Cost comparison of wastewater treatment in Danubian countries

2010 ◽  
Vol 62 (2) ◽  
pp. 223-230 ◽  
Author(s):  
Matthias Zessner ◽  
Christoph Lampert ◽  
H. Kroiss ◽  
S. Lindtner

This paper investigates the costs of wastewater treatment (including sludge management) within the Danube catchment countries A, CZ, SK, HU, SL, RO, BG and UA. TK is considered as well. Additionally, the paper compares the total costs of wastewater management (including sewerage) with the incomes in the different countries. The annual costs of wastewater treatment in Austria are about 30 €/p.e. y for large plants with nitrogen and phosphorus removal. In low income countries of the Danube and Black Sea catchment areas they are at a maximum 30% lower than in Austria. However, the incomes in countries like Bulgaria, Romania or Ukraine are 85% to 90% lower. The total annual costs for wastewater management (sewer development plus treatment) amount at least to 90€/p.e. y. Considering the level of income in those countries, financing of wastewater management completely by charges of the population equivalents connected is not feasible. Therefore other approaches for financing wastewater treatment are required.

2011 ◽  
Vol 63 (10) ◽  
pp. 2138-2142 ◽  
Author(s):  
X. S. Kang ◽  
C. Q. Liu ◽  
B. Zhang ◽  
X. J. Bi ◽  
F. Zhang ◽  
...  

The application of reversed A2/O process in practice in China is mainly discussed in this paper. As a new process on nitrogen and phosphorus removal, principle and technical features of reversed A2/O process are also summarized. The application in rebuilt wastewater treatment plant shows that reversed A2/O process not only has merits on high nitrogen and phosphorus removal efficiency, but also has merits on energy saving. The application in newly-build wastewater treatment plant shows that infrastructure and equipment investment of reversed A2/O process economized 15% and 10% respectively, compared to conventional A2/O process. The practical application shows that reversed A2/O process is a new nitrogen and phosphorus removal process, which is suitable for China's national conditions.


2013 ◽  
Vol 663 ◽  
pp. 958-963
Author(s):  
Chang Ming Shen ◽  
Dian Hai Yang ◽  
Guo Hua Wang

Nitrogen and phosphorus are the nutrients induced eutrophication, therefore the removal of nitrogen and phosphorus is the main target of domestic wastewater treatment. In order to achieve better nutrient removal effect with lower construction and operation cost, a new nitrogen and phosphorus removal process was developed based on simulation. New process named MUST was developed by mixing UCT and step-feed BNR technology together, and possessed the advantages of two processes. The results of simulation show that MUST can achieve similar treating effect with 20% shorter hydraulic retention time (HRT) compared with UCT process. The influent splitting ratio of 4:3:3 was recommended for MUST operation. A pilot experiment of MUST was also carried out according to simulation results, and achieved very good pollutant remove effect, the average COD, NH4+-N, TN, TP removal efficiency were 85.4%, 94.0%, 65.1%, 62.3% respectively under the condition of low influent COD/TN ratio. Considering the excellent pollutant removal capacity of MUST, an upgrade project chose it as wastewater treatment process. This paper just starts the research of MUST, further study is necessary and valuable.


Sign in / Sign up

Export Citation Format

Share Document