Geomechanics in Partnership – A Holistic Approach to Solving Drilling Challenges

2021 ◽  
Author(s):  
Mohammed Omer ◽  
Tosin Odunlami ◽  
Carlos Iturrious

Abstract With rising energy demand, operators in the Middle East are now focusing on developing unconventional resources. To optimize hydraulic fracture stimulation, most of these deep gas wells are required to be drilled laterally and in the direction of the minimum horizontal stress. However, this poses an increased risk of stuck pipe due to hole instability, differential sticking and skin damage due to high overbalance pressures, which makes drilling these wells challenging and costly. Another major challenge in the Middle East is lost circulation due to natural fractures in carbonate reservoirs. Lost circulation currently accounts for loss of approximately $850-900 million USD per year globally across the industry (Marinescu 2014). This paper presents a case study where a holistic approach; combining geomechanics and drilling technologies were employed to address the drilling challenges specific to unconventional and naturally fractured reservoirs. Ultimately, this approach helped the client to mitigate stuck pipe issues, while proposing a physics/engineering-basedmethodology to reduce losses by sealing fractures, hence providing a roadmap to optimized drilling and mitigation of hazards with associated Non-Productive Time (NPT). The paper demonstrates a holistic approach, combining wellbore stability analysis, managed pressure drilling (MPD) and proposes a novel physics/engineering-based methodology for addressing lost circulation challenges. A 1-D wellbore stability model is initially developed to determine the safe operating downhole pressure limits and to effectively assess the drilling risks associated with the planned wellbore orientation. By accurately determining the required bottomhole pressure to prevent wellbore stability problems, managed pressure drilling technology can be implemented to provide improved drilling hazard mitigation by enabling reduced overbalance pressures, constant bottomhole pressure, and faster reaction time by instantaneously adjusting downhole pressures. A bi-particulate bio-degradable system is used as a lost circulation material (LCM). The bigger size cylindrical particles flowing at a pre-defined rate will form a bridge or a plug across the fracture aperture, providing mechanical stability and the smaller spherical particles will seal the gaps in the bridge there by providing an effective sealing of the fracture opening. From experience, implementing these methodologies and technologies in isolation has not provided satisfactory results. This indicates that a partnership which leverages the strengths of the individual disciplines from the early planning stages is necessary to effectively address the drilling challenges posed by unconventional and naturally fractured reservoirs. For the case study highlighted in this paper, the well was drilled to TD in a timely manner, while maintaining the integrity of the hole, hence confirming the viability of this approach. In addition, the physics and engineering design workflow for bi-particulate bio-degradable LCM demonstrates how it can be effectively deployed to mitigate lost circulation without skin damage to the formation

2021 ◽  
Vol 11 (2) ◽  
pp. 767
Author(s):  
Nediljka Gaurina-Međimurec ◽  
Borivoje Pašić ◽  
Petar Mijić ◽  
Igor Medved

For years, drilling engineers have been faced with the challenge of drilling wells through naturally fractured reservoirs that are present around the world. During drilling, the pressure at the bottomhole of a well is frequently intentionally higher than formation pressure, which can result in the loss of mud in surrounding rocks. During well cementing, the bottomhole pressure is even higher than it is during drilling, because the cement slurry density is higher than the density of the mud. Therefore, if natural or induced fractures in the surrounding rocks are not plugged during drilling, the cement slurry can be lost to them, reducing their permeability which is undesirable in the case of a pay zone. To prevent the loss of circulation and the related consequences, it is necessary to apply good drilling and cementing practices and to use adequate methods and carefully selected materials for plugging the loss zones. The aim of this article is to give an overview of the preventive and corrective methods that can be applied in drilling and cementing through fractured zones as well as improvements in drilling and cementing technology to avoid lost circulation issues (e.g., aerated drilling fluid, casing while drilling, managed pressure drilling, expandable tubulars, lightweight cement slurries, etc.).


2021 ◽  
Author(s):  
Christian Windisch

Abstract This paper presents a holistic approach to modern oilfield and well surveillance through the inclusion of state-of-the-art edge computing applications in combination with a novel type of data transmission technology and algorithms developed in-house for automatic condition monitoring of SRP systems. The objective is to enable the responsible specialist staff to focus on the most important decisions regarding oilfield management, rather than wasting time with data collection and preparation. An own operated data communication system, based on LPWAN-technology transfers the dyno-cards, generated by an electric load cell, into the in-house developed production assistance software platform. Suitable programmed AI-algorithms enable automatic condition detection of the incoming dyno cards, including conversion and analysis of the corresponding subsurface dynamograms. A smart alarming system informs about occurring failure conditions and specifies whether an incident of rod rupture, pump-off condition, gas lock or paraffin precipitation occurred in the well. A surface mounted measuring device delivers liquid level and bottomhole pressure information automatically into the software. Based on these diverse data, the operations team plans the subsequent activities. The holistic application approach is illustrated using the case study of an SPR-operated well in an Austrian brownfield.


2021 ◽  
Author(s):  
Zhanna Kazakbayeva ◽  
Almas Kaidarov ◽  
Andrey Magda ◽  
Fuad Aliyev ◽  
Harshad Patil ◽  
...  

Abstract Drilling reservoir section in the oilfield located in Far North region is challenged with high risks of mud losses ranging from relatively minor losses to severe lost circulation. Numerous attempts to cure losses with traditional methods have been inefficient and unsuccessful. This paper describes implementation of Managed Pressure Drilling (MPD) and Managed Pressure Cementing (MPC) techniques to drill 6-1/8″ hole section, run and cement 5″ liner managing bottomhole pressure and overcoming wellbore construction challenges. Application of MPD technique enabled drilling 6-1/8″ hole section with statically underbalanced mud holding constant bottom hole pressure both in static and dynamic conditions. The drilling window uncertainty made it difficult to plan for the correct mud weight (MW) to drill the section. The MW and MPD design were chosen after risk assessment and based on the decisions from drilling operator. Coriolis flowmeter proved to be essential in deciphering minor losses and allowed quick response to changing conditions. Upon reaching target depth, the well was displaced to heavier mud in MPD mode prior to open hole logging and MPC. MPD techniques allowed the client to drill thru fractured formation without losses or gains in just a couple of days as compared to the months of drilling time the wells usually took to mitigate wellbore problems, such as total losses, kicks, differential sticking, etc. This job helped the client to save time and reduce well construction costs while optimizing drilling performance. Conventional cementing was not feasible in previous wells because of risks of losses, which were eliminated with MPC technique: bottomhole pressure (BHP) was kept below expected loss zones that provided necessary height of cement and a good barrier required to complete and produce the well. Successful zonal isolation applying MPC technique was confirmed by cement bond log and casing integrity test. Throughout the project, real-time data transmission was available to the client and engineering support team in town. This provided pro-active monitoring and real-time process optimization in response to wellbore changes. MPD techniques helped the client to drill the well in record time with the lowest possible mud weight consequently reducing mud requirements. The MPD system allowed obtaining pertinent reservoir data, such as pore pressure and fracture pressure gradients in uncertain geological conditions.


Sign in / Sign up

Export Citation Format

Share Document