Analysis of Supplier's Market Entry Decision with Traffic Congestion Cost

Author(s):  
Jie Zhang ◽  
Zhi Wang
2016 ◽  
Vol 43 (4) ◽  
pp. 304-311 ◽  
Author(s):  
Selin Gundes ◽  
Guzin Aydogan

There has been increasing interest in international construction since the late 1990s due to growing competition in global markets. A bibliometric analysis of international construction research is conducted to evaluate the trends and to map the productivity in the field. Using the Scopus database from 2003 to 2013; document type, research performance of leading journals and authors, geographic and institutional distribution of research is assessed. The core and sub topics of the literature is also analyzed to determine critical themes in international construction. Results reveal that (1) risk management, (2) measuring performance, (3) general strategy and (or) competitiveness, and (4) foreign market entry decision are the top four core themes in international construction research. The fluctuations in the number of papers in different subject categories reflect the new tendency in international construction debate, which emphasizes a shift from measuring performance themes to general strategy and (or) competitiveness and foreign market entry decision in international construction.


2014 ◽  
Vol 77 ◽  
pp. 37-44 ◽  
Author(s):  
Mir Shabbar Ali ◽  
Muhammad Adnan ◽  
Syed Muhammad Noman ◽  
Syed Fazal Abbas Baqueri

2018 ◽  
Vol 181 ◽  
pp. 06001
Author(s):  
Noor Mahmudah ◽  
Rizkie Akbar ◽  
Muchlisin

Due to imbalance of road capacity and traffic volume, so traffic congestion will be occurred either along the road and intersection. Demak Ijo intersection is one of signalized junction located in the western part of Yogyakarta with high traffic volume so traffic congestion is frequently occurred. The aim of this study is to analyze the performance of existing traffic condition and then estimate the congestion cost at signalized intersection by modeling (simulation) using Vissim 9. The analysis results show that existing traffic condition is in very bad condition (level F), average delay of 80 seconds, average queue length of 48.73 meters with congestion cost is about Rp. 2,830,336 per hour.


Sign in / Sign up

Export Citation Format

Share Document