Power-Quality Impact Assessment for High-Speed Railway Associated With High-Speed Trains Using Train Timetable—Part I: Methodology and Modeling

2016 ◽  
Vol 31 (2) ◽  
pp. 693-703 ◽  
Author(s):  
Haitao Hu ◽  
Zhengyou He ◽  
Xin Li ◽  
Ke Wang ◽  
Shibin Gao
Author(s):  
Diana Khairallah ◽  
Olivier Chupin ◽  
Juliette Blanc ◽  
Pierre Hornych ◽  
Jean-Michel Piau ◽  
...  

The design and durability of high-speed railway lines is a major challenge in the field of railway transportation. In France, 40 years of feedback on the field behavior of ballasted tracks led to improvements in the design rules. However, the settlement and wear of ballast, caused by dynamic stresses at high frequencies, remains a major problem on high-speed tracks leading to high maintenance costs. Studies have shown that this settlement is linked to the high acceleration produced in the ballast layer by high-speed trains traveling on the track, disrupting the granular assembly. The “Bretagne–Pays de la Loire” high-speed line (BPL HSL), with its varied subgrade conditions, represents the first large-scale application of asphalt concrete (GB) as the ballast sublayer. This line includes 77 km of conventional track with a granular sublayer of unbound granular material (UGM) and 105 km of track with an asphalt concrete sublayer under the ballast. During construction, instruments such as accelerometers, anchored deflection sensors, and strain gages, among others, were installed on four sections of the track. This paper examines the instrumentation as well as the acquisition system installed on the track. The data processing is explained first, followed by a presentation of the ViscoRail software, developed for modeling railway tracks. The bituminous section’s behavior and response is modeled using a multilayer dynamic response model, implemented in the ViscoRail software. A good match between experimental and calculated results is highlighted.


2021 ◽  
Vol 2021 ◽  
pp. 1-16
Author(s):  
Qin Zhang ◽  
Xiaoning Zhu ◽  
Li Wang ◽  
Shuai Wang

The optimization problems of train timetabling and platforming are two crucial problems in high-speed railway operation; these problems are typically considered sequentially and independently. With the construction of high-speed railways, an increasing number of interactions between trains on multiple lines have led to resource assignment difficulties at hub stations. To coordinate station resources for multiline train timetables, this study fully considered the resources of track segments, station throat areas, and platforms to design a three-part space-time (TPST) framework from a mesoscopic perspective to generate a train timetable and station track assignment simultaneously. A 0-1 integer programming model is proposed, whose objective is to minimize the total weighted train running costs. The construction of a set of incompatible vertexes and links facilitates the expression of difficult constraints. Finally, example results verify the validity and practicability of our proposed method, which can generate conflict-free train timetables with a station track allocation plan for multiple railway lines at the same time.


2012 ◽  
Vol 226-228 ◽  
pp. 102-105
Author(s):  
Wen Qing Zhu ◽  
Yang Yong Zhu

With the rapid development of high-speed railway in China, the aerodynamic brake is very likely to be an important emergency braking mode of high-speed train in the future. This paper takes aerodynamic braking wing as the object, and uses the finite element software to divide the meshes, then analyses the model influenced by static stress. After simulating the vibratory frequency response of the model in the flow field, it finds that the largest deformation happens in the middle of the upper edge of the wind wing, when the wind speed gets to 500km/h and the load frequency to 4Hz. Some conclusions of this thesis can provide reference for researching the applying the aerodynamic brake in the high-speed trains and laying the foundation for solving the riding and braking safety problems.


Electronics ◽  
2019 ◽  
Vol 8 (9) ◽  
pp. 998
Author(s):  
Yu Xiao ◽  
Gang Qiu ◽  
Yafeng Wang

With the increasingly demand for reliable mobile communication service in the high-speed railway (HSR) system, the service stability of HSR communication is of great concern in recent research. Focusing on ensuring the quality of services (QoS) and system throughput, massive multi-input multi-output (massive MIMO) and beamforming technologies have been widely applied. In this paper, aiming to minimize the communication outage probability (OP) and not to decrease spectrum efficiency (SE) too much, we propose a fast HBF (F-HBF) scheme for HSR communications. The proposed scheme uses a low-complexity beam-searching algorithm to trace high-speed trains in real time. The simulation results verify that the proposed scheme can significantly reduce OP without too much SE degradation.


2020 ◽  
pp. 107754632093689
Author(s):  
Hongye Gou ◽  
Chang Liu ◽  
Hui Hua ◽  
Yi Bao ◽  
Qianhui Pu

Deformations of high-speed railways accumulate over time and affect the geometry of the track, thus affecting the running safety of trains. This article proposes a new method to map the relationship between dynamic responses of high-speed trains and additional bridge deformations. A train–track–bridge coupled model is established to determine relationship between the dynamic responses (e.g. accelerations and wheel–rail forces) of the high-speed trains and the track deformations caused by bridge pier settlement, girder end rotation, and girder camber. The dynamic responses are correlated with the track deformation. The mapping relationship between bridge deformations and running safety of trains is determined. To satisfy the requirements of safety and riding comfort, the suggested upper thresholds of pier settlement, girder end rotation, and girder camber are 22.6 mm, 0.92‰ rad, and 17.2 mm, respectively. This study provides a method that is convenient for engineers in evaluation and maintenance of high-speed railway bridges.


Author(s):  
Nikolay Bushuyev ◽  
Darina Shulman

Objective: To consider the prospects for the development of high-speed railway lines (VSM) in Russia. To analyze the fundamentals of “Updated program of high-speed railway communication on the territory of the Russian Federation” approved on November, 23rd 2015 by the decision of OAO “RZhD” board meeting and the social board on the issues of high-speed railway communication in Russia. To formulate the specificities of high-speed traffic organization: promising directions of high-speed headings realization before 2030, as well as the stages of their implementation in Russia. Methods: Multiple regression analysis, as well as the method of multi criterial decisions optimization was applied in the study. Results: The analysis of current and perspective headings was carried out, as well as such characteristics as speed and the running time of “Sapsan” high-speed trains and “Allegro”, “Strizh”, “Lastochka” rapid trains. Special attention was paid to the comparison of strategies given in “Updated program of high-speed railway communication on the territory of the Russian Federation” with the main scientific findings stated in VSM network formation part, obtained on the basis of complex approach to the solution of justification of VSM network formation stage-by-stage approach, taking into account multi criterial estimation of cities and regions’ potential and application of mathematical traffic flow model approach as part of basic regional socioeconomic indices of cities and regions, situated in the zones attractive for future VSM construction. Practical importance: The conclusion was made on the necessity to continue exploratory development in the sphere of topology specification research and stage-by-stage formation of the first VSM in Russia.


Sign in / Sign up

Export Citation Format

Share Document