scholarly journals Pengembangan dan Validasi Rancang Bangun Sistem Informasi Surat Elektronik Poliklinik Berbasis Website

2021 ◽  
Vol 6 (2) ◽  
pp. 175
Author(s):  
Muttaqin Kholis Ali

Polyclinic at State University of Padang is one of technical services unit or UPT that still uses manual system for documenting medical records and administration. The purpose of this project is to make a design about information system in polyclinic at State University of Padang. It will be an effective project for many activities and also for a process of health services, so that, all of activities in Polyclinic will being computerized. Beside of that, this system also uses online system that will help the patient in the clinic to get good services easily. The system of this design uses a PHP's programming language with Framework Codeigniter. Moreover, the design of this information system in the clinic also uses Relational Database Management System (RDBMS) MySQL. Designing and Planning this project uses Bootstrap CSS Framework that functioning to make the system more dynamist and responsive. The output of this project in the clinic at State University of Padang is a system that will fulfill the requirements of health services by an online system. And for an employee, this system is useful to make a monthly or yearly report, so that their job will be easier than before. However, the designing and planning of information systems in that clinic still needing a development in many aspects to get the maximum result. The development of this project will include such as a system or even the people around the clinic at State University of Padang.

2021 ◽  
pp. 47-78
Author(s):  
Jagdish Chandra Patni ◽  
Hitesh Kumar Sharma ◽  
Ravi Tomar ◽  
Avita Katal

2017 ◽  
pp. 1-6
Author(s):  
Richard Mansour ◽  
Samip Master

Purpose Quality measurement and improvement is a focus of ASCO. In the era of electronic health records (EHRs), computerized order entry, and medication administration records, quality monitoring can be an automated process. The EHR data are usually stored within tables in a relational database management system. ASCO Quality Oncology Practice Initiative measure NHL78a (hepatitis B virus antigen test and hepatitis B core antibody test within 3 months before initiation of obinutuzumab, ofatumumab, or rituximab for patients with non-Hodgkin lymphoma) presents an opportunity for automation of a quality measure using existing data in the EHR. Methods We used a locally developed Structured Query Language (SQL) language procedure in the Microsoft SQL Query Manager to access the EPIC CLARITY database. Access to the relational database management system of the EHR permits rapid case identification (the denominator set) of the unique ID of all of the patients who have received one of the target medications (ie, obinutuzumab, ofatumumab, or rituximab). Then, we went through a six-step process to find the number of patients who passed or failed the quality measure. Results When the final SQL procedure executes, it takes < 5 seconds to see the result set for a 12-month period. The procedure can be changed to incorporate a desired date range. Once the SQL procedure is created, there is essentially no labor and low costs to run the procedure at specific time intervals. Conclusion Our method of quality measurement using EHRs is cost effective, fast, and precise, and can be reproduced at other centers.


Author(s):  
Derrick J. Neufeld ◽  
Scott Griffith

Isobord, a start-up company that is setting up a new strawboard production plant in Manitoba, Canada, is facing critical operational problems that threaten its future. Isobord’s product is a high quality particleboard substitute that uses straw, rather than wood, as the main raw manufacturing material. To achieve viability, Isobord must develop processes to carefully coordinate and manage its straw baling, stacking and hauling operations. Through effective information systems, Isobord has the potential to reduce the amount of equipment it needs to purchase to meet straw harvest requirements. A small investment in optimization technology could yield considerable cost savings if the efficiency of capital equipment can be improved. A geographic information system (GIS) / relational database management system (RDBMS) solution is being explored, but budget and time constraints, as well as organizational inexperience, seriously threaten the project. An information technology decision must be made immediately if there is to be any hope of implementing technology to manage the first year’s straw harvest.


Sign in / Sign up

Export Citation Format

Share Document