Application of knowledge discovery in database (KDD) techniques in cost overrun of construction projects

Author(s):  
Mai Monir Ghazal ◽  
Ahmed Hammad
2020 ◽  
Vol 38 (7A) ◽  
pp. 1069-1076
Author(s):  
Layth T. Ali ◽  
Raid S. Abid Ali ◽  
Zeyad S. M. Khaled

Cost overrun in construction projects is a common phenomenon in Iraq. This might occur due to diversity of factors. This study aims to identify the factors influencing construction projects cost that are potentially controllable by main contractors. A field study through a questionnaire survey was directed to a sample of related Iraqi professional engineers from general contracting companies at both public and private sectors. Their opinions on the impact and frequency of each factor were investigated. The questionnaire offered (59) factors classified in (8) categories namely; legislations, financial and economic, design, contractual, site management, material, labor and equipment. The factors were ranked according to the highest Relative Importance Index (RII). The study revealed (10) major factors that are potentially controllable by main contractors namely; labor productivity, sub-contractors and suppliers performance, equipment productivity, site organization and distribution of equipment, experience and training of project managers, scheduling and control techniques, planning for materials supply, planning for equipment supply, materials delivery and planning for skilled labor recruitment. Recommendations to aid contractors and owners in early identification of these factors are also included in this study.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2013 ◽  
Vol 4 (1) ◽  
pp. 18-27
Author(s):  
Ira Melissa ◽  
Raymond S. Oetama

Data mining adalah analisis atau pengamatan terhadap kumpulan data yang besar dengan tujuan untuk menemukan hubungan tak terduga dan untuk meringkas data dengan cara yang lebih mudah dimengerti dan bermanfaat bagi pemilik data. Data mining merupakan proses inti dalam Knowledge Discovery in Database (KDD). Metode data mining digunakan untuk menganalisis data pembayaran kredit peminjam pembayaran kredit. Berdasarkan pola pembayaran kredit peminjam yang dihasilkan, dapat dilihat parameter-parameter kredit yang memiliki keterkaitan dan paling berpengaruh terhadap pembayaran angsuran kredit. Kata kunci—data mining, outlier, multikolonieritas, Anova


2015 ◽  
Vol 4 (2) ◽  
pp. 288 ◽  
Author(s):  
Nabil Al-Hazim ◽  
Zaydoun Abusalem

This study aims to identify the most important factors that cause delay in road construction projects in Jordan, which results in cost and time overrun allocated for this type of engineering projects and cause critical problems for both the developer and the contractor. The gap between the cost at completion and that originally estimated, known as cost overrun, can be regarded as one of the most important parameters reflecting the success of projects. In the public sector, money spent on project change orders results in increased construction time which in return reduces the number and size of the projects that can be completed during any given fiscal year. To achieve this goal, the documents and the final reports for several sample projects implemented over the years 2000 to 2008 were analyzed. All the projects were administered by the same organization taken from Jordan Ministry of Rural and Public Works. The results of this study can assist highway officials in their design, planning, scheduling and projects completions so that necessary actions can be taken to control these overruns in future projects. The study showed that 19 factors might cause delays of road construction projects as defined through a detailed literature review. The analysis of the study indicated that the top causes affecting time and cost overrun in road construction projects in Jordan are Terrain and Weather conditions.


2009 ◽  
Vol 12 (1) ◽  
pp. 104-117
Author(s):  
Tam Thi Minh Nguyen ◽  
Thi Hao Cao

Construction industry is considered to be one of the most important industries in Vietnam's economy. But many construction industry sectors have been experienced chronic problem as cost overrun. Therefore, a conceptual model of factors influencing construction cost was developed to determine the key factors that cause difference between budget cost and actual cost and some solutions are recommended to be applied to achieve the best outcome of cost. The result of analyzing 216 construction projects completed from 2002 to 2007 by companies located in Ho Chi Minh City indicated 6 main factors varying construction cost: project planners, project executives, economics, political, natural environment, fraudulent and lost. The results of multiple linear regression model confirmed the relationship between these above 6 factors and construction cost with the theories are supported at the statistically significant level of 0.05.


In the Indian scenario construction industry facing a major problem is cost and time overrun. Effective time performance and cost performance are very important to execute the project in a successful manner by keeping them within the prescribed schedule and cost. Overall cost and duration of construction projects affected by the effective resource selection factor. This paper's objective is to rectify the improper selection of resources by a programming tool. Field survey and codebook study did collect the needed data to feed in the programming tool. The prepared tool gets distributed and making to access by every stakeholder of construction projects. This may result in the selection of construction resources as effectively. The term cost overrun in the resource part will be reduced.


2018 ◽  
Vol 192 ◽  
pp. 02021
Author(s):  
Pittayaporn Gomarn ◽  
Jakrapong Pongpeng

This research aims to compare the rank and importance level of failure indicators of the construction projects from the perception of Thai and Malaysian engineers. The questionnaire was used to survey the opinions of the engineers who supervised construction projects in Bangkok, Thailand and Kuala Lumpur, Malaysia. Analysis of the data was undertaken with the use of SPSS software which included a comparison of the importance level of construction project failure indicators from the perception of Thai and Malaysian engineers. Additionally, the Mann Whitney U test was used to compare the similarities and differences of construction project failure indicators from the perceptions of both Thai and Malaysian engineers. The results showed that construction project failure indicators from both Thai and Malaysian engineers were similar. Failure indicators ranked in importance were: 1) negative effects on safety, health and environment (18.83%), 2) cost overrun (18.44%), 3) time overruns (17.41%), 4) quality defects (16.43%), 5) stakeholders' dissatisfaction (15.36%), and 6) dispute and litigation (13.54%). The outcome of the research is therefore useful in assisting supervisory staff better understand project failure indicators. In addition, the research can be used as a guideline for analyzing the risk of failures in construction projects.


Sadhana ◽  
2016 ◽  
Vol 41 (6) ◽  
pp. 679-693 ◽  
Author(s):  
Swapnil P Wanjari ◽  
Gaurav Dobariya