scholarly journals On the Relationship between Time-dependent Strain Variations on Core Surface and In-situ Stress.

1994 ◽  
Vol 110 (1) ◽  
pp. 80-86 ◽  
Author(s):  
Harumi KATO ◽  
Yoshiaki MIZUTA ◽  
Osam SANO
2014 ◽  
Vol 633-634 ◽  
pp. 1311-1314
Author(s):  
Xiao Zeng Wang ◽  
Zhan Qu ◽  
Yi Hua Dou

The distribution of the non-uniform in situ stress around wellbore will impair the stability of the rock of wellbore wall. Drilling the underbalanced wells and depleted formations, the instability of the wellbore can result in the drilling failure. Mechanics model of the wellbore wall rock is developed. According to the relationship between the stress function and components of stresses, the superposition principle is adopted to develop the formulas of the radial, hoop, and shear stresses of the wellbore wall under the non-uniform in situ stress. The formula of the mud density which do not crash the rock of wellbore wall is derived. The error of the mud density between fitting formula developed in the paper and theoretical method is less than 2.5%. The mud density that ensure the stability of wellbore is determined.


2021 ◽  
Vol 2021 ◽  
pp. 1-17
Author(s):  
Shankun Zhao ◽  
Jianping Zuo ◽  
Lei Liu ◽  
Kaijun Wu

The coal pillar stress distribution at the 311102 working face in the Bayangaole Mine is analyzed and revealed. In addition, borehole stressmeter, PASSAT monitoring system, and numerical modelling are fully utilized. Based on the patterns of acoustic wave velocity distribution, it is discovered that the impact created by mining activity can expand into the working face around 40 m, where the peak stress concentration is found about 15 m ahead. According to borehole stressmeter readings, mildly impacted, ordinarily impacted, and severely impacted zones are distinguished. The equilibrium theory and corresponding calculation indicated that the coal body in front of the working face has a plastic zone width of 4.96 m. The stress-displacement analysis based on numerical simulation showed that the relationship between peak vertical stress and pillar width is unimodal and bimodal. Specifically, both 5 and 10 m wide pillars showed a unimodal stress-width correlation and the peak vertical stresses are all located at the pillar center, whereas 15 m wide pillar has a bimodal stress-width relationship. In comparison, 10 m wide pillar holds the maximum in-situ stress. In consideration of site conditions and economic influences, 6 m wide coal strip coal pillar is designed at the working face 311102. As a result, stopping was successfully completed, and remarkable economic benefits were achieved.


2021 ◽  
Author(s):  
Yanhui Han ◽  
Shengli Chen ◽  
Younane Abousleiman

Abstract In wellbore drilling, the drilling mud density needs to be carefully selected such that the mud pressure inside the wellbore will not exceed formation breakdown pressure to avoid wellbore fracturing and extensive mud losses. However, in the hydraulic fracturing treatment, the lesser the value of the formation breakdown pressure the more optimal is the operation. We found out in this study that the pumping schedule (e.g., pumping duration and pumping rate) are factors in optimizing the breakdown pressure. In addition, this work investigates the effects of the finite length between packers on the magnitude of the breakdown pressure in various geological formations. The time-dependent evolving stresses around the wellbore are solved in the framework of time-dependent poroelasticity theory. The breakdown pressure is predicted from the evolution of the circumferential effective stresses. The effects of injection rate, formation properties, borehole diameter and length, and pumping duration on the breakdown pressure are presented in the form of engineering charts, for representative in-situ stress.


Sign in / Sign up

Export Citation Format

Share Document