Project management is not only a tool for achieving business goals, but also a mechanism for strategic development of the company. This is due to the fact, that the achievement of strategic goals in any area is directly related to the effective implementation of individual projects. In the framework of the study, the development of project management practices in the hotel business is evaluated using the project management maturity model. It is revealed that the use of project management practices in Kazakhstan hotels lags behind hotels of international chains.

2019 ◽  
Vol 12 (4) ◽  
pp. 1120-1145 ◽  
Author(s):  
Gabriele Hofinger Jünge ◽  
Erlend Alfnes ◽  
Kristina Kjersem ◽  
Bjorn Andersen

PurposeThe purpose of this paper is to empirically investigate an effective project management practice focusing on planning and control. By doing so, it contributes to the debate on rethinking traditional project management practices and accentuates the need for adjustments based on the project context.Design/methodology/approachThis paper extends the project management theory by proposing a lean project planning (LPP) and control framework, developed and tested in collaboration with ten engineer-to-order (ETO) companies. By following a design science research approach, elements from lean thinking and current project planning and control practices are combined into a maturity model (MM).FindingsETO project characteristics are identified, and their implications for planning and control are discussed. Nine enablers that transform current project planning and control approaches into a lean approach are defined, allowing the analysis of the underlying complexity of planning and controlling ETO projects and thus facilitating the determination of the actions required to improve project performance.Research limitations/implicationsOnce fully embedded in an organization, the presented MM can provide a safe framework for self-criticism and can be used to conduct self-assessments without the need for an external facilitator. Thus, this paper is of particular interest to practicing project managers who aim to implement LPP and control.Originality/valueTo the authors’ best knowledge, this paper is the first to empirically examine the journey toward LPP and control from a MM perspective. This research attempts to describe the enablers of LPP and control.


2000 ◽  
Vol 31 (1) ◽  
pp. 32-43 ◽  
Author(s):  
C. William Ibbs ◽  
Young Hoon Kwak

The principal goal of this study was to determine the financial and organizational impacts of project management. This study began with the development of a project management maturity model and an analysis methodology to assess the maturity of project management processes. The project management maturity analysis methodology consists of 148 multiple-choice questions that measure project management maturity, and cover 8 knowledge areas and 6 project phases. The maturity model and methodology were then applied by benchmarking 38 different companies and government agencies in 4 different industries. This assessment methodology provides solid and comparative studies on project management practices across industries and companies within an industry. It also provides a set of tools for organizations to use in identifying key areas of opportunity for improvement in project management.


Author(s):  
ANDRÉ MARQUES PEREIRA ◽  
RAFAEL QUEIROZ GONÇALVES ◽  
CHRISTIANE GRESSE VON WANGENHEIM ◽  
LUIGI BUGLIONE

Software projects often fail, because they are not adequately managed. The establishment of effective and efficient project management practices still remains a key challenge to software organizations. Striving to address these needs, "best practice" models, such as, the Capability Maturity Model Integration (CMMI) or the Project Management Body of Knowledge (PMBOK), are being developed to assist organizations in improving project management. Although not required, software tools can help implement the project management process in practice. In order to provide comprehensive, low-cost tool support for project management, specifically, for small and medium enterprises (SMEs), in this paper we compare the most popular free/open-source web-based project management tools with respect to their compliance to PMBOK and CMMI for Development (CMMI-DEV). The results of this research can be used by organizations to make decisions on tool adoptions as well as a basis for evolving software tools in alignment with best practices models.


Author(s):  
Bersam Bolat ◽  
Aslı Kuşdemir ◽  
İpek Ceren Uslu ◽  
Gül Tekin Temur

The statistical assessments point out that approximately half of information technology (IT) projects cannot provide basic necessities and a quarter of them fail. Therefore, the necessity of effective project management tools to enhance the project management practices increases day by day. “Project management maturity model” as one of these tools is attached more importance in IT firms. This study aims to present a framework for IT project maturity level measurement and indicate how project management maturity level differs in terms of firm characteristics. Within the scope of the research, Kerzner's Hexagon of Excellence is extended with additional questions related with firm characteristics, and a case study including 16 firms from Istanbul Technical University (ITU) ARI Techno Park is conducted. In the light of responses, (1) problems which are realized in the project management processes revealed out, (2) relation between firm characteristics and project management skills are discussed and (3) results are interpreted in order to provide managerial insights.


2017 ◽  
Vol 6 (2) ◽  
pp. 97-107
Author(s):  
Ruslan Kostiukevych ◽  
Alina Kostiukevych

The unified territorial communities are new structural units in the administrative system of Ukraine. In addition to the problems of regulatory and financial nature, issues of scientific and methodological substantiation of the processes of strategic development of the unified territorial communities on the principles of applying modern methodologies and project management practices are also relevant. The article develops methodological approaches to the formation and management of project portfolios for the implementation of strategies for the sustainable development of unified territorial communities on the principles of applying a value-oriented model of project management. The organizational aspects of the introduction of project management in the united territorial communities have been developed based on the creation of a project management office (committee) for managing strategies. The proposed approaches to the formation of territorial strategies will help to ensure the community's economic development and the effectiveness of utilizing the resources available to the communities.


2009 ◽  
pp. 74-84
Author(s):  
Claude Besner ◽  
Brian Hobbs

THE PAPER EMPIRICALLY MEASURES THE INTERPLAY BETWEEN RISK MANAGEMENT AND UNCERTAINTY AND THE CONTEXTUAL VARIABILITY OF RISK MANAGEMENT PRACTICE. THE RESEARCH FIRST CLARIFIES THE CONCEPTS OF UNCERTAINTY, RISK AND RISK MANAGEMENT. THE RESEARCH DEFINES RISK MANAGEMENT FROM AN EMPIRICAL PERSPECTIVE I.E., FROM AN EMPIRICALLY IDENTIFIED SET OF TOOLS THAT IS ACTUALLY USED TO PERFORM RISK MANAGEMENT. THIS TOOLSET IS DERIVED FROM THE RESULTS OF AN ONGOING MAJOR WORLDWIDE SURVEY ON WHAT EXPERIENCED PRACTITIONERS ACTUALLY DO TO MANAGE THEIR PROJECTS. THIS PAPER USES A SAMPLE OF 1,296 RESPONSES FOR WHICH THE INTERPLAY BETWEEN RISK MANAGEMENT AND UNCERTAINTY COULD BE MEASURED. The results are very coherent. They verify and empirically validate many of the propositions drawn from a review of the literature. But results challenge some of the propositions found in the conventional project management literature and some commonly held views. The research shows that the use of risk management practices and tools is negatively related to the degree of project uncertainty. This somewhat counter-intuitive result is consistent with a general tendency for all project management tools and techniques to be used more intensively in better defined contexts. The dominant project management paradigm is oriented towards reducing or controlling uncertainty, but is less well adapted to unforeseeable events and high levels of uncertainty. A better understanding of the reality of the actual practice leads to a discussion about supplementing the current paradigm with new approaches to manage the uncertainty that cannot be removed or reduced by the conventional project management approach.


2013 ◽  
pp. 147-156 ◽  
Author(s):  
M. Latukha ◽  
T. Tsukanova

The study investigates talent management practices in Russian and foreign companies. The inquiry of Russian and foreign companies (working in Russia) showed that perceived and dedicated talent management practices contribute to better companies performance. The study results can be used in talent management practice development.


2019 ◽  
Vol 5 (2) ◽  
pp. 109-115
Author(s):  
Johanes Fernandes Andry ◽  
Gunawan Wang ◽  
Gusti Ngurah Suryantara ◽  
Devi Yurisca Bernanda

PT Hema Indonesia is manufacturing company established in 2001 and has continued to grow. Nowadays the company has supported business processes in various companies, such as the use of information systems. The purpose of this research is to get an overview of the performance of information systems in order to determine the extent of maturity level which is currently running, with a few aspects to consider such as effectiveness and, efficiency. Implementing IT governance, however, is a challenge to organizations. To ensure IT alignment with business goals use standard COBIT. The analytical tool used is the standard procedure COBIT issued by ISACA. In this paper the method to be used is COBIT 4.1. Coverage of Audit IT Domain are Plan Organize (PO), such as PO4, PO5, PO7 and PO8. The conclusion that can be drawn from the research that has been done is IT governance at the company has been done, although still run optimally within each IT process contained in the sub domain average on level repeatable and defined proses.