Ahead of the Curve: Lake Huron and Elgin Area Water Systems Develop Their Asset Management Program

2018 ◽  
Author(s):  
Heather Edwards ◽  
Billy Haklander ◽  
Andrew Henry
Author(s):  
Padmanabha J. Prabhu ◽  
Damian A. Testa

The Steam Generator Asset Management Program (SGAMP) is a long term program designed to maximize the performance and reliability of the steam generators. The SGAMP focuses on plant specific conditions and hence is applicable to the original or the replacement steam generators. It is recommended that the utility and the vendor form a joint steam generator management team (SGMT) to develop, monitor and implement a long-term plan to address steam generator operation, maintenance and life extension goals. The SGMT will consist of representatives from operations, chemistry, maintenance and engineering functions and will be responsible for making decisions related to the steam generators. The charter of the SGMT is to develop a steam generator strategic plan that will cost-effectively manage steam generator options. The strategic plan is consistent with the Steam Generator Program Guidelines (NEI 97-06 in the United States). The strategic plan is a living document and is revised periodically to incorporate inspection results, new technology developments, lessons learned and industry experience. Cost-benefit analyses of strategies may be performed to prolong steam generator operability through steam generator performance modeling (tube degradation, fouling, etc.), diagnostic tools, regulatory strategy, condition monitoring and operational assessment strategy, and maintenance strategy. The SGMT will provide input regarding potential maintenance of the steam generators with schedule and cost impacts for each outage. It will also recommend engineering evaluations to be performed in support of program goals and will develop short- and long-term recommendations. These recommendations will address action plans, performance measures and results. Secondary side inspection and cleaning strategy should be developed (techniques and frequency) to maximize performance cost-effectively. This paper is based on Westinghouse experience gained by working with several pressurized water reactor (PWR) plant operators in the United States (US).


Water ◽  
2017 ◽  
Vol 9 (2) ◽  
pp. 68 ◽  
Author(s):  
Franz Tscheikner-Gratl ◽  
Patrick Egger ◽  
Wolfgang Rauch ◽  
Manfred Kleidorfer

The decisions taken in rehabilitation planning for the urban water networks will have a long lasting impact on the functionality and quality of future services provided by urban infrastructure. These decisions can be assisted by different approaches ranging from linear depreciation for estimating the economic value of the network over using a deterioration model to assess the probability of failure or the technical service life to sophisticated multi-criteria decision support systems. Subsequently, the aim of this paper is to compare five available multi-criteria decision-making (MCDM) methods (ELECTRE, AHP, WSM, TOPSIS, and PROMETHEE) for the application in an integrated rehabilitation management scheme for a real world case study and analyze them with respect to their suitability to be used in integrated asset management of water systems. The results of the different methods are not equal. This occurs because the chosen score scales, weights and the resulting distributions of the scores within the criteria do not have the same impact on all the methods. Independently of the method used, the decision maker must be familiar with its strengths but also weaknesses. Therefore, in some cases, it would be rational to use one of the simplest methods. However, to check for consistency and increase the reliability of the results, the application of several methods is encouraged.