Multiple-project discount rates for cost-benefit analysis in construction projects: a formal risk model for microgeneration renewable energy technologies

2012 ◽  
Vol 30 (9) ◽  
pp. 739-747 ◽  
Author(s):  
Jacopo Torriti
2019 ◽  
Vol 32 ◽  
pp. 385-389 ◽  
Author(s):  
Pavel Atănăsoae ◽  
Radu Dumitru Pentiuc ◽  
Dan Laurențiu Milici ◽  
Elena Daniela Olariu ◽  
Mihaela Poienar

2018 ◽  
Vol 33 ◽  
pp. 03073
Author(s):  
Andrey Gafurov ◽  
Oksana Skotarenko ◽  
Vladimir Plotnikov

The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.


2019 ◽  
Vol 266 ◽  
pp. 03003
Author(s):  
Siti Nur Atikah Abd Rashid ◽  
Natasha Khalil ◽  
Haryati Mohd Isa

Industrialised Building System (IBS) is known as a construction system that consists of a combination of components manufactured either on-site or off-site then positioned and assembled into structures. Among the benefits of IBS construction includes labour cost reduction, support desirable environment, maximize efficient use of resources and waste minimisation towards sustainable construction. However, Malaysian construction industry still has a low take-up rate on IBS construction. Hence, to promote the project’s viability via IBS, ideally, the benefits of IBS are more reliable to be presented in tangible (monetary) value and intangible (non-monetary) basis rather than descriptive benefits. Therefore, Cost-Benefit Analysis (CBA) can be used in order to identify the soft issue or non-direct cost and elicits more transparency in IBS projects. This paper presents the conceptual review of the fundamental theory of CBA on the measurement of cost and benefits that can be converted as a weighing impact for an IBS project. An initial conceptual model known as CBA-IBS model is proposed as an approach that a decision maker can use to find the balance between the amount of effort invested in the initial cost of IBS construction and the realised revenues This study concluded that CBA is able to highlight the viability of IBS for construction in more comprehensive criteria of monetary and non-monetary benefits. This paper is a review of previous studies on monetary and non-monetary indicators of CBA that suit with IBS project. The study is supported by existing literature, primarily in the most recent research, which supports the indicators of CBA. From the literature reviews, sets of monetary and non-monetary indicators of CBA that related to IBS is obtained. The result of this study will provide novel ideas to optimize sustainable construction and prolong sustainability in design, financial, buildability, operation, life-cycle and environmental aspects. CBA-IBS model will be introduced as a theoretical basis for decision-makers in adopting IBS for their construction projects.


2016 ◽  
Vol 145 ◽  
pp. 1169-1176 ◽  
Author(s):  
Alemu Moges Belay ◽  
Olav Torp ◽  
Carl Thodesen ◽  
James Odeck

2014 ◽  
Vol 1073-1076 ◽  
pp. 470-473
Author(s):  
Li Zhu ◽  
Wei Zhang

This paper explored cost-benefit analysis in the economic assessment of environmental impact of construction projects, proposed the objects and methods of economic evaluation of environmental impact, constructed a comprehensive evaluation indicator system. The indicator system reflected external economic characteristics of construction project environmental impact. Finally, this paper introduced the indicator algorithm, achieved the environmental impact measurement of monetization.


Sign in / Sign up

Export Citation Format

Share Document