scholarly journals Electricity metering in power supply systems with grid-connected solar power plants

2021 ◽  
Vol 723 (5) ◽  
pp. 052012
Author(s):  
O V Leshtayev ◽  
N A Stushkina ◽  
V I Zaginaylov
Author(s):  
Petro Lezhnyuk ◽  
Iryna Hunko ◽  
Juliya Malogulko ◽  
Iryna Kotylko ◽  
Lіudmyla Krot

Urgency of the research. Current trends of distributed generation development in Ukraine indicate a rapid generation in-crease from renewable energy plants. Most developed countries gradually refuse from the fossil fuels use and invest more and more to the “green” energy. Therefore, there is a need for a detailed study of the operation conditions of distributed energy sources due to their instability, as well as the processes that arise in distribution electric networks with diverse types of distributed energy sources. Target setting. In the producing process of power energy by distributed energy sources due to the increase in their num-ber, there are situations where several renewable sources of energy operate to only one system of buses. Thus, such distributive networks acquire the features of a local power system, which complicates the control process of such systems, and also there is a problem with the electricity supply of consumers. Actual scientific researches and issues analysis. The analysis of publications suggests that in literature more attention is paid to studying the operating modes of solar power plants, or small hydroelectric power plants. However, almost no attention was paid to the study of their cooperation work. Uninvestigated parts of general matters defining. Only a few works are devoted to the study of the cooperation of the diverce sources of distributed energy sources in the local electrical systems. That is why, their impact on power distribution networks and on the grid in general has not been studied extensively. The research objective. In this article was considered the influence of asynchronous generators on small hydroelectric power plants on the operation modes of distribution electrical networks, and were investigated the processes that are occurring in local power systems with different types of distributed energy sources. The statement of basic materials. Based on the research results, was developed a computer model of a such system in the PS CAD software environment. Two solar stations and one small hydroelectric power station with an asynchronous generator were connected to the power supply. It was shown the simulation of two modes of operation: a joint operation of a small hydroelectric power station, two solar power stations and a power supply center; a joint operation of a small hydroelectric pow-er plant, two solar power stations and a power supply disconnected. Conclusions. As a result of computer simulation, it is shown that by switching on a small hydroelectric power plant with an asynchronous generator in the case of an emergency shutdown of centralized power supply, it is possible to restore the work of solar power plants, and thus partially or completely restore the power supply of consumers.


TERANG ◽  
2020 ◽  
Vol 3 (1) ◽  
pp. 100-105
Author(s):  
Septianissa Azzahra ◽  
Samsurizal Samsurizal ◽  
Christiono Christiono ◽  
Miftahul Fikri

Renewable energy, especially solar power plants (PLTS), is now begin to develop their applications to many forms, such as: installed as a home power supply, power supply for buildings, and also as power supply for street lighting (solar street light). Madrasah Aliyah Al-Khairiyah Rancranji In this regard, as a partner, demand a socialization and a study for their students to understand more about renewable energy topics especially about solar energy. And the limited electric power is also one of the problems for this school. Therefore, PKM activity in Madrasah Aliyah Al-Khairiyah Rancaranji is a solution given by the PKM team by providing learning and an introduction of renewable energy as well as workshop and installation of PLTS and road lamps based on solar cell. Results gained after the implementation of this activity are students understand and knows about the renewable energy, its application and its benefits in daily life.


Forests ◽  
2021 ◽  
Vol 12 (3) ◽  
pp. 361
Author(s):  
Shizu Itaka

Technology related to solar power as a renewable energy resource has increased in recent years. However, in Japan, forestland has been converted into mega-solar power plants with more than 1 MW photovoltaic capacity and such conversions raise significant concerns as they degrade forest ecosystem services. In this study, the profit and power supplies generated by a mega-solar power plant and a cedar (Cryptomeria japonica) plantation were evaluated. The profit for the cedar plantation was estimated from saw log and wood chip production, and its power supply was estimated from wood chip production alone. These figures were based on an optimal forest management strategy that was generated using a dynamic programming model. In this numerical simulation, it was found that the power supply from the mega-solar power plant was 50–150 times more than that from the cedar plantation. Regarding profit, it was found that the simulated mega-solar power plant provided NPV (net present value) of 8.5–90.6 MM JPY (Japanese Yen)/1–3 ha (0.1–3.0 MM JPY/ha/year), while the forest management simulation generated an NPV of 29,863 JPY/ha/year (for one timber rotation) and SEV (soil expectation value) of 3.6 MM JPY/ha at most. To avoid the conversion of forests into mega-solar power plants, this difference provides a basis for the cost of maintaining forests for ecosystem services and potential economic incentives.


2021 ◽  
Vol 1125 (1) ◽  
pp. 012074
Author(s):  
J Koko ◽  
A Riza ◽  
U K Mohamad Khadik

Sign in / Sign up

Export Citation Format

Share Document