Experimental study of railway bridge scouring and proposal of remedial measures-A case study of bridge number 30, Harrow River.
2020 ◽
Vol 899
◽
pp. 012015
Keyword(s):
2017 ◽
Vol 27
(4)
◽
pp. 563-568
◽
1973 ◽
Vol 11
(2)
◽
pp. 211-225
◽
Keyword(s):
2009 ◽
pp. 595-602
Keyword(s):
2005 ◽
Vol 70
(593)
◽
pp. 109-116
◽
2020 ◽
Vol 10
(1)
◽
pp. 1-12
Keyword(s):
2020 ◽
Vol 10
(7)
◽
pp. 3007-3023