scholarly journals Miquel Rodrigo Alsina: Theorist on journalism, intercultural communication and news construction process

2008 ◽  
Vol 4 (1) ◽  
pp. 44-52
Author(s):  
Adriana Santana ◽  
João Carlos Correia
2018 ◽  
Vol 41 ◽  
pp. 02002 ◽  
Author(s):  
Marcus Hackel ◽  
Andrea Gaube ◽  
MA Sabrina Lampe

The duties of German architects include the indepth design process as well as a thorough quality supervision during the construction process with the goal of the “build success“. They are reflected in the “Hands on Projects” organized by German Universities. The best results and broadest findings come out of international and interdisciplinary cooperation and projects with participants coming from the diverse cultural background and even integrating refugees into these projects. Students get in touch with different philosophies, attitudes, values, and approaches. They learn about intercultural communication and develop unique solutions. Different social and cultural background leads to different behavior. Not being aware of the cultural differences may lead to misunderstanding and irritation. Analysing the cause of these misunderstandings and getting knowledge about the cultural influence on architectural planning, communication and problem solving is one of the mayors tasks of these intercultural and interdisciplinary projects. Two case studies from Thailand and Germany published in this paper show different experiences with intercultural and interdisciplinary “Hands on Projects”.


Author(s):  
Edward C. Stewart ◽  
Jack Danielian ◽  
Robert J. Foster

2013 ◽  
Author(s):  
Vida Gudzinskiene ◽  
Asta Januskeviciute ◽  
Neringa Kurpakaitiene

2019 ◽  
Vol 2 (5) ◽  
Author(s):  
Tong Wang

The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefore, real-time, comprehensive, rapid and accurate prediction of construction compaction quality through informatization detection method is an important guarantee for speeding up construction progress and ensuring subgrade compaction quality. Based on the function of the system, this paper puts forward the principle of system development and the development mode used in system development, and displays the development system in real-time to achieve the whole process control of subgrade construction quality.


The issues of determining the estimated cost of capital construction projects with the involvement of Federal budget funds at the stage of development of project documentation, during verification of the accuracy of determining the estimated cost and the initial (maximum) contract price are considered. On the basis of the assessment of amendments to urban planning legislation for the purpose of implementing a state contract by the contractor ( based on the results of competitive procedures or without competitive procedures by decision of state authorities), the procedure for forming the estimate as part of a state (municipal) contract, the price of which is firm, is presented. For the purpose of mutual settlements between the customer and the contractor for the work performed, the formation of primary accounting documentation, as well as for checking the work performed by regulatory authorities, an example of drawing up an estimate of the state (municipal) contract on the basis of grouping costs according to structural elements and complexes of work is given. The result of the research conducted was the development of regulations and the formation of criteria for their practical application by state bodies, institutions, organizations and other participants in the investment-construction process, as well as recipients of budget funds, who perform the functions of the state (municipal) customer, developer and technical customer.


Sign in / Sign up

Export Citation Format

Share Document