scholarly journals Research on the correction method of the boundary water level of the mountainsides in seepage analysis

2021 ◽  
Vol 861 (3) ◽  
pp. 032063
Author(s):  
Jingfa Cai ◽  
Zengguang Xu ◽  
Junrui Chai ◽  
Cheng Cao
Water ◽  
2021 ◽  
Vol 13 (4) ◽  
pp. 502
Author(s):  
Jinman Kim ◽  
Heuisoo Han ◽  
Yoonhwa Jin

This paper shows the results of a field appliance study of the hydraulic well method to prevent embankment piping, which is proposed by the Japanese Matsuyama River National Highway Office. The large-scale embankment experiment and seepage analysis were conducted to examine the hydraulic well. The experimental procedure is focused on the pore water pressure. The water levels of the hydraulic well were compared with pore water pressure data, which were used to look over the seepage variations. Two different types of large-scale experiments were conducted according to the installation points of hydraulic wells. The seepage velocity results by the experiment were almost similar to those of the analyses. Further, the pore water pressure oriented from the water level variations in the hydraulic well showed similar patterns between the experiment and numerical analysis; however, deeper from the surface, the larger pore water pressure of the numerical analysis was calculated compared to the experimental values. In addition, the piping effect according to the water level and location of the hydraulic well was quantitatively examined for an embankment having a piping guide part. As a result of applying the hydraulic well to the point where piping occurred, the hydraulic well with a 1.0 m water level reduced the seepage velocity by up to 86%. This is because the difference in the water level between the riverside and the protected side is reduced, and it resulted in reducing the seepage pressure. As a result of the theoretical and numerical hydraulic gradient analysis according to the change in the water level of the hydraulic well, the hydraulic gradient decreased linearly according to the water level of the hydraulic well. From the results according to the location of the hydraulic well, installation of it at the point where piping occurred was found to be the most effective. A hydraulic well is a good device for preventing the piping of an embankment if it is installed at the piping point and the proper water level of the hydraulic well is applied.


Author(s):  
Seyed Habib Mousavi Jahromi ◽  
Mansour Pakmanesh ◽  
Amir Khosrojerdi ◽  
Hossein Hassanpour Darvishi ◽  
Hossein Babazadeh

The rapid ‎drawdown of the dam reservoir is one of the most common situations occurring in the lifetime of a dam. For this reason, one of the main factors in the design of the upstream slope is the rapid drainage of the reservoir. In this case, the upstream slope is in a critical condition and the slope may be unstable. When the water surface in the reservoir is drawdown suddenly, the water level in the dam body does not decrease at the same time as the reservoir water level. The analysis of seepage from the earth dam body and calculation of the water loss play an important role in calculating the amount of pore water pressure, and, consequently, the stability analysis of the dam body. In addition, any seepage analysis is dependent on the hydraulic properties of the dam materials. In order to investigate the effect of hydraulic conductivity on the rapid drawdown of water level and the seepage, an experimental model was constructed of an earth dam. By accurate measurement of hydraulic parameters of the materials in saturated and unsaturated media, the flow through this model was modeled using a disk penetrometer by seep/w software. The results were then compared with the observed data.


2011 ◽  
Vol 90-93 ◽  
pp. 734-737 ◽  
Author(s):  
Qiang Feng ◽  
Shi Rong Xiao

Saturated and unsaturated seepage analysises are given for the neonatal landslide——Qianjiangping Landslide applied Three Gorges Reservoir water level and rainfall which happened after the first sluice in Three Gorges Reservoir, the conclusions are discussed from the two aspects: Three Gorges Reservoir sluice and heavy rainfall.


Water ◽  
2019 ◽  
Vol 11 (1) ◽  
pp. 124 ◽  
Author(s):  
Ang Gao ◽  
Shiqiang Wu ◽  
Fangfang Wang ◽  
Xiufeng Wu ◽  
Peng Xu ◽  
...  

Field measurement of water level is important for water conservancy project operation and hydrological forecasting. In this study, we proposed a new measuring technique by integrating the advantages of unmanned aerial vehicle (UAV) photogrammetry and image recognition technology. Firstly, the imagery of water fluctuation process was captured by an UAV airborne camera, and water surface line in the imagery was recognized and extracted using image recognition technology. Subsequently, successive water levels at a measuring section were calculated by parameter calibration. Statistical parameters of water levels, such as maximum, average, and minimum values during the capturing period were also calculated. Additionally, we introduced a correction method to offset the error caused by UAV drift. The newly proposed method was tested in field measurement for Miaowei hydropower station, China, and the results showed that the method is reliable and adoptable.


2007 ◽  
Vol 340-341 ◽  
pp. 1327-1332 ◽  
Author(s):  
Bo Han ◽  
Hong Jian Liao ◽  
Kyoji Sassa ◽  
Fa Wu Wang

This paper is mainly concerned with the saturated-unsaturated seepage analysis of embankment dams based on unsaturated soil theory and the reliability analysis of embankment dam based on conception of reliability. The transient seepage due to change of the water level is calculated using the finite element method based on unifying saturated-unsaturated seepage governing equations. The transient pore water pressures are then used for stability analyses of embankment dam considering the effects of suction on shear strength of unsaturated soils. Meanwhile, combined with reliability computation, the Monte-Carlo stimulation method is used to calculate the corresponding reliability index dealing with the stochastic features of soil parameters. The reliability of different water level condition of embankment dams has been analyzed. The effects of different reservoir water level drawdown and raise speeds on reliability of embankment dam are discussed.


Sign in / Sign up

Export Citation Format

Share Document