A RULE BASED FUZZY SYNTHETIC EVALUATION METHOD FOR RISK ASSESSMENT IN PIPELINE TRANSPORT
Keyword(s):
Integrity Management Program (IMP) for oil and gas pipeline system demands a robust risk assessment method, which needs fully utilize the expert knowledge on the empirical data and the ambiguous cause(s) – effect(s) failure mechanism and then keep a good balance between precision and practicality. A new method, Rule Based Fuzzy Synthetic Evaluation (RB-FSE) which combines Fuzzy Synthetic Evaluation (FSE) with Fuzzy Logic (FLo) is proposed in this paper. It is applied to the pipeline risk assessment for Third-Party Damage (TPD). The proposed method is compared with scoring-type method in a case study. Results indicate that the relative assessment values from RB-FSE model could better support risk-ranking and decision-making in the IMP.
2019 ◽
Vol 658
◽
pp. 818-829
◽
2010 ◽
Vol 33
◽
pp. 351-355
◽
2014 ◽
Vol 530-531
◽
pp. 429-433
◽
Keyword(s):
2017 ◽
Vol 161
◽
pp. 977-990
◽
2014 ◽
Vol 519
◽
pp. 1551-1559
◽
Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach
2010 ◽
Vol 19
(7)
◽
pp. 929-943
◽