Zarządzanie Wartością Przedsiębiorstwa Na Przykładzie Przedsiębiorstwa z Branży Związanej z Wytwarzaniem i Zaopatrywaniem w Parę Wodną, Gorącą wodę i Powietrze do Układów Klimatyzacyjnych (Enterprise Value Management on the Example of a Company in Production and Supply of Steam, Hot Water and Air Conditioning Supply Industry)

2013 ◽  
Author(s):  
Karolina Rosiak
2020 ◽  
Vol 3 (3) ◽  
pp. 50-55
Author(s):  
B. I. SHEVCHENKO ◽  

The article explores the concept of cost thinking based on methodological approaches developed in the domestic and foreign literature; the process of enterprise value management is analyzed in the article.


2012 ◽  
Vol 16 (3) ◽  
pp. 131
Author(s):  
Didik Ariwibowo

Didik Ariwibowo, in this paper explain that energy audit activities conducted through several phases, namely: the initial audit, detailed audit, analysis of energy savings opportunities, and the proposed energy savings. Total energy consumed consists of electrical energy, fuel, and materials in this case is water. Electrical energy consumption data obtained from payment of electricity accounts for a year while consumption of fuel and water obtained from the payment of material procurement. From the calculation data, IKE hotels accounted for 420.867 kWh/m2.tahun, while the IKE standards for the hotel is 300 kWh/m2.tahun. Thus, IKE hotel included categorized wasteful in energy usage. The largest energy consumption on electric energy consumption. Largest electric energy consumption is on the air conditioning (AC-air conditioning) that is equal to 71.3%, and lighting and electrical equipment at 27.28%, and hot water supply system by 4.44%. Electrical energy consumption in AC looks very big. Ministry of Energy and Mineral Resources of the statutes, the profile of energy use by air conditioning at the hotel by 48.5%. With these considerations in the AC target for audit detail as the next phase of activity. The results of a detailed audit analysis to find an air conditioning system energy savings opportunities in pumping systems. Recommendations on these savings is the integration of automation on the pumping system and fan coil units (FCU). The principle of energy conservation in the pumping system is by installing variable speed drives (VSD) pump drive motor to adjust speed according to load on the FCU. Load variations FCU provide input on the VSD pumps to match. Adaptation is predicted pump can save electricity consumption up to 65.7%. Keywords: energy audit, IKE, AC


The progressive development of the economy of the Republic of Kazakhstan is impossible without solving the issues of increasing energy efficiency and energy conservation. These issues are very relevant in the construction sector of Kazakhstan. Housing facilities, on average, consume 2-3 times more heat per square meter, than buildings in Europe. However, in Kazakhstan until now there is no methodology for determining the energy efficiency of buildings and structures that meets modern requirements. The methodology discussed in this article is harmonized with EU requirements and establishes a method for calculating the annual energy consumption of buildings for heating, hot water, ventilation and air conditioning, taking into account auxiliary energy for the operation of these systems, and is intended for use in the design of new construction, reconstruction (modernization) residential and public buildings, as well as operated buildings and structures.


2020 ◽  
Vol 2 (1) ◽  
pp. 4
Author(s):  
Shuangxi Zhang ◽  
Norriza Hussin

<p>Because of the limitations of Earned Value Management (EVM), there are great defects in managing software progress. Although Earned Schedule (ES) improves EVM, it is not reliable to utilize cost data to measure software progress. In 2014, Earned Duration Management (EDM), which is a new measurement method, was introduced. In this paper, via a practical case, the EDM method is used to measure the software progress.</p>


Sign in / Sign up

Export Citation Format

Share Document