scholarly journals Managing IBS Project: The evolving roles and competencies of project manager

2018 ◽  
Vol 3 (11) ◽  
pp. 117 ◽  
Author(s):  
Izatul Laili Jabar ◽  
Faridah Ismail ◽  
Nur Mardhiyah Aziz

The purpose of this paper is to investigate the initial information related to the roles and competencies required for a project manager who managed IBS construction projects in the Malaysian construction industry.  Semi-structured interviews were conducted with the project managers who have experience in managing an IBS construction project. The finding reveals unanimously agreed that the project managers who managed IBS construction projects have to undertake extra roles which required additional competency as compared to the generic construction projects. It is hoped that the findings from this research will assist the project managers in their career development. Keywords: Competence; Construction; Project manager; Industrialized building systemeISSN 2398-4295 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. http://dx.doi.org/10.21834/ajbes.v3i11.107

2018 ◽  
Vol 3 (13) ◽  
pp. 160-167
Author(s):  
Izatul Farrita Mohd Kamar ◽  
Asmalia Che Ahmad ◽  
Mohmad Mohd Derus ◽  
Nik Nur Khairunnisa Nik Mohd Ainul Azman

This paper presents the findings of a preliminary survey, which is consist of the identification of issues and importance of safety and health cost allocation. Semi-structured interviews were conducted with seven (7) construction stakeholders who are involved in urban rail infrastructure project. The transcription and interpretation from the interview findings were carried out using Atlas.ti© qualitative software. The respondent views are needed to obtain safety items and related issues in developing this framework mainly for estimating the safety cost allocation.Keywords: Safety and Health Cost; Cost Framework; Urban Rail; Infrastructure Project.eISSN 2398-4279 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. DOI: https://doi.org/10.21834/ajqol.v3i13.172


2018 ◽  
Vol 3 (10) ◽  
pp. 167-177 ◽  
Author(s):  
Siti Syariazulfa Kamaruddin ◽  
Mohammad Fadhil Mohammad ◽  
Rohana Mahbub ◽  
Khairani Ahmad

The objective of the main research is to investigate the current state of implementation of mechanisation and automation in the Industrialised Building System (IBS). The aim of this paper however, is to provide an overview on the implementation of mechanisation and automation in the IBS construction approach. Questionnaire survey and semi structured interviews were conducted to collect the viewpoints among contractors and manufacturers of IBS to ensure the richness of the data collected. The results illustrated that although most respondents have agreed on most critical issues in the implementation of mechanisation and automation, they were not ready to move forward. These responses were quite consistent across the professions. Keywords: Modern method of construction (MMC); industrialised building system (IBS); mechanisation and automation; environment. eISSN 2514-751X © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. DOI: https://doi.org/10.21834/aje-bs.v3i10.324


2021 ◽  
Vol 6 (18) ◽  
Author(s):  
Nur Syuhada Jasni ◽  
Haslinda Yusoff ◽  
Purwatiningsih Wibowo

Sustainability has received a great deal of criticism, particularly the development of strategies, operationalization and implementation of those strategies. The study aimed to understand environmental practices in business operations and identify the internal business factors that influence the success of environmental practices. Semi-structured interviews were used to gather information from Malaysian Public-Listed Companies (PLCs) that significantly contributed to the advancement of sustainable development in the country. This study suggests a comprehensive set of data to investigate comparative analysis based on different industries for better insights. Keywords: Sustainability, environmental, social, internal business factors eISSN: 2398-4287© 2021. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open access article under the CC BYNC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians/Africans/Arabians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. DOI:https://doi.org/10.21834/ebpj.v6i18.3015


2021 ◽  
Vol 6 (16) ◽  
pp. 105-111
Author(s):  
Wan Ismahanisa Ismail ◽  
Mohamed Azmi Ahmad Hassali ◽  
Maryam Farooqui ◽  
Muhammad Nabil Fikri Roslan ◽  
Nazri Che Dom

Background: This study explores thalassemia patients' perceptions concerning the effectiveness of conventional therapies for Thalassemia healthcare. Method: The semi-structured interviews were audiotaped, transcribed verbatim, and translated into English. Results: Nearly all thalassemia patients reported to have relied on conventional treatment methods to treat and reduce the severity of their disease. Few patients reported not to comply with their treatment procedures due to fear of infection through blood transfusion, surgery and organ failure. Conclusions: In conclusion, patients showed positive views about the conventional therapies carried out for Thalassemia. Keywords:: Thalassemia; qualitative; conventional; complementary and alternative medicine eISSN: 2398-4287© 2021. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open access article under the CC BYNC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians/Africans/Arabians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. DOI: https://doi.org/10.21834/ebpj.v6i16.2665


2018 ◽  
Vol 3 (9) ◽  
pp. 37 ◽  
Author(s):  
Izatul Laili Jabar ◽  
Faridah Ismail

IBS application had claimed to offer a faster construction, high quality, cost saving, cleaner and safer construction site. However, several challenges in management during the construction phase had been identified by researchers. This paper aims to analyze the challenges and issues arise in managing IBS construction projects. The challenges and issues identified can be categorized into pre-construction, construction and post-construction phases. Categorizing the challenges and issues will help to increase the contractor's understanding and help them to be prepared in handling the situation that they may encounter during the project phases.Keywords: Issues, construction phases, construction process, project management.eISSN 2398-4279 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia.


2017 ◽  
Vol 2 (3) ◽  
pp. 63
Author(s):  
Zinas Zachariah Bako ◽  
Mahmud Mohd Jusan

The quality of finishes of housing space is imperative for the achievement of a qualitative living environment. This paper presents a part of the findings of housing interior finishes choices – behaviour and motivation among prospective house owners in Nigeria. The study was conducted within the methodological and conceptual frameworks of Means-End Chain (MEC) and Stated Housing Preference and Housing Choice (SHPHC) models. A questionnaire survey and semi-structured interviews were used to generate data which were content analysed. The results showed that 71.95% of the respondents preferred ceramic tiled floor finishes as the various motivational factors. Further research in housing interior finishes choice motivation is required. Keywords: means-end chain, laddering, stated housing preference and housing choice, housing interior finishes © 2017. The Authors. Published for AMER ABRA by e-International Publishing House, Ltd., UK. This is an open access article under the CC BYNC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia.


2017 ◽  
Vol 5 (1) ◽  
Author(s):  
I Gde Eka Dharsika ◽  
IN Budiartha ◽  
I W Yansen

Abstract: Problems in construction projects caused by the extension of working time and an increase in labor costs. A limited ability of project management contribute to the decline in the quality of project work. The quality of project manager has an important role to smooth a construction project. Dedication in this profession requires project managers to carry out the work going according to plan. Analyzing the quality of the project manager for the implementation of construction projectsis one wayto measure the quality of a project. It needs  a right measurements way to providean accurate assessment of qualified and reliable project managers. This study aimed to obtain and analyze the factors that affect the quality of the project manager and its to construction projects.This used a sample of 45 respondents from several construction projects in the area of Badung and Denpasar during the period 2007-2012. The method used in this study is the method of multiple linear regression analysis by testing for the F-test and t-test. The results found 8 dominant factor that has a value eigen values??> 1. Sequentially, the factors that have been named are experience 41.63%,  education 9.278%, knowledge 7.240%, ability 5.088%, character 4.047%, network 3.843%, relationship communication 3.550%, confidence 3.357%. Influence the quality of the project manager on the performance fee of 51.9%, against 43.1% for quality performance, on-time performance, with a value of 57.9%. The results of this study prove that the powerful influence between the quality of the construction project manager to the implementation of construction projects.


2017 ◽  
Vol 2 (5) ◽  
pp. 57
Author(s):  
Ahmad Ezanee Hashim ◽  
Zarina Isnin ◽  
Faridah Ismail ◽  
Nurul Ashikin Norrihan ◽  
Rashadah Razali

Stress is inevitable in any types of occupation and career. It is recognised as major managerial and economic issues which contribute to employee turnover and poor performance. There is  a  need to  understand how  to reduce the effects to employees. This study aims to determine the stress relationship between employees in commercial complex facilities management organisations. Data collection is through questionnaire surveys to employees and semi-structured interviews to selected facilities managers for commercial complexes in Klang Valley, Malaysia. 7he ßndings indicated existence of stress that affected the occupational and behavioural performances of employees. Keywords: Commercial complexes, Customers’ satisfaction, Human behaviour, Occupational stress eISSN 2514-7528 © 2017 The Author. Published for AMER ABRA by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia.


2019 ◽  
Vol 276 ◽  
pp. 02007
Author(s):  
Kartika Puspa Negara ◽  
Fiona Lamari ◽  
Connie Susilawati ◽  
Bambang Trigunarsyah

The influence of active client involvement towards project construction success is gaining recognition in the last few decades. The growing concern on the client involvement has drifted the perception towards client away from the passive role into contributor of project success. During client involvement in the construction project, a representative from client or client project manager (CPM) should be complemented with certain competencies in order to succeed in commissioning construction projects. Evidence shows that some public construction projects in Indonesia failed due to the lack of competency of client project managers. Whilst most of the previous studies concern on the competency of general project managers, this paper specifically investigates competency of project manager from client side who works as a civil servant, and commissioning public construction sectors. This paper aims to identify the important competencies required by CPM in construction projects in Indonesia and examine current Indonesian CPM competency standard. Relative Importance Index (RII) was employed to assess the important level of competencies. The findings will enrich understanding on client project manager competency and become a basis to undergird further empirical research in client project manager development areas.


2020 ◽  
Vol 5 (14) ◽  
pp. 195-200
Author(s):  
Mohd Rushdan Yasoa' ◽  
Wan Amalina Wan Abdullah ◽  
Wan Anisah Endut

This paper compares Shariah audit and Shariah review in Islamic banks in Malaysia based on reporting structure, independence, the scope of duties, technology used, guideline and methodology, coverage period, and officers’ qualification. The study employs a qualitative method by utilizing semi-structured interviews with nine (9) key industry players. Data gathered from a series of interviews have been transcripted and analyzed using Atlas.ti. This study uncovers that Shariah review and Shariah audit have apparent differences and play their roles as a second and third line of defense, respectively, that eventually could provide a stimulus to Shariah governance and strengthen market confidence.  Keywords: Shariah audit, Shariah review, Islamic banks, qualitative method. eISSN: 2398-4287© 2020. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open access article under the CC BYNC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. DOI: https://doi.org/10.21834/ebpj.v5i14.2208


Sign in / Sign up

Export Citation Format

Share Document