scholarly journals Holomorphic Embedding Load Flow Modeling of the Three-phase Active Distribution Network

Author(s):  
Yuntao Ju

With large-scale distributed generators (DGs) in an active distribution network (ADN), conventional load flow convergence failure is incurred by heavy power transmission. The Holomorphic Embedding Load Flow Method (HELM) has proven to be more robust than the Newton–Raphson method under heavy power transmission. At present, HELM is mainly designed for balanced transmission networks. In this study, we developed a three-phase HELM model to accommodate DGs, delta connection loads, and ZIP loads for ADN. The effectiveness and better performance of the proposed method under heavy load situations were validated using modified unbalanced IEEE 13, 34, 37, and 123 test feeders.

Author(s):  
Yuntao Ju ◽  
Fuchao Ge ◽  
Yi Lin ◽  
Jing Wang

Open source software such as OpenDSS has given a lot of help to distribution network researchers and educators. With high penetration of distributed renewable energy resources into distribution network, tradition distribution steady state analysis software such as OpenDSS is faced with difficulty in handling distributed generators. Three-phase distributed generators are often modeled in sequence frame while unbalanced distribution network are usually modeled in phase frame. So a load flow in sequence-phase coupled frame is proposed to handle models described in both frames. Voltage controlled DGs which are difficult to cope with in OpenDSS are handled in proposed program. The steady state analysis platform is programmed with open source Modelica language and the main aim of this paper is to introduce an open source platform for active distribution network steady analysis include load flow and short circuit analysis which can be easily adopted and improved by other educators and researchers.


2014 ◽  
Vol 672-674 ◽  
pp. 1175-1178
Author(s):  
Guang Min Fan ◽  
Ling Xu Guo ◽  
Wei Liang ◽  
Hong Tao Qie

The increasingly serious energy crisis and environmental pollution problems promote the large-scale application of microgrids (MGs) and electric vehicles (EVs). As the main carrier of MGs and EVs, distribution network is gradually presenting multi-source and active characteristics. A fast service restoration method of multi-source active distribution network with MGs and EVs is proposed in this paper for service restoration of distribution network, which takes effectiveness, rapidity, economy and reliability into consideration. Then, different optimal power flow (OPF) models for the service restoration strategy are constructed separately to minimize the network loss after service restoration. In addition, a genetic algorithm was introduced to solve the OPF model. The analysis of the service restoration strategy is carried out on an IEEE distribution system with three-feeder and eighteen nodes containing MGs and EVs, and the feasibility and effectiveness are verified


2021 ◽  
Vol 2121 (1) ◽  
pp. 012035
Author(s):  
Yalei Li ◽  
Xiaohong Zhang

Abstract In view of the large scale distributed power distribution network, distribution network from the traditional single main transformer power supply system becomes more complex broken power supply network, the trend of the distribution network flow and network frame produced change, failure fault feature information of great change, the traditional distribution network fault location method can not accurately obtain the location of the fault zone, the low accuracy of fault location, the error bigger problem a new fault location method of active distribution network combining graph theory and matrix was proposed. According to the knowledge of graph theory, the distribution network is simplified to topology diagram and described in the form of matrix, and then the fault judgment matrix is obtained through a series of matrix addition operation, and the type of fault interval can be identified accurately and quickly by combining the fault criterion table. The simulation results show that this method is simple in principle, fast and effective in criterion, suitable for the flexible operation mode of active distribution network structure, can accurately and quickly determine the fault segment, and can meet the requirements of complex distribution network fault location.


2019 ◽  
Vol 11 (3) ◽  
pp. 309-331
Author(s):  
Assist. Prof. Dr. Inaam I. ALI ◽  
Mohanad Sh. Tarad AL-AASAM

Preliminary studies on Iraqi power system show a significant increase in the short circuit level at some of the grid substations and some power stations. This increasing results from the growth of the power generation and transmission systems in size and complexity. Islanding or splitting is dividing the power system into several islands inorder to reduce short circuit levels and avoiding blackouts. The main islanding problem is determining the location of proper splitting points and load balance and satisfaction of transmission capacity constraints for each islands.This paper mainly introduces new proposed splitting strategies of large-scale power systems by using (PSS™E version 30.3 PACKAGE PROGRAME), such that, make re-interconnection of 400KV super high voltage substation based on three-phase load flow to be minimum flow at splitting point and infeed fault current details method to control short circuit levels in Iraq power system without islanding the power system into isolated islands. Controlled islanding or splitting scheme is frequently considered as the final solution to avoid blackouts of power system.Simulation IEEE-25 bus and Iraqi power system used as the test systems for this method. Furthermore, simulation results show significant effectiveness on reducing short circuit levels with same time give stable splitting islands with same frequency for preventing the system blackouts.