scholarly journals Analysis on Construction Technology Management Strategy of Power Transmission Line

2019 ◽  
Vol 4 (1) ◽  
pp. 10-12
Author(s):  
Guizhu Song ◽  

with the rapid development of economy, people's demand for electric power is increasing, and the number of electrical equipment is gradually increasing, and the technical requirements are also gradually increasing, which also brings challenges to transmission lines. Strengthen the construction technology and management specification of transmission line, formulate construction scheme and measures according to different terrain, terrain and specific situation, and operate efficiently and strengthen management.

Transmission system is a crucial system in electrical power since the system transmit the electricity from power generation to consumer load. According to World Bank, the power losses from transmission lines are rapidly increasing from year to year at the rate of 3.85% in the year of 2013 to 5.792% in 2014. Losses in transmission system are most likely from power quality problems such as transients. Transients are the outcome of high unexpected increment in voltage or current surge magnitudes. The peak values of both voltages and current are usually more than twice of that normal voltage and current amplitudes. The surges due to transients can vitally cause power system failure and breakdown of electrical equipment especially at the substations. There were few known transient overcurrent and overvoltage problems, which are due to faults, lightning and line energizing, respectively. This research work mainly focuses on simulating transients for 500 kV transmission system which employ Sarawak as the case study location. Sarawak currently has main 275 kV transmission line covering the whole Sarawak from Miri to Kuching known as Sarawak backbone, but due to lots of industries and rapid development and urbanization boom in Sarawak, there is a planned of 500 kV transmission line as a backup if the 275 kV transmission line proves inadequate. In Sarawak, the 500 kV is planned to be energized at 275 kV. But, in fact this work is for that transmission line to be operated at 500 kV, hence, monitoring the highest transient may occur. The results revealed that lightning and three-phase faults of 1.0 s fault time duration cause the highest change in amplitude of current on the line up to 9.06 pu and 9.27 pu, respectively. The highest lightning amplitude is observed when lightning was simulated at the receiving end of the line which is near to the Tada substation.


Energies ◽  
2021 ◽  
Vol 14 (6) ◽  
pp. 1561
Author(s):  
Hao Chen ◽  
Zhongnan Qian ◽  
Chengyin Liu ◽  
Jiande Wu ◽  
Wuhua Li ◽  
...  

Current measurement is a key part of the monitoring system for power transmission lines. Compared with the conventional current sensor, the distributed, self-powered and contactless current sensor has great advantages of safety and reliability. By integrating the current sensing function and the energy harvesting function of current transformer (CT), a time-multiplexed self-powered wireless sensor that can measure the power transmission line current is presented in this paper. Two operating modes of CT, including current sensing mode and energy harvesting mode, are analyzed in detail. Through the design of mode-switching circuit, harvesting circuit and measurement circuit are isolated using only one CT secondary coil, which eliminates the interference between energy harvesting and current measurement. Thus, the accurate measurement in the current sensing mode and the maximum energy collection in the energy harvesting mode are both realized, all of which simplify the online power transmission line monitoring. The designed time-multiplexed working mode allows the sensor to work at a lower transmission line current, at the expense of a lower working frequency. Finally, the proposed sensor is verified by experiments.


2021 ◽  
Author(s):  
Sergey Goremykin

The textbook describes the main issues of the theory of relay protection and automation of electric power systems. The structure and functional purpose of protection devices and automation of power transmission lines of various configurations, synchronous generators, power transformers, electric motors and individual electrical installations are considered. For each of the types of protection of the above objects, the structure, the principle of operation, the order of selection of settings are given, the advantages and disadvantages are evaluated, indicating the scope of application. The manual includes material on complete devices based on semiconductor and microprocessor element bases. The progressive use of such devices (protection of the third and fourth generations) is appropriate and effective due to their significant advantages. Meets the requirements of the federal state educational standards of higher education of the latest generation. It is intended for students in the areas of training 13.03.02 "Electric power and electrical engineering" (profile "Power supply", discipline "Relay protection and automation of electric power systems") and 35.03.06 "Agroengineering" (profile "Power supply and electrical equipment of agricultural enterprises", discipline "Relay protection of electrical equipment of agricultural objects"), as well as for graduate students and specialists engaged in the field of electrification and automation of industrial and agrotechnical objects.


Author(s):  
Guanghong Tao ◽  
Lijin Fang

Purpose The purpose of this paper is to introduce a robot mechanism designed for power transmission line inspection. The focus for this design is on obstacle-crossing ability with a goal to create a robot moving and crossing obstacle on not only the straight line but also the steering line. Design/methodology/approach A novel four-unit tri-arm serial robot mechanism is proposed. Every novel unit designed for pitching motion is based on parallelogram structure, which is driven by cables and only one motor. There is gripper-wheel compounding mechanism mounted on the arm. The prototype and obstacle environments are established, and the obstacle-crossing experiments are conducted. Findings The novel unit mechanism and robot prototype have been tested in the lab. The prototype has demonstrated the obstacle-crossing ability when moving and crossing fundamental obstacles on the line. The experimental results show that the robot mechanism meets the obstacle-crossing requirements. Practical implications The novel robot technology can be used for defect inspection of power transmission line by power companies. Social implications It stands to lower the intense and risk of inspection works and reduce the costs related to inspection. Originality/value Innovative features include its architecture, mobility and driving method.


2017 ◽  
Vol 40 (11) ◽  
pp. 3273-3292 ◽  
Author(s):  
Vikram Banthia ◽  
Yaser Maddahi ◽  
Kourosh Zareinia ◽  
Stephen Liao ◽  
Tim Olson ◽  
...  

This paper reports technical design of a novel experimental test facility, using haptic-enabled teleoperation of robotic manipulators, for live transmission line maintenance. The goal is to study and develop appropriate techniques in repair overhead power transmission lines by allowing linemen to wirelessly guide a remote manipulator, installed on a crane bucket, to execute dexterous maintenance tasks, such as twisting a tie wire around a cable. Challenges and solutions for developing such a system are outlined. The test facility consists of a PHANToM Desktop haptic device (master site), an industrial hydraulic manipulator (slave site) mounted atop a Stewart platform, and a wireless communication channel connecting the master and slave sites. The teleoperated system is tested under different force feedback schemes, while the base is excited and the communication channel is delayed and/or lossy to emulate realistic network behaviors. The force feedback schemes are: virtual fixture, augmentation force and augmented virtual fixture. Performance of each scheme is evaluated under three measures: task completion time, number of failed trials and displacement of the slave manipulator end-effector. The developed test rig has been shown to be successful in performing haptic-enabled teleoperation for live-line maintenance in a laboratory setting. The authors aim at establishing a benchmark test facility for objective evaluation of ideas and concepts in the teleoperation of live-line maintenance tasks.


2011 ◽  
Vol 21 (08) ◽  
pp. 2147-2159 ◽  
Author(s):  
NIKOS LAZARIDES ◽  
VASSILIS PALTOGLOU ◽  
G. P. TSIRONIS

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent capacitance. Extended numerical simulations reveal that power transmission along the array is also possible in other than the linear frequency bands, which are located close to the nonlinear resonances of a single nonlinear RLC circuit. Moreover, the effectiveness of power transmission for driving frequencies in the nonlinear bands is comparable to that in the linear band. Power transmission in the nonlinear bands occurs through the linear modes of the system, and it is closely related to the instability of a mode that is localized at the driven site.


Author(s):  
Ngo Minh Khoa ◽  
Nguyen Huu Hieu ◽  
Dinh Thanh Viet

<p>This paper focuses on analyzing and evaluating impact of a Static Var Compensator (SVC) on the measured impedance at distance protection relay location on power transmission lines. The measured impedance at the relay location when a fault occurs on the line is determined by using voltage and current signals from voltage and current transformers at the relay and the type of fault occurred on the line. The MHO characteristic is applied to analyze impact of SVC on the distance protection relay. Based on the theory, the authors in this paper develop a simulation program on Matlab/Simulink software to analyze impact of SVC on the distance protection relay. In the power system model, it is supposed that the SVC is located at mid-point of the transmission line to study impact of SVC on the distance relay. The simulation results show that SVC will impact on the measured impedance at the relay when the fault occurs after the location of the SVC on the power transmission line.</p>


2021 ◽  
Vol 3 (1) ◽  
pp. 36-48
Author(s):  
Bindhu V ◽  
Ranganathan G

Fault detection in the transmission is a challenging task when examining the accuracy of the system. This fault can be caused by a man-made force or by using concurrent overvoltage in the power distribution line. This research focuses on two sections to handle the power transmission line problem and can be rectified as previously stated. An intelligent approach is utilized for monitoring and controlling line faults in order to improve the accuracy of the equipment in transmission line fault detection. After several iterations of the procedure, the combination of line and master unit improves the system's accuracy and reliability. The master unit identifies faulty poles in the network based on the variation of current and voltage of each node and calculates the distance between the station and the faulty node to reduce manual effort. In the proposed work, many sensors are used to detect the line fault in a network by placing the appropriate point. The pure information can be transferred to an authorized person or unit after many iterations due to knowledgeable devices. The faulty status of the pole information is displayed in the control unit by a display unit comprised of an alarm unit to alert the corresponding section using ZigBee techniques. The GSM unit provides the faulty status of an authorized person to rectify the problems immediately which further improve the reliability of the system. When compared to existing methods, our hybrid proposed method achieves a higher accuracy of 90%. This method aids to reduce the labor costs gradually to visit all-pole points instead of faulty pole points and thereby increasing the reliability of the electrical consumers.