Full-Scale Long-Term Pilot Study of Peracetic Acid Disinfection at Northwest Langley Wastewater Treatment Plant in Vancouver, BC

2016 ◽  
Vol 2016 (13) ◽  
pp. 5441-5453
Author(s):  
Josh Goldman ◽  
Michael Hughes ◽  
Theresa Gregonia ◽  
Sarah Stewart
2011 ◽  
Vol 64 (5) ◽  
pp. 1089-1095 ◽  
Author(s):  
A. K. Sharma ◽  
T. Guildal ◽  
H. R. Thomsen ◽  
B. N. Jacobsen

The aim of this project was to investigate the potential of reducing number of mixers in the biological treatment process and thereby achieve energy and economical savings and contribute to cleaner environment. The project was carried out at Avedoere wastewater treatment plant and a full scale investigation was conducted to study the effect of reduced mixing on flow velocity, suspended solid sedimentation, concentration gradients of oxygen and SS with depth and treatment efficiency. The only negative effect observed was on flow velocity; however the velocity was above the critical velocity. The plant has been operating with 50% of its designed number of mixers since September 2007 and long term results also confirm that reduced mixing did not have any negative effect on treatment efficiency. The estimated yearly electricity saving is 0.75 GWh/year.


2015 ◽  
Vol 72 (3) ◽  
pp. 364-370 ◽  
Author(s):  
Agostina Chiavola ◽  
Alessandra Ridolfi ◽  
Emilio D'Amato ◽  
Simona Bongirolami ◽  
Ennio Cima ◽  
...  

Sludge reduction in a wastewater treatment plant (WWTP) has recently become a key issue for the managing companies, due to the increasing constraints on the disposal alternatives. Therefore, all the solutions proposed with the aim of minimizing sludge production are receiving increasing attention and are tested either at laboratory or full-scale to evaluate their real effectiveness. In the present paper, electro-kinetic disintegration has been applied at full-scale in the recycle loop of the sludge drawn from the secondary settlement tank of a small WWTP for domestic sewage. After the disintegration stage, the treated sludge was returned to the biological reactor. Three different percentages (50, 75 and 100%) of the return sludge flow rate were subjected to disintegration and the effects on the sludge production and the WWTP operation efficiency evaluated. The long-term observations showed that the electro-kinetic disintegration was able to drastically reduce the amount of biological sludge produced by the plant, without affecting its treatment efficiency. The highest reduction was achieved when 100% return sludge flow rate was subjected to the disintegration process. The reduced sludge production gave rise to a considerable net cost saving for the company which manages the plant.


2019 ◽  
Vol 18 (9) ◽  
pp. 2023-2034 ◽  
Author(s):  
Agnieszka A. Pilarska ◽  
Krzysztof Pilarski ◽  
Boguslawa Waliszewska ◽  
Magdalena Zborowska ◽  
Kamil Witaszek ◽  
...  

1990 ◽  
Vol 22 (1-2) ◽  
pp. 101-111 ◽  
Author(s):  
J. Wanner ◽  
M. Sýkora ◽  
M. Kos ◽  
J. Miklenda ◽  
P. Grau

The situation in the treatment of wastewaters from small sources in Czechoslovakia has been discussed and two types of manufactured rotating biological contactors have been described. The evaluation of RBCs' operation showed the main disadvantages of the contactors with conventional discs, viz. the low 0C and low mixing effect. In a newly designed RBC, the discs or packets of discs were replaced by a cage packed with a random medium. The cage was equipped with tubular aeration and mixing elements. The long-term tests with a pilot-plant and a full-scale unit using synthetic as well as municipal wastewaters proved the ability of the packed-cage RBC to achieve a low effluent BOD with such organic loadings when the effluent from the conventional RBCs already deteriorated. Besides the BOD removal the 0C of the packed-cage RBCs was tested to verify the possibility of the combined cultivation of suspended and fixed-film biomass. On the basis of results presented here, a new package wastewater treatment plant for about 500 PE will be designed.


2012 ◽  
Vol 7 (1) ◽  
Author(s):  
S. S. Fatima ◽  
S. Jamal Khan

In this study, the performance of wastewater treatment plant located at sector I-9 Islamabad, Pakistan, was evaluated. This full scale domestic wastewater treatment plant is based on conventional activated sludge process. The parameters which were monitored regularly included total suspended solids (TSS), mixed liquor suspended solids (MLSS), mixed liquor volatile suspended solids (MLVSS), biological oxygen demand (BOD), and chemical oxygen demand (COD). It was found that the biological degradation efficiency of the plant was below the desired levels in terms of COD and BOD. Also the plant operators were not maintaining consistent sludge retention time (SRT). Abrupt discharge of MLSS through the Surplus Activated sludge (SAS) pump was the main reason for the low MLSS in the aeration tank and consequently low treatment performance. In this study the SRT was optimized based on desired MLSS concentration between 3,000–3,500 mg/L and required performance in terms of BOD, COD and TSS. This study revealed that SRT is a very important operational parameter and its knowledge and correct implementation by the plant operators should be mandatory.