The Optimization of Combined Cycle HRSGs as a Function of the Plant Load Duty
Natural gas fired combined cycle power plants now take a substantial share of the power generation market, mainly because they can be delivering power with a remarkable efficiency shortly after the decision to install is taken, and because they are a relatively low capital cost option. The power generation markets becoming more and more competitive in terms of the cost of electricity, the trend is to go for high performance equipments, notably as far as the gas turbine and the heat recovery steam generator are concerned. The heat recovery steam generator is the essential link in the combined cycle plant, and should be optimized with respect to the cost of electricity. This asks for a techno-economic optimization with an objective function which comprises both the plant efficiency and the initial investment. This paper applies on an example the incremental cost method, which allows to optimize parameters like the pinch points and the superheat temperatures. The influence of the plant load duty on this optimization is emphasized. This is essential, because the load factor will not usually remain constant during the plant life-time. The example which is presented shows the influence of the load factor, which is important, as the plant goes down in merit order with time, following the introduction of more modern, more efficient power plants on the same grid.