scholarly journals ANALISIS KUALITAS MANAJER PROYEK TERHADAP PELAKSANAAN PROYEK KONSTRUKSI (STUDI KASUS : DI DENPASAR DAN BADUNG)

2017 ◽  
Vol 5 (1) ◽  
Author(s):  
I Gde Eka Dharsika ◽  
IN Budiartha ◽  
I W Yansen

Abstract: Problems in construction projects caused by the extension of working time and an increase in labor costs. A limited ability of project management contribute to the decline in the quality of project work. The quality of project manager has an important role to smooth a construction project. Dedication in this profession requires project managers to carry out the work going according to plan. Analyzing the quality of the project manager for the implementation of construction projectsis one wayto measure the quality of a project. It needs  a right measurements way to providean accurate assessment of qualified and reliable project managers. This study aimed to obtain and analyze the factors that affect the quality of the project manager and its to construction projects.This used a sample of 45 respondents from several construction projects in the area of Badung and Denpasar during the period 2007-2012. The method used in this study is the method of multiple linear regression analysis by testing for the F-test and t-test. The results found 8 dominant factor that has a value eigen values??> 1. Sequentially, the factors that have been named are experience 41.63%,  education 9.278%, knowledge 7.240%, ability 5.088%, character 4.047%, network 3.843%, relationship communication 3.550%, confidence 3.357%. Influence the quality of the project manager on the performance fee of 51.9%, against 43.1% for quality performance, on-time performance, with a value of 57.9%. The results of this study prove that the powerful influence between the quality of the construction project manager to the implementation of construction projects.

2016 ◽  
Vol 4 (2) ◽  
Author(s):  
I Putu Widyarsana ◽  
N. Martha Jaya ◽  
Gd. Astawa Diputra

Abstract Badung regency in Bali, where the tourism industry is growing very rapidly. Building continues to grow, such as hotels, villas, resorts, hospitals, and so forth. Implementation of building construction projects in Badung not be separated from the issue of costs, quality of execution and completion time of the project. These problems arise due to lack of skills / competencies project manager of the responsibility to integrate and coordinate all available resources for the achievement of project objectives. In this case the role of Project Manager will determine the success of a project. So, there should be a study of the basic capabilities that must be owned by the Project Manager, among others: Conceptual Skills, Technical Skill, and Soft Skills. Data collection is done by the method of observation and surveys. Factor analysis was conducted to identify factors / characteristics Project Manager that affect the quality of the construction project implementation performance. Multiple linear regression analysis determined the relationship of the performance characteristics of the project manager building construction projects in Badung. Factor analysis resulted in the identification of 22 variables that affect the quality of the building construction project implementation performance. Multiple linear regression analysis determines the characteristics of the Project Manager greatest influence on the quality of the building construction project implementation performance is Social Skills aspect of 33.08% compared to the other two aspects, namely the conceptual skills (32.10%) and Technical (9.40%) . The total value of the influence of the three aspects of the characteristics of the project manager of 74.58% means that there are still approximately 25.42% influenced by other factors, such as the state of nature, the environmental situation, location, and so on, the implementation of building construction projects in Badung.


2019 ◽  
Vol 2 (1) ◽  
pp. 204
Author(s):  
Hermerilia Rumbarar ◽  
Dirarini Sudarwadi ◽  
Yulius Heri Saptomo

Construction project activities certainly involve a lot of human resource. The scope of work large and complex projects requires the ability of project managers to manage them well. The quality of project managers has an important role to smooth a construction project. Dedication in this profession requires the project manager to carry out the work goes according to plan. This study aims to determine whether the quality of project managers affect the performance of construction project in Southern Manokwari Regency (case study contactor in Ransiki District). This study uses a sample of 40 contractors flying at the Gapensi association of South Manokwari Regency.  Method of data analysis is used in this research are simple regression analysis , t test and r square. The results of this study indicate that the quality of project managers affect the performance of construction projects in South Manokwari Regency.  The results of data processing on the test coefficient of determination variable quality project manager is equal to 0.217 or 21,7%, t test results show that the variable quality of project managers affect the performance this is evindenced by the results of t test show significance value smaller than 0,05 ( 0,001 < 0,05) so the results of research indicate the variable of project manager quality influence to construction project performance in South Manokwari Regency.  


2020 ◽  
Vol 12 (24) ◽  
pp. 10376
Author(s):  
Sławomir Wawak ◽  
Žanesa Ljevo ◽  
Mladen Vukomanović

Project management frameworks describe the preferred approaches to project quality management, as well as applicable methods and tools. Despite this, quality problems in the construction project are still widespread. This study aimed to identify crucial quality-related factors in construction project management and find relations between them, to help researchers and project managers better respond to quality issues. A systematic literature review (SLR) was used to identify previous studies on quality-related factors. Literature review and further quantitative analysis revealed that quality-related factors are related to three categories: Quality of project process, quality of organisational processes, and quality of results (products), which together create the quality of the whole construction project. The results highlight quality-related factors (14 related to the quality of processes, 6 to quality of an organisation, and 13 to quality of products) that should be taken into account in further research, as well as planning and executing construction projects. Their inclusion at the planning stage should help project managers, sponsors, and steering committees avoid or minimise quality-related problems. Moreover, this study sheds an interesting light on quality. We found that the quality of processes and quality of an organisation has precedence over the final product quality. Based on the results of the study, structural equation modelling (SEM) was used to create a null model that will be the starting point for further research in the construction enterprises.


2019 ◽  
Vol 276 ◽  
pp. 02007
Author(s):  
Kartika Puspa Negara ◽  
Fiona Lamari ◽  
Connie Susilawati ◽  
Bambang Trigunarsyah

The influence of active client involvement towards project construction success is gaining recognition in the last few decades. The growing concern on the client involvement has drifted the perception towards client away from the passive role into contributor of project success. During client involvement in the construction project, a representative from client or client project manager (CPM) should be complemented with certain competencies in order to succeed in commissioning construction projects. Evidence shows that some public construction projects in Indonesia failed due to the lack of competency of client project managers. Whilst most of the previous studies concern on the competency of general project managers, this paper specifically investigates competency of project manager from client side who works as a civil servant, and commissioning public construction sectors. This paper aims to identify the important competencies required by CPM in construction projects in Indonesia and examine current Indonesian CPM competency standard. Relative Importance Index (RII) was employed to assess the important level of competencies. The findings will enrich understanding on client project manager competency and become a basis to undergird further empirical research in client project manager development areas.


Author(s):  
Georgios N. Aretoulis ◽  
Glykeria P. Kalfakakou ◽  
Aikaterini A. Seridou

“Cost Monitoring and Control Systems” (CMCS), are important for every construction project, in order to keep cost at completion, within budget. Uniqueness of every project requires a corresponding uniquely planned, organized and operating CMCS. Perception and realization of content and context of the CMCS are affected by experience and knowledge of the project manager (PM). This paper examines the influence of PMs' stereotypes on the CMCS. A prototype questionnaire was designed and a following survey took place. Statistical analysis highlighted several PMs' properties and conceptions that correlate with the setup and implementation of the CMCS.


2019 ◽  
Vol 280 ◽  
pp. 05010
Author(s):  
Candra Yuliana

The construction service company needs to think about the best strategy for dealing with delay in the project work schedule so that the cost overruns can be reduced to a minimum. The purpose of this research is to make a strategy for overcoming the delay of building project construction work in Banjarmasin. Primary data were obtained by field survey and interviews. The survey was conducted to project directors, project managers and the field, supervisors, and experts who are experienced in handling construction projects. The survey aims to collect data on the dominant factors causing delays in structural work, the impact of such delays on the budget plan, and the strategy of handling delays. The data were analyzed descriptively and AHP. Variable Y, which is the impact of the delay on changes in the work plan cost budget structure, is at a large level that is changing between 3% - 4% of the budget plan cost. The dominant factor to the cause of the delay is the slow decision-making process by the owner, the owner’s financial problem, the financial difficulties by the contractor, the mistake of choosing the construction method, the shortage of the project.


2008 ◽  
Vol 14 (4) ◽  
pp. 462-477 ◽  
Author(s):  
Edmundas Kazimieras Zavadskas ◽  
Zenonas Turskis ◽  
Jolanta Tamošaitienė

There is a number of criteria and associated sub‐criteria influencing the match of managers to construction projects. Criteria and sub‐criteria were identified based on a thorough review of the related literature and interviews of management personnel involved in the project managers selection. Project managers characteristics are considered to be less important for an effective project management. The model is based on multicriteria evaluation of project managers. The evaluation embraces the identified criteria influencing the process of construction project manager selection. This paper considers the application of grey relations methodology to defining the utility of alternatives, and offers a multiple criteria method of Complex Proportional Assessment of alternatives with grey relations (COPRAS‐G) for analysis. In this model, the parameters of the alternatives are determined by the grey relational grade and expressed in terms of intervals. A case study presents the selection of construction project manager. The results obtained show that this method may be used as an effective decision aid in multicriteria selection. Santrauka Rodiklių ir susietų subrodiklių skaičius daro poveikį statybos projektų vadovo parinkimui. Išnagrinėjus literatūrą buvo atrinkti pagrindiniai rodikliai, turintys įtaką projektų valdytojo atrankai. Išskirtos svarbiausios projektų valdytojo charakteristikos, gerinančios efektyvų statybos projektų valdymą. Projektų valdytojo modelis pagrįstas daugiatikslio vertinimo metodais. Straipsnyje apžvelgtas intervalais išreikštų sprendinių metodologijos pritaikymas, apibrėžtas alternatyvų naudingumas. Pateiktas daugiatikslio vertinimo kompleksinio proporcingumo įvertinimo metodas naudojant intervalais išreikštus rodiklius intervalais (COPRAS-G). Pateikiamame modelyje alternatyvų parametrai išreikšti intervalais, alternatyvos ranguojamos, nustatomas jų prioritetas. Sprendžiamas uždavinio pavyzdys rodo efektyvų statybos projektų valdytojo parinkimą. Tai iliustruoja gauti rezultatai.


Author(s):  
Georgios N. Aretoulis ◽  
Glykeria P. Kalfakakou ◽  
Aikaterini A. Seridou

“Cost Monitoring and Control Systems” (CMCS), are important for every construction project, in order to keep cost at completion, within budget. Uniqueness of every project requires a corresponding uniquely planned, organized and operating CMCS. Perception and realization of content and context of the CMCS are affected by experience and knowledge of the project manager (PM). This paper examines the influence of PMs' stereotypes on the CMCS. A prototype questionnaire was designed and a following survey took place. Statistical analysis highlighted several PMs' properties and conceptions that correlate with the setup and implementation of the CMCS.


2018 ◽  
Vol 1 (3) ◽  
pp. 113-121
Author(s):  
Zuhri Zuhri ◽  
Muhammad Isya ◽  
Hafnidar A.Rani

The number of contractor companies, especially in the field of roads every year continues to increase. Based on data obtained from LPJK website (Construction Services Development Agency) Province of Aceh Year 2016, shows that from 2,717 road contractors in Aceh Province, 1% of them are big qualification, 10% middle qualification and 89% small qualification. The problem is from the increasing number of road contractor companies in Aceh Province, it has not been followed by an increase in qualification and performance. These improvements can be seen from the quality of work, the timeliness of completion of implementation, and the efficiency of resource utilization of personnel, capital, and technology. This study aims to analyze the relationship and influence between contractor's qualification factors on the quality of road construction project, and to know the dominant factor in contractor company's qualification affecting the quality of road construction project in Banda Aceh City. This study used qualitative and quantitative methods through questionnaires, where the respondents were addressed to 90 road contractor companies. The contractor company has implemented projects from 2010-2016, with funding sources from APBA. The independent variables reviewed are contractor qualification factors consisting of legal factors, technical factors, and administrative factors, while the dependent variable is the quality of road construction projects. The results show that the legal, technical and administrative factors all have a very high relationship to the quality of road construction projects in Banda Aceh City. The contractor's qualifying factors all have a significant effect on the quality of road construction projects in Kota Banda Aceh of 91.6%. The dominant factor in the qualification of contractor companies affecting the quality of road construction projects in Banda Aceh is the technical factor. This suggests that when engineering factors are improved by contractors, the quality of road construction projects will increase.


2018 ◽  
Vol 3 (11) ◽  
pp. 117 ◽  
Author(s):  
Izatul Laili Jabar ◽  
Faridah Ismail ◽  
Nur Mardhiyah Aziz

The purpose of this paper is to investigate the initial information related to the roles and competencies required for a project manager who managed IBS construction projects in the Malaysian construction industry.  Semi-structured interviews were conducted with the project managers who have experience in managing an IBS construction project. The finding reveals unanimously agreed that the project managers who managed IBS construction projects have to undertake extra roles which required additional competency as compared to the generic construction projects. It is hoped that the findings from this research will assist the project managers in their career development. Keywords: Competence; Construction; Project manager; Industrialized building systemeISSN 2398-4295 © 2018. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open-access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia. http://dx.doi.org/10.21834/ajbes.v3i11.107


Sign in / Sign up

Export Citation Format

Share Document