Reconstruction of buildings and utility structures in the system of urban development (project management)

Author(s):  
Владимир Лебедев ◽  
Vladimir Lebedev

The tutorial covers in detail the organization design and management, systems analysis and systematic construction and reconstruction, renovation and Testament of the construction industry, infographic modeling. the construction and reconstruction using the claim

2016 ◽  
Vol 15 (2) ◽  
pp. 453-460 ◽  
Author(s):  
Jana Selih ◽  
Lucila M.S. Campos ◽  
Andrea C. Trierweiller ◽  
Danielly Nunes de Carvalho

Author(s):  
Jake Kaupp ◽  
Brian Frank

The Canadian engineering accreditationboard (CEAB) mandate tasked each engineering programto assess student outcomes in the form of graduateattributes and develop a data-informed continuousprogram improvement stemming from those assessments.Administering, collecting and organizing the breadthassessment data is an extensive process, typicallycentralized through the use of software tools such aslearning management systems (LMS), contentmanagement systems (CMS), Assessment Platforms (AP)and Curriculum Planning & Mapping tools. Thesesystems serve a variety of roles, ranging from coursecontent delivery, e-learning, distance education, learningoutcomes assessment, outcomes data management andlearning outcomes analytics. Vendors have beendeveloping various solutions to accommodate the shifttowards outcomes based assessment as part of acontinuous improvement process.This paper will continue where the original paperpresented at CEEA 2013 left off. It will introduce the newclassifications of tools, how well each tool aligns with theEGAD (Engineering Graduate Attribute Development)project 5-step process and compare and contrast softwaretools supporting outcomes based assessment as part of acontinuous improvement process such as Chalk & Wire,Atlas Curriculum Mapping, Entrada, CoursePeer andother systems.


2017 ◽  
Vol 23 (1) ◽  
pp. 150-162 ◽  
Author(s):  
Jan-Simon SCHMIDT ◽  
Rainard OSEBOLD

The construction industry, as one of almost every economy’s major generators of environmental impact, can contribute in large measure to achieving the goals of sustainability. However, most publications in this field deal with sustainability with reference to selecting construction materials and improvements in the operating phase of buildings. When considering ecological sustainability the focus has to be extended from the finished building to the building pro­cess. Therefore the actors of the construction sector who are responsible for the production process have to be studied: the construction companies. The goal of this paper is to study the state of ecologically sustainable corporate business management in construction. The state of application of elements of environmental management systems (EMS) is used as an indicator of the current situation in German construction companies. EMS can help continuously to environmen­tally improve the operating processes of the firms. A broad survey about the extent of EMS has been conducted consid­ering the barriers and drivers. In general, a relatively low interest in EMS and a lack of knowledge is noticeable within the sector. As a result, strategic recommendations are made on how to promote environmental management to foster sustainable thinking in the German construction industry.


2021 ◽  
Vol 14 (1) ◽  
pp. 83-88
Author(s):  
Svetlana Mikhailovna SYCHEVA ◽  
◽  
Elena Yury’evna KUZMINA ◽  

The article discusses the features of the implementation of investment projects in the construction industry, the main trends in project management in this area. The importance of the construction industry for the country’s economy is substantiated, the key indicators of the construction sector and its contribution to GDP are highlighted. The analysis of the development of the construction industry for the period from 2009 to 2020 is carried out. The reasons for the decrease in investment in construction are identified, among them the most important ones are highlighted. In the article discusses the key characteristics of the construction industry in our country. The conclusion is made about the need for a systematic and integrated approach to the management of investment projects. The authors propose to use the tools of project management to improve the efficiency of the implementation of investment projects. The main tools of project management (tools for defragmentation of work, tools for managing the time in the project, tools for managing resources for project implementation, tools for managing project costs) are named and examples of their use are given. The concepts of «team», «project management team», «matrix of responsibility» are considered.


2013 ◽  
Vol 671-674 ◽  
pp. 2973-2977
Author(s):  
Jaeh Yun Choi ◽  
Kyu Sung Lee

As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner.


Sign in / Sign up

Export Citation Format

Share Document