Site planning and design of green residential building projects: case studies in China

2019 ◽  
Vol 27 (2) ◽  
pp. 525-543
Author(s):  
Xiaosen Huo ◽  
Ann Tit Wan Yu ◽  
Wu Zezhou ◽  
Wadu Mesthrige Jayantha

Purpose The purpose of this paper is to present site planning and design (SPD) relevant variables and items in practice for practitioners to better understand and implement SPD in green building projects. Design/methodology/approach The research methods include questionnaire survey and case studies in the context of China. A questionnaire survey was adopted to identify the importance of 13 variables and the corresponding 38 items in SPD of green residential buildings. Three green residential projects including one in Hong Kong and two in Mainland China were selected to investigate the SPD considerations in practice and to discuss the necessary improvement. Findings The results show that 12 out of the 13 variables of SPD in green buildings are involved in the three case projects to some extent, thereby underscore the importance of these variables. The potential improvement in real-life SPD of green buildings is also discussed such as adopting design-build and integrated project delivery methods and preserving and protecting cultural characteristics on site. Originality/value The research findings may serve as a reference for practitioners to better conduct SPD in green building projects.

2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Xiaojing Zhao ◽  
Wei Pan

PurposeThe wide uptake of green building is hindered by factors such as limited market demand and high up-front cost despite substantial policy incentives. Successful business models (BMs) help facilitate the diffusion of sustainable innovation and have attracted increasing attention. However, little attention has been paid to examining the adoption of green building from the perspective of BM. This paper aims to identify the characteristics of BM that companies adopted to deliver green building projects and examine the evolution path of BM for green buildings.Design/methodology/approachA total of 744 interdisciplinary bibliographic records related to BM and green buildings from the Web of Science Core Collection database have been identified from the Web of Science Core Collection and analyzed through co-author analysis, co-word analysis and co-citation analysis.FindingsBM research mainly focuses on five subjects, namely, environmental science, engineering, business, economics, science and technology. Keywords “strategy”, “capability”, “perspective” and “design” receive the highest centrality index, which suggests that the strategy design and corporate capability are indispensable elements when designing or innovating a company's BM. “BM canvas” and “resource based view” received the burst citations in the recent decade. Twelve research clusters are identified, including performance evaluation, waste management, energy efficiency, BM, project business, professional capital, leadership and product innovation. These topics highlight three evolution direction for green building projects, i.e. life cycle-oriented value proposition, collaborative value delivery and innovative cost and revenue structure.Originality/valueThe findings contribute to a systematic understanding of the underlying mechanisms of BM for green buildings and illuminate the development trend of business strategies for sustainability.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
B.A.K.S. Perera ◽  
Kaveesha Gihani Dewagoda

Purpose Delayed payments have been long standing, pressing issue in construction projects, especially in Government-funded construction projects. The root causes and the consequences of delayed payments must be identified before implementing strategies to mitigate the consequences of such delayed payments. However, these causes and consequences and the parties responsible for managing the delayed payments have not been identified so far. Therefore, the purpose of this study is to investigate the management of payment delays in Government-funded construction projects. Design/methodology/approach The study used a mixed approach comprising four case studies and a questionnaire survey. The empirical data collected from the case studies and the questionnaire survey were analysed using manual content analysis and mean rating, respectively. Findings The study identified the most significant causes and the most significant consequences of delayed payments that occur in Government-funded construction projects. It also revealed the strategies that clients, consultants, contractors and other parties can adopt to mitigate the adverse consequences of such delayed payments. Originality/value This study identified the most significant causes of delayed payments in Government-funded construction projects, the most significant consequences of such delayed payments and the most suitable strategies the clients, consultants and contractors can adopt to mitigate the consequences of such delayed payments. Thus, this study supports streamlining the management of payment delays in Government construction projects and identifies the roles that different parties must play in managing payment delays in Government building projects, which is an under-researched area.


2016 ◽  
Vol 34 (4/5) ◽  
pp. 379-406 ◽  
Author(s):  
Michael Y.L. Chew ◽  
Sheila Conejos

Purpose The use of green wall technology in green buildings is a growing trend; however, more research is required about their maintainability, taking into account that maintainability at the design stage is a valuable strategy in achieving building efficiency and sustainability. Thus, the purpose of this paper is to determine the issues in operating and maintaining green walls, particularly in tropical areas like Singapore, leading to the development of a green maintainability framework. Design/methodology/approach This research uses a qualitative method that combines a thorough and systematic literature review, multiple case studies, field observation surveys and selected instrumental case studies with building plan appraisal and interviews to investigate the potential issues associated with the maintainability of green walls in tropical areas like Singapore. Findings The findings show that technical and environmental issues/defects are prevalent in the operation and maintainability of green wall technologies applied in green buildings located in tropical regions. Proper considerations of these findings will encourage green building designers and facilities managers to collaborate in the effective implementation of operations and maintenance of green building technologies. Originality/value This research gives new and significant information while identifying a clear knowledge gap. The paper recommends the formulation of a green maintainability framework with a set of design criteria that will serve as a benchmark in the future design of green walls. The green maintainability framework would be a valuable addition to green facilities management in ensuring the long-term maintainability and sustainability of existing and new green walls in tropical areas specifically in Singapore.


2017 ◽  
Vol 35 (2) ◽  
pp. 181-201 ◽  
Author(s):  
Shazmin Shareena Ab. Azis ◽  
Ibrahim Sipan ◽  
Maimunah Sapri ◽  
Rohaya Abdul Jalil ◽  
Izran Sarrazin Mohammad

Purpose The purpose of this paper is to identify green envelope building components of residential buildings applicable under hot and humid climates and to analyze the effect of these components on building value. Design/methodology/approach The authors place an emphasis on green envelope components that influence building value and which are derived based on their integration into a building envelope structure that is applicable under hot and humid climates. This is performed through identification of green benefits of each green envelope component based on literature reviews and in relation to green criteria listed by the Malaysia Green Building Index (GBI). Consequently, a quantitative analysis has been conducted to determine the effect of these green envelope components on building value by means of a questionnaire distribution among 550 property valuation practitioners in Malaysia. However, in order to certify respondents’ credibility, the authors analyzed questionnaires answered by property valuation practitioners with experience in green valuation. Findings The findings show that there are ten green envelope components currently certified under GBI Malaysia and applicable for hot and humid climates. There are three green envelope components that can increase property values, specifically: solar photovoltaic, green living wall and green roof. However, eight of the green envelope components have no effect on building value. Research limitations/implications Due to the relative immaturity of the green building market in Malaysia, the authors were unable to analyze the actual percentage of increment on building value as conveyed by each green envelope component. Originality/value This paper aims to provide understanding of the effect of individual green envelope components on building value rather than merely the value of green buildings in general. It proves that green building envelope components do in fact contribute to an increase in green building values. As the green building market in Malaysia is still in its infancy, this study is significant in that it prepares the Malaysian green building market to attain a new level by providing valuation practitioners with awareness of green building values and new knowledge concerning the effect of individual green components on building values. Hence, it is anticipated that this study can assist property valuation practitioners in conducting valuations of green buildings in the future.


2018 ◽  
Vol 25 (4) ◽  
pp. 940-950
Author(s):  
Thomas Ren

Purpose The purpose of this paper is to examine whether there is a meaningful difference, viewed from a financial perspective, in distinguishing between organised crime and terrorist organisations, with regard to the control and mitigation of the threats that they pose to society. Design/methodology/approach The paper uses conceptual models obtained from enterprise theory and economics, as well as criminology, and makes use of case studies through the application of these models. Findings The paper finds that when viewed from a financial perspective, there is no meaningful difference in distinguishing between the groups because many have undergone processes of convergence and transformation, such that they assume each other’s operational and motivational characteristics. However, the answer also depends on how precisely one defines each type of illicit group as well as the transitions they undergo. Originality/value The value of this paper is that it applies two separate models on interactions between organised crime and terrorist organisations, the terror–crime continuum and interaction spectrum, to real life situations. After assessing their validity for more recent examples of such illicit groups, it then provides a balanced argument as to distinguishing between organised crime and terrorism. One limitation towards the paper’s originality, however, is that it draws mainly from pre-existing literature.


2017 ◽  
Vol 6 (3) ◽  
pp. 86-100 ◽  
Author(s):  
Sana Azeem ◽  
Malik Asghar Naeem ◽  
Abdul Waheed ◽  
Muhammad Jamaluddin Thaheem

Purpose The purpose of this paper is to investigate the barriers inhibiting the adoption of green building and measures to promote this approach in Pakistan. Design/methodology/approach Barriers and measures were identified and examined by using a combination of research methods, including literature review, questionnaire survey, and in-depth interviews with the construction industry-related practitioners working in Pakistan. Ranking technique and factor analysis were used to identify the significant issues associated with the adoption of green building practices. Findings As per the survey results, the most critical barrier is “lack of awareness among people about the importance and advantages of adopting green building practices,” followed by “lack of incentives from government” and “lack of green building codes and regulations,” respectively. The results also indicate that most important measure to promote the adoption of green buildings is “creation of public awareness toward green initiatives through seminars, workshops, and discussions,” followed by “availability of green building codes and regulations (mandatory to apply)” and “financial incentives and penalties by the government (e.g. soft loan, tax) for promoting green building practices,” respectively. Research limitations/implications Research limitation is that its findings, other than Pakistan, cannot be generalized to other developing countries. Practical implications Findings of the research will be helpful in sensitizing the regulatory agencies, the policy makers, and the building construction practitioners about the barriers to adoption of green building practices. The suggested measures will help in devising policies and economic measures to promote the construction of green and environment-friendly buildings. Social implications This research will help the common people to know about the importance of green buildings that may lead to a deviation from the practice of traditional buildings to a widespread trend of building green buildings. This will lead to drastic reduction in demand for energy and considerable monetary savings for the common people. Originality/value The findings of this study are expected to contribute valuable information to decision makers for the better understanding of key issues that call for more attention in the promotion of efforts of green building practices in Pakistan. The results are based on the perception of local stakeholders, but might also be helpful for policy makers in other countries.


2015 ◽  
Vol 5 (2) ◽  
pp. 170-183 ◽  
Author(s):  
Sepani Senaratne ◽  
Prasanna Rajitha Hewamanage

Purpose – Leadership of the project team is vital for green building projects in achieving LEED certification. Literature findings confirm the need for managing green building projects differently from ordinary projects. The team leader should be able to work with the project team to manage the general project activities while following the LEED certification procedure to finally achieve LEED certification. The paper aims to discuss these issues. Design/methodology/approach – This paper presents a research project which was aimed to explore the role of team leadership in achieving LEED certification in a green building project through a case study research approach. Findings – The research findings revealed the importance of utilizing the appropriate leadership roles of project team members in addition to the project leader’s role to achieve LEED certification for green building projects successfully. The research proposed four team leadership processes required to meet the LEED challenges; namely, proactive planning and visualization; collective implementation; teamwork for win-win; and, continuous learning and knowledge sharing. Originality/value – Based on these findings, the research suggests a new project team environment enabled by effective team leadership to meet the LEED challenges. It is argued that the team leadership role of every team member is unique and best suited when used synergistically to achieve LEED certification for the project. The research is original in applying team leadership concepts to green building projects in a real-life setting.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Kofi Agyekum ◽  
Chris Goodier ◽  
James Anthony Oppon

PurposeThe majority of the literature on green buildings in Ghana focuses on environmental benefits, innovative designs, construction technologies and project management techniques. However, little is known about how such facilities are financed. This issue creates potential knowledge gaps, one of which this study aims to address. This study examines the key drivers for green building project financing in Ghana.Design/methodology/approachThe study uses an explanatory sequential design with an initial quantitative instrument phase, followed by a qualitative data collection phase. An extensive critical comparative review of the literature resulted in the identification of eight potential drivers. One hundred and twenty-seven questionnaire responses based upon these drivers from the Ghanaian construction industry were received. Data were coded with SPSS v22, analysed descriptively (mean, standard deviation and standard error) and via inferential analysis (One Way ANOVA and One-Sample t-Test). These data were then validated through semi-structured interviews with ten industry professionals within the Ghana Green Building Council. Data obtained from the semi-structured validation interviews were analysed through the side-by-side comparison of the qualitative data with the quantitative data.FindingsThough all eight drivers are important, the five key drivers for the Ghanian construction industry were identified as, in order of importance, “high return on investment”, “emerging business opportunity”, “ethical investment”, “conservation of resources” and “mandatory regulations, standards, and policies”. The interviewees agreed to and confirmed the importance of these identified drivers for green building project financing from validating the survey's key findings.Research limitations/implicationsKey limitations of this study are the restrictions regarding the geographical location of the collected data (i.e. Kumasi and Accra); timing of the study and sample size (i.e. the COVID-19 pandemic making it difficult to obtain adequate data).Practical implicationsThough this study was conducted in Ghana, its implications could be useful to researchers, policymakers, stakeholders and practitioners in wider sub-Saharan Africa. For instance, financial institutions can invest in green buildings to expand their green construction and mortgage finance products to build higher value and lower risk portfolios. The findings from this study can provide investors with the enhanced certainty needed to help guide and inform their investment decisions, i.e. what to invest in, and when, by how much and how a scheme being “green” may influence their rate of return. Also, for building developers, it will give them a clearer understanding of the business case for green buildings and how to differentiate themselves in the market to grow their businesses.Originality/valueThis study's findings provide insights into an under-investigated topic in Ghana and offer new and additional information and insights to the current state-of-the-art on the factors that drive green building project financing.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Michael C.P. Sing ◽  
Ivan W.H. Fung ◽  
David John Edwards ◽  
Henry Liu

PurposeThis paper develops a platform that can be used to determine how to effectively and efficiently deal with a large number of temporary facilities under a constrained site condition(s). The ultimate goal is to reduce the material handling costs between transformation phases of construction works occurring during the project's development period.Design/methodology/approachEmpirical and deductive research is first adopted to mathematical model dynamic site layout planning using the branch and bond algorithm (B&B). Second, a real-life construction project is examined to illustrate how dynamic site layout planning (using the aforementioned B&B algorithm and a computer software program called LINGO) can reduce the material handling costs. The application of the proposed methodology is then showcased against a case study that utilizes a comparative analysis between the “dynamic” and “statistic” site planning approaches.FindingsBy dividing the construction period into different phases, the developed model is shown to be capable of optimizing the material handling costs between the phases of transformation during construction works. Optimal costs are also considered using the site boundary and unit cost for moving construction materials between two facilities. The comparative analysis results illustrate that the B&B algorithm reduces material handling costs by 33%.Practical implicationsThe proposed model offers an effective planning algorithm for the site layout and location of temporary facilities. More specifically, it can make a substantial improvement in reducing the travel time and material handling cost between the temporary facilities in the construction sites.Originality/valueThe primary knowledge contribution of this study to the site layout is successfully deal with the unequal area problem of temporary site facilities and incorporates the concept of dynamics site planning into the algorithm.


Sign in / Sign up

Export Citation Format

Share Document