scholarly journals Research on Visual Management Technology of Tunnel Construction Process Based on BIM Technology

2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Yue Zhou ◽  
Chuang Wang ◽  
Bingxiang Yuan ◽  
Minjie Chen ◽  
Jianbing Lv

In order to achieve more efficient management of BIM technology in the field of tunnel construction, this paper took Zhuhai Dahengqinshan No. 1 Tunnel as the project background and studied the visualization management technology of tunnel construction process based on BIM technology. Firstly, we created the 3D geological model and tunnel BIM model by using Revit, 3dsmax, and other software. Secondly, the detailed design was carried out, and there was no gap in the model after the detailed design was checked by ABAQUS software. Then, we checked the problems between disciplines and conducted collision inspection in the model. Finally, we carried out the 4D construction progress simulation to solve the conflict between time and space in the whole life cycle of tunnel construction. The results revealed that the deepening design could optimize the design scheme of tunnel construction engineering. Collision inspection directly exposed problems such as unscientific site layout. 4D construction schedule management could not only realize the visualization of field construction process but also improve the quality of project management compared with traditional means. The research results provide technical experience for the visualization management of tunnel construction.

Author(s):  
Chengsen Wang ◽  
Kun Qu ◽  
Yizhe Ren ◽  
Lina Liu ◽  
Wei Wang

With the development of the times, people's economic level is improving, the urban construction is accelerated, the road, bridge and tunnel construction as the focus of the urban construction scale of construction projects and the construction quantity is also growing. Subsequently, people pay special attention to their quality problems. At the same time, there are many difficulties and technical problems waiting to be solved in the construction process. These difficulties and technical problems are the important factors influencing the quality of tunnel construction. Only strictly and comprehensively control it so that the roads, bridges and tunnels can be well and rapidly developed. Next, the paper will make a comprehensive analysis of the difficulties and technical countermeasures in the construction of road bridge tunnel.


2021 ◽  
Vol 276 ◽  
pp. 02021
Author(s):  
Xiang Gao

With the continuous development of the construction engineering industry, geotechnical engineering construction has attracted more and more attention from the society. In the construction process of geotechnical engineering, scientific and reasonable engineering investigation is the key to ensuring construction quality and improving engineering safety. Based on this, this article analyzes the application of measurement technology in the process of geotechnical engineering investigation. It is hoped that through this analysis, the application effect of measurement technology in geotechnical engineering survey can be effectively improved, and the quality of geotechnical engineering survey can be improved, so as to promote the overall construction quality and safety of geotechnical engineering.


2017 ◽  
Vol 11 (1) ◽  
pp. 1-13 ◽  
Author(s):  
Jyh-Bin Yang

As the complexity in construction projects increased, simply managing the obtained float values and critical path(s) by the CPM method usually results in more difficult schedule control and, consequently, in incorrect decision making due to non-realistic float values. This study thoroughly reviewed various float types in the literature and professional project management systems, and discussed five managerial essentials and three proactive strategies on mitigating challenging float-related problems based on the perspective of managing schedules by controlling floats. With some comments and suggestions, the outcomes of this study not only improve the knowledge level on schedule management but also provide a better understanding of float management to improve the quality of schedule management.


2018 ◽  
Vol 2 (3) ◽  
Author(s):  
Chengsen Wang ◽  
Kun Qu ◽  
Yizhe Ren ◽  
Lina Liu ◽  
Wei Wang

With the development of the times, people's economic level is improving, the urban construction is accelerated, the road, bridge and tunnel construction as the focus of the urban construction scale of construction projects and the construction quantity is also growing. Subsequently, people pay special attention to their quality problems. At the same time, there are many difficulties and technical problems waiting to be solved in the construction process. These difficulties and technical problems are the important factors influencing the quality of tunnel construction. Only strictly and comprehensively control it so that the roads, bridges and tunnels can be well and rapidly developed. Next, the paper will make a comprehensive analysis of the difficulties and technical countermeasures in the construction of road bridge tunnel.


Author(s):  
Xiong Zhou

With the increase in the number and scale of tunnel projects in China in recent years, the comprehensive management for quality inspection and monitoring measurement in the tunnel construction process is receiving more and more attention. Based on this, this paper analyzes the comprehensive management of quality inspection and monitoring during tunnel construction to ensure the quality of tunnel construction.


2014 ◽  
Vol 584-586 ◽  
pp. 2653-2658
Author(s):  
Yin Zi Zhang ◽  
Liang Cai Cai ◽  
Min Fan

Airport flying area construction is a complex dynamic process. Its typical features including: complex construction process, large construction area, underground pipe trench interwoven and so on. Traditional construction schedule management of airport flying area is based on Gantt charts and network diagrams, which is generated before the construction, not supporting real-time updates. A preliminary exploration of BIM-based schedule management in airport flying area engineering is conducted. Using Civil3D,Revit, Navisworks and MS Project software, the construction image progress model can be established. Manager also can achieve laying on the type of runway, the number of layers, daily progress charts and updates, and to achieve global control so as to improve management efficiency and management quality.


2019 ◽  
Vol 2 (5) ◽  
Author(s):  
Tong Wang

The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefore, real-time, comprehensive, rapid and accurate prediction of construction compaction quality through informatization detection method is an important guarantee for speeding up construction progress and ensuring subgrade compaction quality. Based on the function of the system, this paper puts forward the principle of system development and the development mode used in system development, and displays the development system in real-time to achieve the whole process control of subgrade construction quality.


2020 ◽  
Vol 9 (2) ◽  
Author(s):  
Vũ Xuân Hùng

In the process of teaching, technical teaching facilities are both a content and a means of conveying information, they help the lecturer organize and control the students' cognitive activities, in addition, they also help students be interested in learning, practice practical skills from which to form active and creative learning methods. Teaching technology is one of the necessary conditions to help teachers carry out their related work of educating, teaching and bringing up, and intellectual development, arouse the inherent intelligence qualities of students. Currently, the management of technical teaching facilities at the Central Kindergartens College has been carried out on a regular basis and achieved certain results, but in fact, there are still many inadequacies. Finding a number of limitations in the management of teaching technical facilities, thereby proposing solutions to overcome those limitations, improve the efficiency of investment, preservation and use of teaching technical facilities in the trend of Industry Revolution 4.0, improving the quality of teaching at Central Kindergarten Pedagogy colleges in the current period is a very important and urgent task.


Sign in / Sign up

Export Citation Format

Share Document