LONG TERM ADDITIONAL LOAD ON A SHIELD TUNNEL IN SOFT CLAY DUE TO CLAY CONSOLIDATION WITH WATER LEAKAGE
2020 ◽
Vol 76
(1)
◽
pp. 49-61
2017 ◽
Vol 73
(3)
◽
pp. I_75-I_84
Keyword(s):
2019 ◽
Vol 75
(2)
◽
pp. I_20-I_29
2021 ◽
Vol 112
◽
pp. 103862
Keyword(s):
2021 ◽
Vol 861
(7)
◽
pp. 072050
Keyword(s):
Keyword(s):