scholarly journals Application of prefabricated building in emergency rescue project construction Taking — Wuhan Huoshenshan Hospital Project as an example

2021 ◽  
Vol 742 (1) ◽  
pp. 012005
Author(s):  
Cong Peng
2014 ◽  
Vol 62 (S 01) ◽  
Author(s):  
Y. Yildirim ◽  
S. Pecha ◽  
Y. Alassar ◽  
S. Hakmi ◽  
T. Deuse ◽  
...  

Author(s):  
Evgenii Burnashov ◽  
Evgenii Burnashov ◽  
Konstantin Makarov ◽  
Konstantin Makarov ◽  
Boris Chubarenko ◽  
...  

Information-Prediction Automatic System (IPAS) was developed for the Baltic Sea shore within the Kaliningrad District in 2005-2006 years and implemented in the State Organization of the Kaliningrad District "Baltberegozaschita" (coastal management authority) in 2007. It is used as database for shore protection engineering and a tool for analyses and forecasting of coastal processes, and has three blocks - database, forecast block and information-cartographic block. Information-cartographic block regularly accumulates the results of annual monitoring - surveys on shore segments with returning period of 6-7 years using reference system of permanent monitoring bench marks each 500 meters on the Vistula Spit, shore of Sambiya Peninsula and the Curonian Spit. IPAS is regularly used for processing and analysis of data, preparation of analytical notes for the Government of Kaliningrad Oblast and for municipal authorities. Information stored in IPAS was used for development of two programs of actions: "Protection of the shore of the Baltic Sea, the Vistula and Curonian lagoons within the Kaliningrad Oblast for the period 2014-2020 years" and "The concept of integrated development of shore protection in the Kaliningrad Oblast for the period 2013-2020 years". Optimal engineering solutions were recommended by using of the forecast block of IPAS for promenade protection constructions in Zelenogradsk and Svetlogorsk as well as for the project "Construction of beach protection in Svetlogorsk".


2017 ◽  
Vol 8 (1) ◽  
pp. 43-47
Author(s):  
Sufa'atin Sufa'atin

One of the obstacles in project construction is that the project is experiencing delays. The delay is influenced by several factors including the absence of risk recording, the unavoidability of the opportunities and the impact of risks that arise in the project and its handling, and the neglected risks that may disrupt the project. Project risk is the cumulative effect of an uncertain event opportunity, which affects the project objectives. Several methods can be used to handle the occurrence of project risk, one of the methods used to perform a risk assessment is the Probability Impact Matrix (PIM). PIM is a method that can be used to analyze risk qualitatively based on probability and its impact. By using the PIM method, some of the opportunities and impacts of risks that may arise in the project can be identified. In addition, the PIM method can minimize the risks that arise in the project and quickly resolve the risks. Index Terms— Project, Risk, PIM, Possibility, Impact


2020 ◽  
pp. 127-129
Author(s):  
Ž. P. Cuckič

At the end of a decade-long research work at the Moravamont plant in Gnjilane, a new completely prefabricated building system was created from reinforced concrete and prestressed precast elements on the track, which was called Moravamont 2000. Presented in paper final results demonstrates that the construction is well and rationally designed, that the construction behaviour for the maximum expected earthquake effects with a return period of 500 years, according to the criterion of regulation, is resistant and resistant to an earthquake without major damage.


Sign in / Sign up

Export Citation Format

Share Document