiose zonose pagal stichinių nelaimių istatyme apibrėžtą prasmę reikėjo pastatyti daug būstų. Pastatą suprojektavus, atsiradusių defektų arba nebeįmanoma pataisyti, arba jiems taisyti reikia papildomų išlaidų. Norint suformuoti kokybišką užstatytą aplinką, dėl ilgalaikio poveikio svarbus tampa statybų procesas. Šiame tyrime nagrinėjama, kaip, atsižvelgiant į esamą teisinę bazę, buvo valdomas nuolatinių būstų, kuriuos Turkijoje reikėjo pastatyti po 1999 m. žemės drebėjimo Marmuro regione, statybos procesas. Siekiama nurodyti, kaip statomas nuolatinis būstas, ir nustatyti, kuriuos aspektus statytojai (rangovai) ir gyventojai šiame procese laiko problematiškais. Svarbiausia nustatyti pasekmes, kurios gali būti atsakas į problemas, galinčias kilti statant nuolatinius būstus po galimo žemės drebėjimo. Manoma, kad gauta informacija bus galima remtis siekiant patenkinti nuolatinio būsto poreikius, atsirasiančius po stichinės nelaimės.


2021 ◽  
Vol 1 (2) ◽  
Author(s):  
Hendri Setiawan ◽  
Atikha Sidhi Cahyana

Agung Mulya has experienced a decline in the production process, because there is an inefficient machine arrangement that causes delays in producing products, products with a target in a day can produce about 300 pcs of requests, can only produce about 170 pcs of requests, it is suspected that the main cause is the layout of the machine. less precise. In an effort to solve this problem, this study uses a method using Line Balancing and ARC (Activity Relation Chart) methods. This method is used for structuring the production flow so that there is a balance on all production lines so as to provide high efficiency on each production line. The balance in question is the balance of output from each stage of operation from the point of view of the production line and compiling a layout design for room facilities is used to analyze the proximity relationship using input data in the form of process flow, distance between spaces, conditions and spatial conditions From the results of this study resulted in a better re-lay out of thr production facility layout, the work station which originally had 8 workstations has decreased to 5 workstations, this is because the layout of the production flow layout can reduce the distance between work stations and the production process more efficient.


Sign in / Sign up

Export Citation Format

Share Document