scholarly journals Construction Control Method and Application of Hydropower Project Based on Permanent and Temporary Monitoring

Author(s):  
Daipeng Zhao ◽  
Qinghua Zhan ◽  
Hua Li ◽  
Hongyue Pan
2012 ◽  
Vol 170-173 ◽  
pp. 3190-3193
Author(s):  
Lian Yu Wei ◽  
Zhi Ming Zhang

Through large amount analysis of construction site investigation and data, we summed up several constructions control technologies and methods easier to achieve in projects for the aspect of the super-size filling embankment construction control technology.


2010 ◽  
Vol 163-167 ◽  
pp. 2502-2506
Author(s):  
Fang Wen Wu ◽  
Cheng Feng Xue

Based on the grey system theory, and combined with the construction features of cable-stayed bridges and construction control method, the paper takes the cable-stayed bridge under construction as the interferential grey technology system with physical prototype and analyzes the random process as grey process in line with grey system theory. The grey model is established by the initialize heights of main girder and cables’ tension as two control inputs of system during the construction of the cable-stayed bridge. Through the feedback information and rectifying the grey model, the initialize heights of main girder and the cable force of next construction stage are predicted in order to control the bridge configuration and cable tension successfully.


2013 ◽  
Vol 655-657 ◽  
pp. 1893-1896
Author(s):  
Jun Jiang ◽  
Hong Ye Gou ◽  
Jun Ming Wang

Xiaolan channel super large bridge is a stucture type adopted in the passenger dedicated railway line for the first time, and the longest span bridge of the passenger dedicated railway line, also the longest span bridge of the high-speed railway in the world with a total length of 7686.57m.. At first, the author compiles APDL command flow program by using the unit birth-death technique, establishes simulation calculation model in the construction process. The creep characteristics of concrete are also taken into account. The whole process of beam first-to-arch later stage construction are calculated and studied. Simulation Calculation and construction control research of Xiaolan channel super large bridge shows that construction control method is reasonable, the calculation program which is used in the paper is right, and using three dimensional substantiality finite element method and “element birth and death” to simulate construction process conform to reality. The bridge is safe in the construction of beam first and arch late.


2014 ◽  
Vol 587-589 ◽  
pp. 1412-1415 ◽  
Author(s):  
Yuan Liao ◽  
Jian Hui Zhan ◽  
Chen Li

The paper describes the basic principles of stress-free status control method and application in construction control of various phased construction bridge.Through a series of engineering example calculation and analysis shows that: the method can solve all kinds of problems in bridge construction control calculation directly and efficiently, its application and promotion can promote the whole bridge construction control level of progress.


2012 ◽  
Vol 446-449 ◽  
pp. 274-277
Author(s):  
Qing Du ◽  
You Zhong Zhang ◽  
Chang Bai Song

Construction monitoring is a system, especially for long-span pre-stressed concrete continuous rigid frame bridge. Based on the construction control of the right bridge Ju-ma River NO.3 Bridge, this paper has made comprehensive conclusion and detailed discussion in the aspects of construction control method, the basic process of construction control, and bridge construction control survey methods. The findings described herein will provide considerable reference for the construction control of other similar long-span bridges.


2020 ◽  
Vol 29 (03) ◽  
pp. 293-305
Author(s):  
Xuansheng Cheng ◽  
Bingbing Luo ◽  
Haibo Liu ◽  
Qingchun Xia ◽  
Chaobo Chen