Transmission and distribution system asset management

Author(s):  
M.L. Chan
Author(s):  
Douglas Hilleman ◽  
John M. Lindsay ◽  
Tim Hinson

Gainesville Regional Utilities (GRU) is a fully vertically-integrated utility with electric power generation, transmission, and distribution system owned by the City of Gainesville, FL. We have two primary generating plant sites: Deerhaven with two conventional coal-fired steam units (DH1 and DH2) and John R. Kelly (JCC1) combined-cycle Unit 1. Kelly Station (the focus of this study) is located in southeast Gainesville near the downtown business district. It has one - 120 MW combined-cycle unit (JCC1) in 1 × 1 configuration, consisting of: one GE Frame 7E combustion turbine (dual fuel), one Applied Thermal Systems two pressure HRSG, one 50-year old Westinghouse steam turbine unit with cooling tower, fuel storage, pumping equipment, transmission, and distribution equipment. In 2013, GRU with a seasonal peak load of approximately 500 MWs was to start receiving the output of a new 100 MW bio-fuel plant under a purchase power agreement. It was apparent that the operation of the GRU units would drastically change. It was predicted by GRU that DH2 a 255 MW coal unit would move to a cycling duty unit and the Kelly combined-cycle unit would be relegated to “peaking” operation. To better understand and predict future operational impacts, GRU contracted with Intertek AIM (APTECH) to conduct a Cost of Cycling study. This paper is our presentation of the results of the study and the changes that were indicated by the cycling analysis to manage the GRU system at the lowest cost and to incorporate the new modes of cycling operation. The expected modes of operation based on the results of the study were reversed to use the lowest cost unit for frequent cycling of JCC1 and changed the previously base loaded coal unit DH2 into a seasonal unit with long seasonal shut downs. This paper further shows the actions implemented by GRU at Kelly station to improve the cycling response and reduce the damage impact of each cycle by managing the startup ramp rates of the limiting equipment. The plant had limited budget for capital improvements and focused principally on managing the cost by modifying the startup procedures using real time operating data. Our conclusion was that by following the report recommendations, a new “Start Model” produced repeatable and acceptable results that minimized possible damage to the unit while meeting the need to use the renewable energy and support the customer by providing power at the lowest cost. The paper will demonstrate the improvement areas, the actual changes, and the results of those changes to the cycling data and the savings due to reduced damage.


2016 ◽  
Vol 26 (10) ◽  
pp. 2123-2133 ◽  
Author(s):  
Swasti R. Khuntia ◽  
José Luis Rueda ◽  
Sonja Bouwman ◽  
Mart A. M. M. van der Meijden

Energies ◽  
2021 ◽  
Vol 14 (2) ◽  
pp. 513
Author(s):  
Henryk Majchrzak ◽  
Michał Kozioł

The balancing of the power of the Polish Power System (KSE) is a key element in ensuring the safety of electric energy supplies to end users. This article presents an analysis of the power demand in power systems (PS), with emphasis on the typical power variability both in subsequent hours of the day and on particular days and in particular months each year. The methodology for calculating the costs of electric energy undelivered to the end users and the amount of these costs for KSE is presented. Different possibilities have been analyzed for balancing power systems’ peak load and assumptions have been formulated for calculating the amount of the related costs. On this basis, a comparative analysis has been made of the possibility to balance peak load using operators’ system services, trans-border connections, and various energy storage solutions. On the basis of the obtained results, optimal tools have been proposed for market-based influence from transmission and distribution system operators on energy market participants’ behaviors in order to ensure the power systems’ operating safety and continuous energy deliveries to end users.


1987 ◽  
Vol 20 (1) ◽  
pp. 18-25
Author(s):  
P Gilbert

The transmission and distribution system operated by British Gas plc is the largest integrated pipeline system in Europe. The whole system comprises a national transmission system which carries gas from five terminals to the twelve gas regions. Each region in turn carries the gas through a regional transmission system into a distribution grid and thence onto its customers. The national, regional and distribution system all present the instrument engineer with different technical challenges because of the way in which they have been built and are operated, however, it is simplest to characterise them by their process conditions. The operating pressure is highest in the national transmission system being up to 75 bar, in the regional transmission system the pressure is usually less than 37 bar, and in the distribution grid it is less than 7 bar. In general, the pipe diameters decrease from the national system downwards, and the measured flowrates are lowest in the distribution grids. This paper is concerned only with instrumentation on the national transmission system. The discussion will cover current technology which is typical of that being installed at present, and concentrates on the more commonly found instrumentation. The paper begins with a brief history of development of the national transmission system and a description of how it is operated. This is followed by a discussion on the application of computers to the control of unmanned installations. A section concerning the measurement of pressure and its application to the control of the system comes next. The main part of the paper contains an analysis of high accuracy flowmetering and the paper concludes with some comments on developments in instrumentation and their application to changing operation of the national transmission system.


Author(s):  
David K. Click ◽  
Houtan Moaveni ◽  
Kristopher O. Davis ◽  
Richard H. Meeker ◽  
Robert M. Reedy ◽  
...  

Author(s):  
Adel M Sharaf ◽  
Khaled Mohamed Abo-Al-Ez

In a deregulated electric service environment, an effective electric transmission and distribution networks are vital to the competitive environment of reliable electric service. Power quality (PQ) is an item of steadily increasing concern in power transmission and distribution. The traditional approach to overcoming capacity and quality limitations in power transmission and distribution in many cases is the addition of new transmission and/or generating capacity. This, however, may not be practicable or desirable in the real case, for many of reasons. From technical, economical and environmental points of view, there are two important - and most of the time combined - alternatives for building new transmission or distribution networks to enhance the transmission system capacity, and power quality: the Flexible alternating current transmission devices and controllers, and the distributed generation resources near the load centers. The connection of distributed generation to the distribution grid may influence the stability of the power system, i.e. angle, frequency and voltage stability. It might also have an impact on the protection selectivity, and the frequency and voltage control in the system. This paper presents a low cost FACTS based Dynamic Distribution System Compensator (DDSC) scheme for voltage stabilization and power transfer and quality enhancement of the distribution feeders connected to a dispersed wind generator, using MATLAB/ SimPower System simulation tool.


Sign in / Sign up

Export Citation Format

Share Document