Electricity generation from the high-speed wind of the spillway in a hydroelectric power station

Author(s):  
Muhammad Suleman Malik
1974 ◽  
Vol 8 (10) ◽  
pp. 914-916
Author(s):  
I. S. Ronzhin ◽  
A. D. Osipov ◽  
V. Kh. Gol'tsman ◽  
A. B. Yumatov

2008 ◽  
pp. 101-107
Author(s):  
Dubravka Polic ◽  
Ruzica Igic ◽  
Slobodanka Stojanovic ◽  
Dejana Lazic

Labudovo okno locality (50 m-84 m elevation) is situated in the south-eastern part of the edge of the Pannonian Plains, resting along the left bank of the Danube between 1982 km and 1078 km. The investigated locality is the result of rise of the Danube level after dam building of the hydroelectric power station Djerdap I. The vegetation comprises aquatic associations of the classes Hydrochari-Lemnetea Oberd. 1967 and Potametea Tx. et Prsg. 1942. The class Hydrochari-Lemnetea Oberd. 1967 includes the following phytocoenoses: Lemno-Spirodeletum W. Koch 1954, Salvinio-Spirodeletum polyrrhizae Slavnic 1956, Lemno minoris-Azolletum filiculoides Br.-Bl. 1952, Ceratophylletum demersi (So? 27) Hild 1956. The class Potametea Tx. et Prsg. 1942 includes the associations Myriophyllo-Potametum So? 1934, Nympaeetum albo-luteae Nowinski 1928, Trapetum natantis M?lleret G?rs 1960.


2020 ◽  
Vol 223 ◽  
pp. 03002
Author(s):  
Gachenko Andrey ◽  
Hmelnov Alexey

In this work, the authors present a technology for riverside terrain model building that has been tested on a number of scientific projects to study the littoral area of tail race of the Irkutsk Hydroelectric Power Station and the Bratsk Reservoir. This model is used for forecasting changes in the reservoir shorelines associated with wastewater in the cascade of hydroelectric power stations. The technology described in the work was approved to solve a number of practical problems and showed its effectiveness. Specialized application software was developed and terrain data from various sources were used to specify and detail the end result.


2020 ◽  
Vol 11 (7-2020) ◽  
pp. 19-32
Author(s):  
Olga E. Konovalova ◽  
◽  
Nikolai M. Kuznetsov ◽  

The article tells the story of the creation of the Nizhne-Tulomskaya hydroelectric power station (HPP). The main energy parameters of the hydroelectric power station, the layoutof the main structures of the station, and archival photos of the construction time are given. Data on the production and consumption of electricity for own needs, the cost of 1 kW·h during the great Patriotic war are shown. It is told about the reconstruction and current state of the station.


Author(s):  
Anna Glotko ◽  
Vitalii Belikov ◽  
Natalia Borisova ◽  
Ekaterina Vasil`eva ◽  
Aleksey Rumjancev

Introduction. A problem area of the Volga river between the Nizhny Novgorod hydroelectric power station and the city of Nizhny Novgorod has been surveyed, where unfavourable conditions for navigation, power generation, and safe living in the downstream are formed as a result of the landing level. The only solution to the problem is construction of a low-head hydraulic system (NNGU) that will reduce intensity of relief re-formations in the downstream of the Nizhny Novgorod hydraulic system and stop lowering of the bottom and level marks in this area. Purpose of this research is to study processes that occur upstream and downstream from the site of the facility to identify hazardous trends and develop practical solutions to minimize negative impacts; as well as a review of mathematical models conducted in this area for improving navigation conditions. Materials and methods. Materials of previous researches on this subject, pre-design engineering surveys and layout drawings of the designed hydraulic system are used. The researches have been performed with numerical methods using Stream 2D software package that is based on the two-dimensional differential equation Saint-Venant system. Options for low-flow conditions are considered, taking into account passing of the Nizhny Novgorod hydroelectric power station, as well as rare floods. Results. Plans for distribution of velocity modules and vectors are created, which show that construction of the low-pressure hydraulic system results in decrease in slopes and velocities of water in the problem area of the Volga-Kama cascade, as a result of which intensity of bottom deformations decreases. Rare flow passage demonstrated that difference in pools is insignificant, while, at the same time, flow of water along the left-bank floodplain passes more than believed before. Calculations of low-flow conditions demonstrated a number of deficiencies in the design, which are associated with insufficient throughput and uneven distribution of flow rates in the discharge area of the waterfront. Conclusion The results demonstrated a practical importance of using mathematical simulation with numerical methods in a two-dimensional formulation, which allow us to consider processes in more detailed manner and change the hydraulic system design in a timely manner.


Oz ◽  
2012 ◽  
Vol 34 (1) ◽  
Author(s):  
Michael Becker ◽  
Franz G. Schröck ◽  
Bernhard Kast

Sign in / Sign up

Export Citation Format

Share Document