Implementation of Unified Power Flow Conditioner with SMC and FLC for Power Factor Improvement

Author(s):  
Jayashree K ◽  
Sangari A ◽  
Anto Sheeba J ◽  
Sivamani D ◽  
Shyam D ◽  
...  
2016 ◽  
Vol 136 (12) ◽  
pp. 991-996 ◽  
Author(s):  
Masataka Minami ◽  
Takeshi Ito ◽  
Shin-ichi Motegi ◽  
Masakazu Michihira

Energies ◽  
2021 ◽  
Vol 14 (13) ◽  
pp. 3843
Author(s):  
Sultan Sh. Alanzi ◽  
Rashad M. Kamel

This paper investigates the maximum photovoltaic (PV) penetration limits on both overhead lines and underground cables medium voltage radial distribution system. The maximum PV penetration limit is estimated considering both bus voltage limit (1.05 p.u.) and feeder current ampacity (1 p.u.). All factors affect the max PV penetration limit are investigated in detail. Substation voltage, load percentage, load power factor, and power system frequency (50 Hz or 60 Hz) are analyzed. The maximum PV penetration limit associated with overhead lines is usually higher than the value associated with the underground cables for high substation voltage (substation voltage = 1.05 and 1.04 p.u.). The maximum PV penetration limit decreases dramatically with low load percentage for both feeder types but still the overhead lines accept PV plant higher than the underground cables. Conversely, the maximum PV penetration increases with load power factor decreasing and the overhead lines capability for hosting PV plant remains higher than the capability of the underground cables. This paper proved that the capability of the 60-Hz power system for hosting the PV plant is higher than the capability of 50 Hz power system. MATLAB software has been employed to obtain all results in this paper. The Newton-Raphson iterative method was the used method to solve the power flow of the investigated systems.


Energies ◽  
2019 ◽  
Vol 12 (13) ◽  
pp. 2582 ◽  
Author(s):  
Samuel Lotsu ◽  
Yuichiro Yoshida ◽  
Katsufumi Fukuda ◽  
Bing He

Confronting an energy crisis, the government of Ghana enacted a power factor correction policy in 1995. The policy imposes a penalty on large-scale electricity users, namely, special load tariff (SLT) customers of the Electricity Company of Ghana (ECG), whose power factor is below 90%. This paper investigates the impact of this policy on these firms’ power factor improvement by using panel data from 183 SLT customers from 1994 to 1997 and from 2012. To avoid potential endogeneity, this paper adopts a regression discontinuity design (RDD) with the power factor of the firms in the previous year as a running variable, with its cutoff set at the penalty threshold. The result shows that these large-scale electricity users who face the penalty because their power factor falls just short of the threshold are more likely to improve their power factor in the subsequent year, implying that the power factor correction policy implemented by Ghana’s government is effective.


Sign in / Sign up

Export Citation Format

Share Document