SAFETY CONSIDERATION OF FIRE SHUTTERS IN LARGE BUILDING SPACE

2002 ◽  
Vol 11 (2) ◽  
pp. 195-208 ◽  
Author(s):  
L. T. WONG ◽  
W. W. YUEN
2021 ◽  
Vol 11 (14) ◽  
pp. 6537
Author(s):  
Marian Łupieżowiec

The article presents the concept of monitoring buildings and infrastructure elements located near large construction investments (the construction of high-rise buildings of the Oak Terraces housing estate in Katowice and the construction of a tunnel under the roundabout in Katowice along the intercity express road DTŚ). The impacts include deep excavation, lowering of the groundwater level over a large area, and dynamic influences related to the use of impact methods of soil improvement. The presented monitoring includes observation of the groundwater level with the use of piezometers, geodetic measurements of settlement and inclinations, as well as the measurement of vibration amplitudes generated during the works involving shocks and vibrations. It was also important to observe the development of cracks on the basis of a previously made inventory of damage. The results of the monitoring allow corrections to be made in the technology of works (e.g., reduction of vibration amplitudes, application of additional protections at excavations, etc.) or the use additional safety measures. Currently, there are also monitoring systems used during the operation of completed facilities.


Author(s):  
Lindsay N. Moreland-Head ◽  
James C. Coons ◽  
Amy L. Seybert ◽  
Matthew P. Gray ◽  
Sandra L. Kane-Gill

Introduction: Drug-induced QTc-prolongation is a well-known adverse drug reaction (ADR), however there is limited knowledge of other drug-induced arrhythmias. Purpose: The objective of this study is to determine the drugs reported to be associated with arrhythmias other than QTc-prolongation using the FAERS database, possibly identifying potential drug causes that have not been reported previously. Methods: FAERS reports from 2004 quarter 1 through 2019 quarter 1 were combined to create a dataset of approximately 11.6 million reports. Search terms for arrhythmias of interest were selected from the Standardized MedDRA Queries (SMQ) Version 12.0. Frequency of the cardiac arrhythmias were determined for atrial fibrillation, atrioventricular block, bradyarrhythmia, bundle branch block, supraventricular tachycardia, and ventricular fibrillation and linked to the reported causal medications. Reports were further categorized by prior evidence associations using package inserts and established drug databases. A reporting odds ratio (ROR) and confidence interval (CI) were calculated for the ADRs for each drug and each of the 6 cardiac arrhythmias. Results: Of the 11.6 million reports in the FAERS database, 68,989 were specific to cardiac arrhythmias of interest. There were 61 identified medication-reported arrhythmia pairs for the 6 arrhythmia groups with 33 found to have an unknown reported association. Rosiglitazone was the most frequently medication reported across all arrhythmias [ROR 6.02 (CI: 5.82-6.22)]. Other medications with significant findings included: rofecoxib, digoxin, alendronate, lenalidomide, dronedarone, zoledronic acid, adalimumab, dabigatran, and interferon beta-1b. Conclusion: Upon retrospective analysis of the FAERS database, the majority of drug-associated arrhythmias reported were unknown suggesting new potential drug causes. Cardiac arrhythmias other than QTc prolongation are a new area of focus for pharmacovigilance and medication safety. Consideration of future studies should be given to using the FAERS database as a timely pharmacovigilance tool to identify unknown adverse events of medications.


2021 ◽  
Vol 13 (3) ◽  
pp. 1350
Author(s):  
Luz Elba Torres-Guevara ◽  
Vanessa Prieto-Sandoval ◽  
Andres Mejia-Villa

This paper contributes to the circular economy (CE) literature by investigating the drivers of success of the CE implementation in the construction sector and how those drivers can complement any implementation process in small and medium enterprises (SMEs). To do so, we analyzed the case of TECMO Estructuras Metálicas, using the methodology proposed by Jaca and colleagues to implement the CE in SMEs. It is a Colombian company with more than five decades of experience in the manufacture and installation of steel and aluminum structures for small and large building and infrastructure projects. The data were collected between August 2019 and November 2020 through direct communication with the company via workshops, meetings, and company reports. This research found that five drivers are relevant for implementing CE in the construction sector: fertile ecosystem, management commitment, identification of valuable materials, green teams, and CE intermediaries. Moreover, this study also contributes to teaching the implementation of the CE in companies, since it shows that through the methodology presented, implementation projects can be developed in postgraduate classes.


2021 ◽  
pp. 111683
Author(s):  
Miles J.S. Gulliford ◽  
Richard H. Orlebar ◽  
Max H. Bird ◽  
Salvador Acha ◽  
Nilay Shah
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document