scholarly journals The Evaporation Estimation on Lake Most

2021 ◽  
Vol 4 (1) ◽  
pp. 221-231
Author(s):  
Dagmar Dlouhá ◽  
Viktor Dubovský ◽  
Lukáš Pospíšil

Abstract After finishing the mining process, the best way to deal with the residual of open-cut coal mines in the north-western region of the Czech Republic has been proposed to be hydric recultivation. The area of our study is the first artificial Lake Most (formerly known as Ležáky-Most coal quarry) finished in 2014 and opened to the public in 2020 for recreational purposes. Since the lake is a closed system without natural inflow and outflow, the prediction of evaporation plays a crucial role in the securitization of long-term sustainability based on the capability of keeping the stable level of a dimension of the final water level. In this paper, we use the historical data consisting of the altitude of the lake level, its area, the perimeter of the shoreline, and especially the volume of refilled water. These data are compared against the computational methods; namely, the Penman-Monteith Equation and Hargreaves-Samani model calibrated by the method proposed in our previous work.

Author(s):  
Judit Knézy

This study is based on a nationwide questionnaire of national Faluszövetség (Assotiation of Villages) on the region general conditions conducted in 1921 and 1925, and it compares the public administration, legal, intellectual and communal state of three settlements in the north-Western region of zselic in Somogy County: Kadarkút, Bárdudvar-nok, Hedrehely. it also gives the readers a picture of the region level of farming techniques and the relation to other settlements of the three villages, the local conditions of fai-res and pastures, main agricultural methods. it also examines the farming land and living ground distributions and prices of houses and field. The source is saved in Archiv of the original scrifts in the Hungarian Agricultural Museum as heritage of dr Antal Bodor.


2018 ◽  
Vol 40 (2) ◽  
pp. 63-85 ◽  
Author(s):  
L. Shumlyanskyy ◽  
L. Stepanyuk ◽  
S. Claesson ◽  
K. Rudenko ◽  
A. Bekker

2016 ◽  
Vol 10 (1) ◽  
pp. 49-55 ◽  
Author(s):  
Aliyu Muhammad ◽  
Mohammed Ibrahim ◽  
Ochuko Erukainure ◽  
Nathan Habila ◽  
Aimola Idowu ◽  
...  

BMJ ◽  
1989 ◽  
Vol 298 (6685) ◽  
pp. 1432-1434 ◽  
Author(s):  
H. Reeve ◽  
A. Bowman

Starinar ◽  
2015 ◽  
pp. 197-220
Author(s):  
Nadezda Gavrilovic-Vitas ◽  
Bojan Popovic

During June and July 2014, at the site of Zadruzni Dom in Skelani, archaeological investigations of the late antique building were carried out, whose rooms were first discovered in the course of archaeological excavations in 2008. The building has a rectangular base, of a northeast-southwest orientation, with the discovered part measuring 20.90 x 30.90 m. What is distinguishable within the asymmetrical base is an entrance, along with eleven rooms, two of which have apses, and a peristyle, i.e. an inner courtyard with a roofed corridor surrounding it which connects all the rooms of the building. During the archaeological excavations, entrance thresholds and extremely well preserved mortar floors with mortar skirting were noted in most rooms, along with traces of fresco painting on the walls and mosaic floors, executed in the opus tesselatum technique, observed in several rooms, the peristyle and the encompassing corridor. The discovered mosaic fragments are decorated with geometric motifs in the form of a swastika, a Solomon?s knot, a square, a rhomboid, overlapping circles, etc. and floral motifs of ivy and petals, as well as a double braid motif. Small but, unfortunately, fragmented pieces of a mosaic with a figural representation were discovered in the central part of the peristyle, while the mosaic in room K was decorated with a motif portraying the winged head of Medusa. Two construction phases were noted, an older and a younger, with the walls, which were two Roman feet wide and built from dressed stone, and the older mortar floor belonging to the older construction phase, and the second, younger construction phase comprising mosaics, fresco painting, the younger mortar floor and two furnaces. Contemplating the planimetry of the building, one gets the impression of the rooms being divided between two parts - public and private, whereby the public part of the building would be located near the main entrance hall and would comprise rooms A, B, C, D and F, with mortar floors and traces of fresco painting on the walls. The other, possibly private, part of the building would include five rooms G, H, I, J and K and the inner courtyard. Rooms I, J and K had floor and wall heating, while rooms G and H had an arched apse and possibly functioned as a reception hall and/or a stibadium. The hallway with mosaics, which flanks the inner courtyard, was most likely roofed. Traces of burning in the north-western corridor testify to the destruction of the building in a fire. Based on the architectural elements and the traces of fresco painting and mosaics in the building at the site of Zadruzni Dom in Skelani, it can be deduced that this is a late antique building which can roughly be dated to the period between the end of the 3rd and the mid-4th century AD, and whose lavish decoration implies that it was owned by an affluent resident of Skelani from the aforementioned period.


2020 ◽  
Vol V (4) ◽  
pp. 214-216
Author(s):  
B. I. Vorotynsky

- The Ministry of Internal Affairs for the Medical Department is included in the State Council with a presentation on borrowing from the capital of public funds the amounts necessary for the construction of District Hospitals for the mentally ill. These sums will also be used to build the District Hospital in Vilnius, designed for the provinces of the north-western region.


Author(s):  
Martin Vyklický

This article essentially covers in more detail the consequences of the present wording of the Public Contract Law for purchase of scientific appliances in the Czech Republic. The beginning of the article deals with increasing public expenses in research; then, the problem is defined concerning unsuitable wording of certain provisions of the Public Contract Law; while subsequently, the solution for the problem is searched together with the final comments. Investing of public funds into science and research is probably the most efficient in a long-term horizon. However, the flow of funds for acquisition of scientific and research equipment should be supported by appropriate legislation with such wording and form not to prevent purchases of that equipment. Availability of public funds for something which in fact cannot be, due to wrongly set legislation, acquired by a contracting authority is the problem which must be eliminated through timely implementation of the above proposed changes in the Public Contract Law.


Sign in / Sign up

Export Citation Format

Share Document