scholarly journals Optimalisasi Koordinasi Relay Arus Lebih Kapal Bulk Carrier 50.000 DWT(Dead Weight Ton) Menggunakan Metode Genetic Algorithm

CYCLOTRON ◽  
2019 ◽  
Vol 2 (2) ◽  
Author(s):  
Rahim Atmanegara ◽  
Istiyo Winarno ◽  
Iradiratu DPK ◽  
Daeng Rahmatullah

Abstrak— Koordinasi sistem pengaman sangat diperlukan dalam mengatasi gangguan yang terjadi pada sistem tenaga listrik, sehingga gangguan-gangguan yang terjadi dapat diatasi dari sistem yang sedang berjalan. Begitu juga dengan keamanan pada sistem kelistrikan pada Kapal Bulk Carrier 50.000 DWT (Dead weight Ton) dibutuhkan koordinasi sistem pengamanan yang tepat. Dengan mengaplikasikan prinsip koordinasi relay, maka urutan kerja peralatan pengaman sepanjang saluran dari sumber sampai pada beban harus diperhatikan. Koordinasi relay ini mencakup dari main switch board power supply sampai distribusi panel (pembebanan) dan perhitungan yang di ambil mulai dari kabel, relay, kapasitas relay, dan pembebanan dimulai dari main switch board sampai ke beban. Setelah dilakukan perhitungan yang tepat selanjutnya  peneliti menggunakan metode Genetic Algorithm untuk mengoptimalkan koordinasi relay arus lebih tersebut. Dengan metode Genetic Algorithm didapatkan nilai setting TMS (Time Multiplier Setting) pada relay 1 = 0,9 s, T = 1,76 s, Ip = 162,14 A, I set Pickup = 0,23 A, I set Definite = 1,1 A, pada relay 2 Tms = 1,1 s, T = 1,69 s, Ip = 130,57 A, I set Pickup = 2,9 A, I set Definite = 16,86 A, pada relay 3 Tms = 0,31 s, T = 0,39 s, Ip = 109,25 A, I set Pickup = 2,42 A, I set Definite = 16,61 A. Adapun software yang digunakan adalah Matlab (R2009b) dan ETAP 12. Dengan menambahkan metode tersebut pada penelitian ini, diharapkan koordinasi relay arus lebih akan menjadi lebih optimal.Kata kunci: relay arus lebih, Genetic Algorithm, koordinasi relayAbstract— Security system coordination is very important to solve any trouble in electrical power system, That’s trouble can be solved from the system have been working, So That’s why to security electrical power system in Bulk Carrier ship with 50.000 Dead Weight Ton must be requiring a good coordination security system appropriate. By applying principle relay coordination, so the work step which of security equipment channels from the source until electrical load must be controlled. The relay Coordination is include from main switch board power supply until distribution panel and It’s  need calculation from wire,  relay, relay capacity, and the loading have took from main switch board until load. Researcher will be using genetic algorithm method after all Calculation has been done which for optimization overcurrent relay coordination. By using Genetic Algorithm method be obtained value of TMS (Time multiplier Setting) in relay 1= 0,9 s, T = 1,76 s, Ip = 162,14 A, I set Pickup = 0,23 A, I set Definite = 1,1 A, and in the Relay 2 Tms = 1,1 s, T = 1,69 s, Ip = 130,57 A, I set Pickup = 2,9 A, I set Definite = 16,86 A, in relay 3 Tms = 0,31 s, T = 0,39 s, Ip = 109,25 A, I set Pickup = 2,42 A, I set Definite = 16,61 A. The software will be used in this research is Mathlab R2009B software and Electrical Transient Analyzer Program. By using that’s method it might the relay coordination will be optimal.Keywords: Overcurrent Relay, Genetic Algorithm (GA), Relay Coordination

1989 ◽  
Vol 7 (5) ◽  
pp. 328-336
Author(s):  
David Denny

The downtrend in electrical output, 10-14% 1977-79 to 6% 1979-84, was reversed to 7.4% between 1980 and 1987 when 35,000 Mw of capacity was added, transmission networks were expanded and regional grids linked. Part of this success arose from policies that replaced a monolithic system of bureaucratic planning to involvement of local interests and decentralization. Chinese organizations have also been able to take advantage of foreign technology and investment. Nevertheless, industrial output only reached 75-80% of its potential due to inadequate electric power supply.


Author(s):  
Maja Lundbäck ◽  
Mattias Karlsson

The electrical disturbance in Forsmark 2006 [3] led to increased attention being paid to the power supplies of nuclear power plants and their role in safety system reliability, both nationally and internationally. Since then numerous disturbances similar in nature have occurred in the electrical power supply which raises questions whether best available technology (BAT) has been utilised in the design and analysis of the electrical power supply of the safety functions of nuclear facilities. On repeated occasions this type of disturbances has had an impact on redundant parts of several safety systems due to functional dependencies between these. The frequency of these occurrences has been unexpected. The Swedish Radiation Safety Authority (SSM) has decided to write this document to clarify the regulators position on this issue. The document is also intended to support SSM:s assessments and evaluations of the Licensees efforts regarding degraded power supplies. An assessment of nuclear power plant electrical power systems is necessary in the light of the past years’ operational experience [1–7], where disturbances in the electrical power supply on repeated occasions have caused a power supply with degradation severe enough to challenge plant safety. As the potential consequences of such a degraded power supply can be severe it must be proven that the frequency of such occurrences is tolerably low. Furthermore, it is important to consider experiences from known situations with degraded power supplies, to enable a reasonable approach to identify and take counter-measures based on the root-cause and ensure utilisation of best available technology. A sufficient approach to enable prevention, protection and mitigation against this type of disturbances has been difficult to identify. Actual events and conditions causing a degraded power supply have often been complex in nature and difficult to anticipate, wherefore events and conditions which has not yet occurred are difficult to foresee. For this reason it is deemed most effective to identify and implement proportional measures that enhances the independence of the power supplies, such that a degraded power supply with a higher reliability is prevented from propagating to multiple parts of the safety systems. In this memorandum, SSM describes a state-based approach to analysing electrical power system functionality in different states of degraded power supply. The approach is intended to identify potential design weaknesses and measures to enhance robustness. Such an approach is viewed as more favourable in facilitating the identification of such measures, which may otherwise be neglected due to an estimated low frequency of occurrence, or missed due to incomplete identification of possible events and conditions. Furthermore this document describes how an assessment of electrical power system design can be performed, where the lowest common denominator from operational experience e.g. [1–7] is identified and counteracted. Actual occurrences of degraded power supplies, which all have been “unknown during the event identification process” but “well-known electrical phenomena”, can be described as unidentified degrading conductive disturbances.


2021 ◽  
Vol 16 ◽  
pp. 21-42
Author(s):  
Constâncio António Pinto ◽  
José Torres Farinha ◽  
Sarbjeet Singh

The energy power supply infrastructure of a hospital, to function correctly, needs to be well maintained to ensure its reliability and, by consequence, the maximum integrated availability. In this paper, the authors propose the use of Petri Nets to help the improvement of the electric power system reliability, having as a case study a big European Hospital. The purpose of the research is to identify and analyse the potential failures of the system and to suggest solutions to improve the operations and maintenance to maximise the availability and reliability of those assets through possible and objective answers. It was necessary to develop a diagnosis and planning methodology to assess the reliability of several components of the energy power supply system. It is dynamic modelling based on a block diagram of the system and transposed to representation by Petri Nets. The analysis and the simulation of the discrete events of the system, as well as the visualisation of the process functioning and the communications inside, was made. Additionally, they were referred to other approaches, like the Fuzzy Petri Nets and Stochastic Petri Nets, as well as a future balance about its application in a situation like the analysed in this paper


2019 ◽  
Vol 115 ◽  
pp. 02002
Author(s):  
Wang Geng

After the Fukushima nuclear accident, the reliability requirements for Nuclear Power Plant (NPP) safety systems have been further improved worldwide. Therefore, it is necessary to provide a safe, reliable and economical scheme of the power supply system to cope with the abnormal conditions. Based on the reliability of the power supply of the 3rd generations of NPPs and combined with the application of the defend in depth concept in the electrical system, this paper provides a brief introduction of the typical 3rd generation NPP electrical system in the following area: the configuration of the electrical power system, defence in depth principle of the power supply, the basic structure of electrical power system. On this basis, an optimal power supply scheme is proposed.