Proposing an Online Testing Method for Gradual Migration of Information and Control System

Author(s):  
Junichi Toyouchi ◽  
Kojin Yano ◽  
Takao Terano ◽  
◽  

To respond to changes in the requirements of the information and control system, it is necessary to rebuild the system with new functions and/or systems with a different architecture. In this paper, we propose a method that enables on-site technicians to perform step-wise migration from a legacy system to a target system without having to stop the whole system and without requiring advance preparation or support from a system engineer who is an expert in system design and development. Accordingly, we aimed to develop a technology for the coexistence of and cooperation between with target and legacy systems and cooperation test between heterogeneous systems. We implemented this method and evaluated its effectiveness by applying it for rebuilding a production line management system.

Author(s):  
Margaret A. Abernethy ◽  
Jan Bouwens ◽  
Laurence van Lent

2014 ◽  
Vol 644-650 ◽  
pp. 722-725
Author(s):  
Fan Wu

A large cement factory as an example, according to the requirements of process and control parameters of production line of raw mill, this paper researches and designs the automatic control system of cement raw mill production line based on PCS7 and PROFIBUS. The design of the whole system consists of three levels: field layer, control layer and operation layer which are connected by Ethernet and PROFIBUS implementation, and focus on the design of the feed flow includeing feed composition, feed machine speed loop control etc. Through the on-site operation, the system is stable and reliable, and has good application and promotion effect.


IERI Procedia ◽  
2012 ◽  
Vol 3 ◽  
pp. 22-27
Author(s):  
Cai Dongyang ◽  
Zhuo Zihan ◽  
Cao Xinrong ◽  
Tang Jintian

Sign in / Sign up

Export Citation Format

Share Document