Benefit of a HVDC Back-to-Back Station in a Real Distribution Grid

Author(s):  
Niklas Wehbring ◽  
Raphael Bleilevens ◽  
Julian Saat ◽  
Maximilian Rose ◽  
Albert Moser
Energies ◽  
2018 ◽  
Vol 11 (5) ◽  
pp. 1156 ◽  
Author(s):  
Nikoleta Andreadou ◽  
Evangelos Kotsakis ◽  
Marcelo Masera

The modernization of the distribution grid requires a huge amount of data to be transmitted and handled by the network. The deployment of Advanced Metering Infrastructure systems results in an increased traffic generated by smart meters. In this work, we examine the smart meter traffic that needs to be accommodated by a real distribution system. Parameters such as the message size and the message transmission frequency are examined and their effect on traffic is showed. Limitations of the system are presented, such as the buffer capacity needs and the maximum message size that can be communicated. For this scope, we have used the parameters of a real distribution network, based on a survey at which the European Distribution System Operators (DSOs) have participated. For the smart meter traffic, we have used two popular specifications, namely the G3-PLC–“G3 Power Line communication” and PRIME–acronym for “PoweRline Intelligent Metering Evolution”, to simulate the characteristics of a system that is widely used in practice. The results can be an insight for further development of the Information and Communication Technology (ICT) systems that control and monitor the Low Voltage (LV) distribution grid. The paper presents an analysis towards identifying the needs of distribution networks with respect to telecommunication data as well as the main parameters that can affect the Inverse Fast Fourier Transform (IFFT) system performance. Identifying such parameters is consequently beneficial to designing more efficient ICT systems for Advanced Metering Infrastructure.


2019 ◽  
Vol 217 ◽  
pp. 01015 ◽  
Author(s):  
Christoph Strunck ◽  
Marvin Albrecht ◽  
Gerhard Meindl ◽  
Christian Rehtanz

The power system experiences many changes, which are leading to new challenges. The electric energy will no longer be generated only by large power plants, but rather by numerous decentralized energy resources that are primarily installed in distribution grids. In particular, power system restoration processes after a blackout will face new challenges. However, new opportunities by the widespread use of renewable energy resources arise. In this paper, the black start capability of a real distribution grid in Germany, operated by SWW Wunsiedel, will be investigated, as it has a high share of decentralised energy resources and a BESS with black start capability. For this purpose, the medium voltage level of the distribution grid is investigated with static load flow simulations to evaluate the best black start strategy. The driving forces of this black start concept are an 8 MW BESS unit and a 13.5 MW CHP plant.


2015 ◽  
Author(s):  
Jeffrey D. Taft ◽  
Paul De Martini ◽  
Lorenzo Kristov

Energies ◽  
2021 ◽  
Vol 14 (7) ◽  
pp. 1967
Author(s):  
Gaurav Kumar Roy ◽  
Marco Pau ◽  
Ferdinanda Ponci ◽  
Antonello Monti

Direct Current (DC) grids are considered an attractive option for integrating high shares of renewable energy sources in the electrical distribution grid. Hence, in the future, Alternating Current (AC) and DC systems could be interconnected to form hybrid AC-DC distribution grids. This paper presents a two-step state estimation formulation for the monitoring of hybrid AC-DC grids. In the first step, state estimation is executed independently for the AC and DC areas of the distribution system. The second step refines the estimation results by exchanging boundary quantities at the AC-DC converters. To this purpose, the modulation index and phase angle control of the AC-DC converters are integrated into the second step of the proposed state estimation formulation. This allows providing additional inputs to the state estimation algorithm, which eventually leads to improve the accuracy of the state estimation results. Simulations on a sample AC-DC distribution grid are performed to highlight the benefits resulting from the integration of these converter control parameters for the estimation of both the AC and DC grid quantities.


Energies ◽  
2021 ◽  
Vol 14 (4) ◽  
pp. 1114
Author(s):  
Pere Mir-Artigues ◽  
Pablo del Río

The reduction of equipment costs encourages the diffusion of photovoltaic micro-generation, however, proper regulatory measures should be implemented to facilitate self-production dissemination and to promote the emergence of new electricity markets which integrate prosumers. The specific form of these markets will depend on the level of prosumers’ self-sufficiency and the type of grid to which they will be connected. Unfortunately, Spain has been an example of resistance to micro-generation deployment. However, some things have started to change recently, albeit only to a certain extent. This article explains the key elements of the latest regulation of photovoltaic micro-generation in Spain and, through a stylized model, describes the economic behavior of prosumers in such a regulatory framework. It is concluded that this regulation only encourages prosumer plants which are strictly focused on self-sufficiency because it discourages exports and limits capacities and this regulation discourages the smart renewal of the distribution grid because it prevents prosumers from participating in the electricity market. It is recommended that the aforementioned regulatory limits be removed and pilot experiences for the market participation of prosumers be promoted by creating the appropriate technical and regulatory conditions, for example, at the municipal level.


Sign in / Sign up

Export Citation Format

Share Document