Renewables will ease, not solve, Africa's energy woes

Subject Green energy in Africa. Significance Power firm GSC Energy on February 10 announced it will begin work on a 2.2 billion dollar solar power plant in Cameroon in the second half of 2015. Reflecting a marked uptick in green energy investments, other projects -- such as a new biogas plant in Kenya -- have already begun feeding power directly into national grids, prompting renewed enthusiasm from policymakers. Impacts State guarantees for power utilities to keep them afloat is expanding the contingent liabilities, and thus fiscal risks, of many states. 'Green building' approaches will grow in popularity where incentives exist, and may draw on indigenous construction methods. Falling diesel prices will likely drive demand for -- and sales of -- individual generators and partially ease pressure on national grids.

2021 ◽  
Vol 4 (1) ◽  
pp. 145
Author(s):  
Rimbawati Rimbawati ◽  
Zulkifli Siregar ◽  
Mohammad Yusri ◽  
Muhammad Al Qamari

This community service program aims to implement a Solar Power Plant (PLTS) to provide electrical energy in tourist areas called rice field tourism, in order to reduce the cost of purchasing electrical energy for managers. Besides, it is also a means of education for visitors to introduce green energy in the future. The design of PLTS is adjusted to the requirements of the load that will be served at the tourist attraction. Before carrying out development, the Team first conducted outreach to local residents to introduce technology in rural areas. After the rotating program for managing tourism objects, in this case BUMDes Johar Mandiri, was given training in the operation, maintenance / maintenance of the solar power generation system, so that after the program it was able to solve the troubleshooting that occurred both in the generation system, control and distribution system. The resulting capacity of the Solar Power Plant in this Sawah Tour is 3500 WP which is used to meet all lighting needs. With this program, managers can reduce costs by Rp. 3,000,000 / month for electricity needs.


2019 ◽  
Vol 26 (4) ◽  
pp. 575-591
Author(s):  
Jittra Rukijkanpanich ◽  
Mathurot Mingmongkol

Purpose The purpose of this paper is to enhance the performance of maintenance in a solar power plant by implementing the proactive maintenance (PaM) strategy, measured by the availability and the total maintenance workload. Design/methodology/approach The prior maintenance strategy was reviewed, and then the strategy was adjusted to focus on PaM. Failure modes and effects analysis (FMEA) was a tool for analyzing the severity and occurrence of the failure modes and effects. Then, the Why‒Why analysis was used for investigating the root causes of failures. The countermeasures were drawn, and the preventive maintenance (PM) plan was revised and carried out. The total maintenance, the PaM and reactive maintenance workload, was obtained, and then the improvements were determined. The values of availability were also obtained. Findings Previously, the appeared maintenance strategy was not clearly defined. It seemed to have reactive maintenance coupled with PM; it was checked once a year, and corrective actions were made when something wrong was found. Then the management team observed an increase in the reactive maintenance workload, whereas the values of availability were not consistent and tended to drop. After implementing the new maintenance strategy, PaM, the total maintenance workload decreased 14 percent in one year. The average availability of the solar power plant improved from 0.9943 to 0.9969, and the values of availability had better consistency. Practical implications The PaM can be applied to solar power plant without limiting the prior maintenance strategy and the complexity of production or machinery. The solar power plant is a quite simple production, and most machines consist of electrical equipment and electrical circuits. The PaM supports to analyze the failure modes, the consequence of the failure events and failure effects, and to decide what should be done. Importantly, PaM can reduce total maintenance workload while the value of availability is higher and consistent. Originality/value This paper states how to successfully implement the PaM for the solar power plant. Previously, the plant did not have a clearly defined maintenance strategy; it was checked once a year, and it was corrected when abnormalities were detected. The PaM strategy provides tools and processes for failures and effects analysis. Although there was a more workload of PM, the total maintenance workload decreased, even in the first year.


2018 ◽  
Author(s):  
P. K. Verma ◽  
A. K. Vishnoi ◽  
Naveen Kumar ◽  
Arun K. Nayak ◽  
G. J. Gorade ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document