Core Flow Models For Analysis Of Laboratory Tests On Parameters For WAG Simulations: A Case Study From R. Trebs Oil Field

2015 ◽  
Author(s):  
A. A. Gimazov ◽  
K. G. Russkikh ◽  
K. Yu. Murinov ◽  
V. I. Savichev ◽  
A. K. Makatrov ◽  
...  
2015 ◽  
Author(s):  
A. A. Gimazov ◽  
K. G. Russkikh ◽  
K. Yu. Murinov ◽  
V. I. Savichev ◽  
A. K. Makatrov ◽  
...  

2016 ◽  
Author(s):  
S. Asawapayukkul ◽  
R. Laochamroonvorapongse ◽  
M. Pancharoen ◽  
Y. Rattanarujikorn ◽  
V. Tivayanonda ◽  
...  

2020 ◽  
pp. 120-127
Author(s):  
E. N. Skvortsova ◽  
O. P. Deryugina

The article discusses the results of a study on the selection of wax inhibitors that can be used at the Kondinskoye oil field during transportation and dehydration of the emulsion.Asphaltene precipitation is one of the most serious issues in oil production. The experiment was conducted in order to select the most effective wax inhibitors. We have carried out laboratory tests to choose the most effective wax inhibitor in the conditions of oil production, collection, preparation and external transport systems at the Kondinskoye oil field. Based on the data obtained, wax inhibitor-2, wax inhibitor-4, and wax inhibitor-6 have shown the best results in ensuring the efficiency of inhibition, which should be at least 70 %, and, therefore, they can be allowed to pilot tests. The recommended initial dosage of inhibitors according to the results obtained during pilot tests should be at least 500 g/t of oil.


1996 ◽  
Vol 7 (1-2) ◽  
pp. 111-116
Author(s):  
Michael Ed. Hohn ◽  
David L. Matchen ◽  
Ronald R. McDowell

2016 ◽  
Vol 63 (5) ◽  
pp. 414-420 ◽  
Author(s):  
Wei Yan ◽  
Yong Xiang ◽  
Wenliang Li ◽  
Jingen Deng

Purpose This paper aims to establish the downhole CO2 partial pressure profile calculating method and then to make an economical oil country tubular goods (OCTG) anti-corrosion design. CO2 partial pressure is the most important parameter to the oil and gas corrosion research for these wells which contain sweet gas of CO2. However, till now, there has not been a recognized method for calculating this important value. Especially in oil well, CO2 partial pressure calculation seems more complicated. Based on Dolton partial pressure law and oil gas separation process, CO2 partial pressure profile calculating method in oil well is proposed. A case study was presented according to the new method, and two kinds of corrosion environment were determined. An experimental research was conducted on N80, 3Cr-L80 and 13Cr-L80 material. Based on the test results, 3Cr-L80 was recommended for downhole tubing. Combined with the field application practice, 3Cr-L80 was proved as a safety and economy anti-corrosion tubing material in this oil field. A proper corrosion parameter (mainly refers to CO2 partial pressure and temperature) can ensure a safety and economy downhole tubing anti-corrosion design. Design/methodology/approach Based on Dolton partial pressure law and oil gas separation process, CO2 partial pressure profile calculating method in oil well is proposed. An experimental research was conducted on N80, 3Cr-L80 and 13Cr-L80 material. A field application practice was used. Findings It is necessary to calculate the CO2 partial pressure properly to ensure a safety and economy downhole tubing (or casing) anti-corrosion design. Originality/value The gas and oil separation theory and corrosion theory are combined together to give a useful method in downhole tubing anti-corrosion design method.


2013 ◽  
Vol 19 (5) ◽  
pp. 759-711 ◽  
Author(s):  
Andrew Ross ◽  
Katie Dalton ◽  
Begum Sertyesilisik

This study aims to determine the accuracy of the cash flow models and to investigate if these models could be more accurate if they accounted for the potentially influential variables specific to individual construction projects. An analytical case study research strategy has been implemented in collecting data for the construction projects. The data collected has been tested against recognised models. Statistical analyses have been carried out on the data for the specified variables, culminating in the potential proposal of an improved model with respect to these identified variables. The results revealed that the independent variables (type of construction, procurement route and type of work) affect the cash flow forecast. The findings suggested that a model could be more accurate with the input of more job-specific variables and that Hudson's DHSS model is best suited to a construction project procured traditionally. Adopting the ‘trial and error’ approach, Hudson's DHSS model has been recognised as an accurate model that could be adapted slightly, through changing the parameter values. The clients and the contractors are the main beneficiaries approached for this study.


Sign in / Sign up

Export Citation Format

Share Document