scholarly journals Simulation of Light Oil Production from Heterogeneous Reservoirs - Well Completion with Inflow Control Devices

Author(s):  
Arash Abbasi ◽  
Britt M. E. Moldestad
2021 ◽  
Author(s):  
Mohammad Soroush ◽  
Mahdi Mahmoudi ◽  
Morteza Roostaei ◽  
Hossein Izadi ◽  
Seyed Abolhassan Hosseini ◽  
...  

Abstract In wake of the biggest oil crash in history triggered by the COVID-19 pandemic; Western Canada in- situ production is under tremendous price pressure. Therefore, the operators may consider shut in the wells. Current investigation offers an insight into the effect of near-wellbore skin buildup because of such shut-in. A series of simulation studies was performed to quantitatively address the impact of well shut-in on the long-term performance of well, in particular on key performance indicators of the well including cumulative steam to oil ratio and cumulative oil production. The long-term shut-in contributes to three main modes of plugging: (1) near-wellbore pore plugging by clays and fines, (2) scaling, and (3) chemical consolidation induced by corrosion. A series of carefully designed simulations was also utilized to understand the potential of skin buildup in the near-wellbore region and within different sand control devices. The simulation results showed a higher sensitivity of well performance to shut-in for the wells in the initial stage of SAGD production. If the well is shut in during the first years, the total reduction in cumulative oil production is much higher compared to a well which is shut-in during late SAGD production life. As the induced skin due to shut-in increases, the ultimate cumulative oil production drops whose magnitude depends on well completion designs. The highest effect on the cumulative oil production is in the case of completion designs with flow control devices (liner deployed and tubing deployed completions). Therefore, wellbore hydraulics and completion design play key roles in the maintenance of uniform inflow profile, and the skin buildup due to shut-in poses a high risk of inflow problem and increases the risk of hot-spot development and steam breakthrough. This investigation offers a new understanding concerning the effect of shut-in and wellbore skin buildup on SAGD operation. It helps production and completion engineers to better understand and select candidate wells for shut-in and subsequently to minimize the skin buildup in wells.


2021 ◽  
Author(s):  
Timur Solovyev ◽  
Nikolay Mikhaylov

Abstract The complex interbedded heterogeneous reservoirs of the Severo-Komsomolskoye field are developed by horizontal wells in which, as part of the pilot project's scope, autonomous inflow control devices (AICD) are installed to prevent early coning and gas breakthroughs in long horizontal sections and reduce sand production, which is a problem aggravated by an extremely low mechanical strength of the terrigenous deposits occurring in the Pokur formation of the Cenomanian stage in this area. The zones produced through AICDs are separated by swell packers. The issue of AICD effectiveness is discussed in the publications by Solovyev (2019), Shestov (2015), Byakov (2019) and some others. One of the methods used for monitoring horizontal sections with AICDs is production logging (PLT). However, due to the complexity of logging objectives, the use of conventional logging techniques makes the PLT unfeasible, considering the costs of preparing and carrying out the downhole operations. This paper provides some case studies of the Through-Barrier Diagnostics application, including passive spectral acoustics (spectral acoustic logging) and thermohydrodynamic modelling for the purpose of effective estimation of reservoir flows behind the liner with AICDs installed and well integrity diagnostics. As a result of the performed diagnostics, the well completion strategy was updated and optimised according to the log interpretation results, and one well intervention involving a cement squeeze with a straddle-packer assembly was carried out.


2021 ◽  
Author(s):  
Pawan Agrawal ◽  
Sharifa Yousif ◽  
Ahmed Shokry ◽  
Talha Saqib ◽  
Osama Keshtta ◽  
...  

Abstract In a giant offshore UAE carbonate oil field, challenges related to advanced maturity, presence of a huge gas-cap and reservoir heterogeneities have impacted production performance. More than 30% of oil producers are closed due to gas front advance and this percentage is increasing with time. The viability of future developments is highly impacted by lower completion design and ways to limit gas breakthrough. Autonomous inflow-control devices (AICD's) are seen as a viable lower completion method to mitigate gas production while allowing oil production, but their effect on pressure drawdown must be carefully accounted for, in a context of particularly high export pressure. A first AICD completion was tested in 2020, after a careful selection amongst high-GOR wells and a diagnosis of underlying gas production mechanisms. The selected pilot is an open-hole horizontal drain closed due to high GOR. Its production profile was investigated through a baseline production log. Several AICD designs were simulated using a nodal analysis model to account for the export pressure. Reservoir simulation was used to evaluate the long-term performance of short-listed scenarios. The integrated process involved all disciplines, from geology, reservoir engineering, petrophysics, to petroleum and completion engineering. In the finally selected design, only the high-permeability heel part of the horizontal drain was covered by AICDs, whereas the rest was completed with pre-perforated liner intervals, separated with swell packers. It was considered that a balance between gas isolation and pressure draw-down reduction had to be found to ensure production viability for such pilot evaluation. Subsequent to the re-completion, the well could be produced at low GOR, and a second production log confirmed the effectiveness of AICDs in isolating free gas production, while enhancing healthy oil production from the deeper part of the drain. Continuous production monitoring, and other flow profile surveys, will complete the evaluation of AICD effectiveness and its adaptability to evolving pressure and fluid distribution within the reservoir. Several lessons will be learnt from this first AICD pilot, particularly related to the criticality of fully integrated subsurface understanding, evaluation, and completion design studies. The use of AICD technology appears promising for retrofit solutions in high-GOR inactive strings, prolonging well life and increasing reserves. Regarding newly drilled wells, dedicated efforts are underway to associate this technology with enhanced reservoir evaluation methods, allowing to directly design the lower completion based on diagnosed reservoir heterogeneities. Reduced export pressure and artificial lift will feature in future field development phases, and offer the flexibility to extend the use of AICD's. The current technology evaluation phases are however crucial in the definition of such technology deployments and the confirmation of their long-term viability.


2021 ◽  
Vol 5 (1) ◽  
pp. 119-131
Author(s):  
Frzan F. Ali ◽  
Maha R. Hamoudi ◽  
Akram H. Abdul Wahab

Water coning is the biggest production problem mechanism in Middle East oil fields, especially in the Kurdistan Region of Iraq. When water production starts to increase, the costs of operations increase. Water production from the coning phenomena results in a reduction in recovery factor from the reservoir. Understanding the key factors impacting this problem can lead to the implementation of efficient methods to prevent and mitigate water coning. The rate of success of any method relies mainly on the ability to identify the mechanism causing the water coning. This is because several reservoir parameters can affect water coning in both homogenous and heterogeneous reservoirs. The objective of this research is to identify the parameters contributing to water coning in both homogenous and heterogeneous reservoirs. A simulation model was created to demonstrate water coning in a single- vertical well in a radial cross-section model in a commercial reservoir simulator. The sensitivity analysis was conducted on a variety of properties separately for both homogenous and heterogeneous reservoirs. The results were categorized by time to water breakthrough, oil production rate and water oil ratio. The results of the simulation work led to a number of conclusions. Firstly, production rate, perforation interval thickness and perforation depth are the most effective parameters on water coning. Secondly, time of water breakthrough is not an adequate indicator on the economic performance of the well, as the water cut is also important. Thirdly, natural fractures have significant contribution on water coning, which leads to less oil production at the end of production time when compared to a conventional reservoir with similar properties.


2021 ◽  
Author(s):  
Soheila Taghavi ◽  
Ismarullizam Mohd Ismail ◽  
Haavard Aakre ◽  
Vidar Mathiesen

Abstract To increase the production and recovery of marginal, mature, and challenging oil reservoirs, developing new inflow control technologies is of great importance. In cases where production of surrounding reservoir fluids such as gas and water can cause negative effects on both the total oil recovery and the amounts of energy required to drain the reservoir, the multiphase flow performances of these technologies are of particular significance. In typical cases, a Long Horizontal Well (LHW) will eventually start producing increasing amounts of these fluids. This will cause the Water Cut (WC) and/or Gas Oil Ratio (GOR) to rise, ultimately forcing the well to be shut down even though there still are considerable amounts of oil left in the reservoir. In earlier cases, Inflow Control Devices (ICD) and Autonomous Inflow Control Devices (AICD) have proven to limit these challenges and increase the total recovery by balancing the influx along the well and delaying the breakthrough of gas and/or water. The Autonomous Inflow Control Valve (AICV) builds on these same principles, and in addition has the ability to autonomously close when breakthrough of unwanted gas and/or water occurs. This will even out the total drawdown in the well, allowing it to continue producing without the WC and/or GOR reaching inacceptable limits. As part of the qualification program of the light-oil AICV, extensive flow performance tests have been carried out in a multiphase flow loop test rig. The tests have been performed under realistic reservoir conditions with respect to variables such as pressure and temperature, with model oil, water, and gas at different WC's and GOR's. Conducting these multiphase experiments has been valuable in the process of establishing the AICV's multiphase flow behavior, and the results are presented and discussed in this paper. Single phase performance and a comparison with a conventional ICD are also presented. The results display that the AICV shows significantly better performance than the ICD, both for single and multiphase flow. A static reservoir modelling method have been used to evaluate the AICV performance in a light-oil reservoir. When compared to a screen-only completion and an ICD completion, the simulation shows that a completion with AICV's will outperform the above-mentioned completions with respect to WC and GOR behavior. A discussion on how this novel AICV can be utilized in marginal, mature, and other challenging reservoirs will be provided in the paper.


2009 ◽  
Vol 86 (2) ◽  
pp. 281-286 ◽  
Author(s):  
Nguyễn Anh Dũng ◽  
Raweewan Klaewkla ◽  
Sujitra Wongkasemjit ◽  
Sirirat Jitkarnka

2020 ◽  
Author(s):  
Fuziana Tusimin ◽  
Latief Riyanto ◽  
Norbaizurah Ahmad Tajuddin ◽  
Mojtaba Moradi ◽  
Raam Marimuthu ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document