scholarly journals Single-machine Integrated Production Preventive Maintenance Scheduling: A Simheuristic Approach

MATEMATIKA ◽  
2020 ◽  
Vol 36 (2) ◽  
pp. 113-126
Author(s):  
Nurul Nadiah Abdul Halim ◽  
S. Sarifah Radiah Shariff ◽  
Siti Meriam Zahari

Preventive maintenance (PM) planning becomes a crucial issue in the real world of the manufacturing process. It is important in the manufacturing industry to maintain the optimum level of production and minimize its investments. Thus, this paper focuses on multiple jobs with a single production line by considering stochastic machine breakdown time.  The aim of this paper is to propose a good integration of production and PM schedule that will minimize total completion time. In this study, a hybrid method, which is a genetic algorithm (GA), is used with the Monte Carlo simulation (MCS) technique to deal with the uncertain behavior of machine breakdown time. A deterministic model is adopted and tested under different levels of complexity. Its performance is evaluated based on the value of average completion time. The result clearly shows that the proposed integrated production with PM schedule can reduce the average completion time by 11.68% compared to the production scheduling with machine breakdown time.

VASA ◽  
2012 ◽  
Vol 41 (5) ◽  
pp. 333-342 ◽  
Author(s):  
Kirchberger ◽  
Finger ◽  
Müller-Bühl

Background: The Intermittent Claudication Questionnaire (ICQ) is a short questionnaire for the assessment of health-related quality of life (HRQOL) in patients with intermittent claudication (IC). The objective of this study was to translate the ICQ into German and to investigate the psychometric properties of the German ICQ version in patients with IC. Patients and methods: The original English version was translated using a forward-backward method. The resulting German version was reviewed by the author of the original version and an experienced clinician. Finally, it was tested for clarity with 5 German patients with IC. A sample of 81 patients were administered the German ICQ. The sample consisted of 58.0 % male patients with a median age of 71 years and a median IC duration of 36 months. Test of feasibility included completeness of questionnaires, completion time, and ratings of clarity, length and relevance. Reliability was assessed through a retest in 13 patients at 14 days, and analysis of Cronbach’s alpha for internal consistency. Construct validity was investigated using principal component analysis. Concurrent validity was assessed by correlating the ICQ scores with the Short Form 36 Health Survey (SF-36) as well as clinical measures. Results: The ICQ was completely filled in by 73 subjects (90.1 %) with an average completion time of 6.3 minutes. Cronbach’s alpha coefficient reached 0.75. Intra-class correlation for test-retest reliability was r = 0.88. Principal component analysis resulted in a 3 factor solution. The first factor explained 51.5 of the total variation and all items had loadings of at least 0.65 on it. The ICQ was significantly associated with the SF-36 and treadmill-walking distances whereas no association was found for resting ABPI. Conclusions: The German version of the ICQ demonstrated good feasibility, satisfactory reliability and good validity. Responsiveness should be investigated in further validation studies.


2018 ◽  
Vol 8 (7) ◽  
pp. 1153 ◽  
Author(s):  
José Díaz-Reza ◽  
Jorge García-Alcaraz ◽  
Liliana Avelar-Sosa ◽  
José Mendoza-Fong ◽  
Juan Sáenz Diez-Muro ◽  
...  

The present research proposes a structural equation model to integrate four latent variables: managerial commitment, preventive maintenance, total productive maintenance, and productivity benefits. In addition, these variables are related through six research hypotheses that are validated using collected data from 368 surveys administered in the Mexican manufacturing industry. Consequently, the model is evaluated using partial least squares. The results show that managerial commitment is critical to achieve productivity benefits, while preventive maintenance is indispensable to total preventive maintenance. These results may encourage company managers to focus on managerial commitment and implement preventive maintenance programs to guarantee the success of total productive maintenance.


2015 ◽  
Vol 2015 ◽  
pp. 1-9 ◽  
Author(s):  
Jianfei Ye ◽  
Huimin Ma

In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.


2018 ◽  
Vol 43 (1) ◽  
pp. 37-40
Author(s):  
Mikhail Y. Kovalyov

Abstract A recently introduced lot scheduling problem is considered. It is to find a partition of jobs of n orders into lots and to sequence these lots on a single machine so that the total average completion time of the orders is minimized. A simple O(n log n) time algorithm is presented for this problem in the literature, with a relatively sophisticated proof of its optimality. We show that modeling this problem as a classic batching machine problem makes its optimal solution obvious.