scholarly journals Analysis of Internal Force in Construction of Asymmetric Continuous Rigid Frame Bridge

Author(s):  
Aimin Zhang ◽  
Huijun Wu
Author(s):  
Ying hua Li ◽  
Ke sheng Peng ◽  
Lu rong Cai ◽  
Jun yong He

Abstract: In general, the material properties, loads, resistance of the prestressed concrete continuous rigid frame bridge in different construction stages are time-varying. So, it is essential to monitor the internal force state when the bridge is in construction. Among them, how to assess the safety is one of the challenges. As the continuous monitoring over a long-term period can increase the reliability of the assessment, so, based on a large number of monitored strain data collected from the structural health monitoring system (SHMS) during construction, a calculation method of the punctiform time-varying reliability is proposed in this paper to evaluate the stress state of this type bridge in cantilever construction stage by using the basic reliability theory. At the same time, the optimal stress distribution function in the bridge mid-span base plate is determined when the bridge is closed. This method can provide basis and direction for the internal force control of this type bridge in construction process. So, it can reduce the bridge safety and quality accidents in construction stages.


2012 ◽  
Vol 446-449 ◽  
pp. 1067-1070
Author(s):  
Rong Xia Wang ◽  
Xiang Shang Chen ◽  
Fan Li ◽  
Shao Wei Zhao

The continuous rigid frame bridge has been applied widely in our country. But in recent years, over-deflection of beam in this bridge has become an serious problem. This may cause the redistribution of displacement and internal force of the whole structure, especially in dynamic load status. A two-dimensional pile-soil-bridge model is built up in ANSYS based on a factual bridge. The over-deflection is considered as the decrease of beam elastic modulus or rigidity. The displacement and internal force of key parts are analysed in static and dynamic vehicle load. The study shows that over-deflection will reduce the first three natural vibration frequency, weaken the sensitivity of bridge to dynamic load. In dynamic load status, the displacement and internal force will be influenced by beam rigidity.


2011 ◽  
Vol 255-260 ◽  
pp. 1120-1124
Author(s):  
Dong Lian Tan ◽  
Deng Ke Wang ◽  
Wen Ru Lu ◽  
Long Zhang ◽  
Xin Yuan Lin

The choice of closure order of long span prestressed concrete continuous rigid frame bridge is the key part on its construction procedure, which has a big influence on the gross force and alignent of the whole structure. On the Basis of the Hanjiang bridge, the paper studies the closure order of long span prestressed concrete continuous rigid frame bridge and its system transformation procedure as well as the effect of jacking force etc. It shows that the technique of the midspan and the sidespan close at the same time not only meets the requirement of allowable internal force, but also has the benefit of shorten the construction period as well as reducing the degree of construction difficulty.


2014 ◽  
Vol 1030-1032 ◽  
pp. 750-753
Author(s):  
Hua Su

Accurate simulation of construction process of continuous rigid frame bridge is a foundation to make a bridge built accurately. Based on the suit iteration method, this paper used MIDAS to built a 3D finite elements model, the internal force and deformation results of each construction stage was obtained. This study provided a good theoretical reference for the control of long-span continuous rigid frame bridge construction..


2010 ◽  
Vol 163-167 ◽  
pp. 1744-1748
Author(s):  
Zhi Fang Lu ◽  
Mu Yu Liu

Shrinkage and creep are the inherent properties of concrete bridge. According to Latin Hypercube Sampling method (LHS) and concrete bridge shrinkage and creep uncertainty parameters, this paper promotes stochastic finite element method based on LHS for concrete bridge shrinkage and creep uncertainty analysis in ANSYS random analysis model. Based on this stochastic finite element method, internal force and long-term deformation of a continuous rigid frame bridge with density gradient concrete is analyzed. Result show, internal force and deformation of continuous rigid frame bridge after completing are reasonable and satisfy Code requirement, and are various in previous 3 years at service stage and trend to steadily after 3 years. Research result provides theoretical basis for shrinkage and creep uncertainty further analysis in concrete bridge.


2021 ◽  
pp. 127571
Author(s):  
Yong Zeng ◽  
Yutong Zeng ◽  
Dong Jiang ◽  
Shanhong Liu ◽  
Hongmei Tan ◽  
...  

2014 ◽  
Vol 587-589 ◽  
pp. 1637-1641
Author(s):  
Yao Cui ◽  
We Nang Hou ◽  
Fei Ying Liu

Under the condition of the deep water reservoir area, the choice of bridge pier and long span continuous rigid frame beam construction methods are quite various. And the analysis of destruction of bridge depends mostly on the beam and piers. The paper cares mostly about these two parts.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Kexin Zhang ◽  
Tianyu Qi ◽  
Dachao Li ◽  
Xingwei Xue ◽  
Zhimin Zhu

PurposeThe paper aims to investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening, and health monitoring after reinforcement were carried out. The results of concrete strain and deflection show that the flexural strength and stiffness of the strengthened beam are improved.Design/methodology/approachThis paper describes prestressed steel strand as a way to strengthen a 25-year-old continuous rigid frame bridge. High strength, low relaxation steel strand with high tensile strain and good corrosion resistance were used in this reinforcement. The construction process for strengthening with prestressed steel strand and steel plate was described. Ultimate bearing capacity of the bridge after strengthening was discussed based on finite element model.FindingsThe cumulative upward deflection of the second span the third span was 39.7 mm, which is basically consistent with the theoretical value, and the measured value is smaller than the theoretical value. The deflection value of the second span during data acquisition was −20 mm–10 mm, which does not exceed the maximum deflection value of live load, and the deflection of the bridge is in a safe state during normal use. Thus, this strengthened way with prestressed steel wire rope is feasible and effective.Originality/valueThis paper describes prestressed steel strand as a way to strengthen a 25-year-old continuous rigid frame bridge. To investigate effectiveness of the strengthening method, the construction process monitoring, fielding-load tests before and after strengthening and health monitoring after reinforcement were carried out.